Unión Internacional de Telecomunicaciones   UIT
English  Français
 
Mapa Contáctenos Copia Imprimible
  Página principal : UIT-T : SG15 : Reunión 2011-02-14 : Contribuciones  Nuevo -  Busque los documentos de la reunión
   
UIT-T SG15  C (2011-02-14) 

UIT-T SG15

Transport network structures

Periodo de estudios 2009

Reunión  del 2011-02-14 al 2011-02-25

Lugar : Suiza [Ginebra]

Otras reuniones : 2012-09-10  2012-05-11  2011-12-05  2011-09-16  2010-10-22  2010-05-31  2010-01-15  2009-09-28  2009-05-15  2008-12-01 

Resultados :36 documentos
Contribuciones  [ AI/Cuestión: Q14/15 ]   Documents / Contributions
 
Número 
Título Origen AI/Cuestión
Fecha
[ 1518 ]  
 
Structuring of MPLS-TP Recommendations     Telefónica Investigación y Desarrollo   Q9/15, Q14/15, Q12/15, Q10/15   2011-02-11
[ 1496 ]  
 
Multilayer SCN Issues     Ciena Corporation   Q14/15, Q12/15   2011-02-02
[ 1495 ]  
 
G.8080 - SP10 - call routing     Ciena Corporation   Q14/15, Q12/15   2011-02-02
[ 1493 ]  
 
G.hao impact on G.7713     Ciena Corporation   Q14/15, Q11/15   2011-02-02
[ 1468 ]  
 
Transitional Link attributes for optical transponders and 3R regenerators in the OTN     Alcatel-Lucent   Q14/15, Q12/15   2011-02-02
[ 1461 ]  
 
Withdrawn by TSB (duplicate): See C-1439, "Comments on differentiation of MPLS-TP applications"     NSN   Q9/15, Q14/15, Q12/15, Q10/15   2011-02-02
[ 1447 ]  
 
Proposal for additional delay measurement functions in MPLS-TP OAM     NTT   Q9/15, Q14/15, Q10/15   2011-02-02
[ 1445 ]  
 
Adherence to In-Force Cooperation Agreements for the Development of MPLS-TP OAM Solutions     ISOC   Q9/15, Q14/15, Q12/15, Q10/15   2011-02-02
[ 1441 ]  
 
Withdrawn: MPLS-TP Standards     BT   Q9/15, Q14/15, Q12/15, Q10/15   2011-02-02
[ 1439 ]  
 
Comments on differentiation of MPLS-TP environments     NSN   Q9/15, Q14/15, Q12/15, Q10/15   2011-02-02
[ 1384 ]  
 
Structure and content of the MPLS-TP Recommendations     Telecom Italia   Q9/15, Q14/15, Q12/15, Q10/15   2011-02-01
[ 1372 ]  
 
Withdrawn: Continued cooperation with IETF on MPLS for Transport Networks     Israel   Q9/15, Q14/15, Q12/15, Q10/15   2011-02-01
[ 1362 ]  
 
Support for the consent of G.8110.1 and G.tpoam     SK Telecom , ETRI   Q9/15, Q14/15, Q12/15, Q10/15   2011-02-01
[ 1361 ]  
 
Structure of the MPLS-TP Recommendations     SK Telecom , ETRI   Q9/15, Q14/15, Q12/15, Q10/15   2011-02-01
[ 1327 ]  
 
Proposal to define MI for G-Ach packets     Fujitsu , Hitachi , NEC   Q9/15, Q14/15, Q10/15   2011-02-01
[ 1323 ]  
 
Proposed text to update clause 10 in G.8121     Fujitsu   Q9/15, Q14/15   2011-02-01
[ 1305 ]  
 
Procedural issues on MPLS-TP     Cisco , AT&T , BT , Juniper , Qwest , Telenor , Telstra , Verizon   Q9/15, Q3/15, Q14/15, Q12/15, Q11/15, Q10/15, Q1/15   2011-02-01
[ 1303 ]  
 
Inter SDO Cooperation on MPLS-TP     Cisco , AT&T , BT , Juniper , Qwest , Telenor , Telstra , Verizon   Q9/15, Q3/15, Q14/15, Q12/15, Q10/15, Q1/5   2011-02-01
[ 1301 ]  
 
Operator Requirements for MPLS-TP OAM     Verizon , BT , France Telecom Orange , Qwest , Telenor , Telstra   Q9/15, Q14/15, Q12/15, Q10/15   2011-02-01
[ 1298 ]  
 
MPLS-TP OAM - issues with the proposed Y.1731 based OAM solution     Juniper Networks , Cisco , NSN , Verizon   Q9/15, Q14/15, Q12/15, Q10/15   2011-02-01
[ 1295 ]  
 
Models in G.8010     Huawei , Deutsche Telekom   Q9/15, Q14/15, Q12/15   2011-02-01
[ 1279 ]  
 
Consideration on TS sequence in HAO     ZTE   Q14/15, Q12/15, Q11/15   2011-01-31
[ 1258 ]  
 
Comments on the requirement of the same number of tributary slots on every link along a resizable ODUflex connection in G.hao     ZTE   Q14/15, Q12/15, Q11/15   2011-01-31
[ 1256 ]  
 
Requirement for communication latency as a traffic engineering performance metric in ASON     ZTE   Q14/15, Q12/15   2011-01-31
[ 1248 ]  
 
PTN GACh+Y.1731 OAM interoperability test activities and result     CATR , China Mobile   Q9/15, Q14/15, Q12/15, Q10/15   2011-01-31
[ 1247 ]  
 
Support for the consent of G.8110.1 and G.tpoam     China MIIT   Q9/15, Q14/15, Q12/15, Q10/15   2011-01-31
[ 1207 ]  
 
Support for consent of G.tpoam     ZTE , Alcatel-Lucent Shanghai Bell , Fiberhome , Huawei   Q9/15, Q14/15, Q12/15, Q10/15   2011-01-31
[ 1167 ]  
 
PBB model for G.8021 & G.8010     Ericsson Canada   Q9/15, Q14/15, Q12/15   2011-01-31
[ 1164 ]  
 
MAC Operations using Y.1731     Alcatel-Lucent USA , Verizon   Q9/15, Q14/15, Q10/15   2011-01-31
[ 1161 ]  
 
MAC Operations using Y.1731 Motivation and Rationale     Alcatel-Lucent USA , Verizon   Q9/15, Q14/15, Q10/15   2011-01-31
[ 1143 ]  
(Rev.1) 
MPLS-TP Standards     United Kingdom   Q9/15, Q14/15, Q12/15, Q10/15   2011-01-28
[ 1141 ]  
 
Proposal for the OTN specific management entity of G.874.1     Fiberhome Technologies Group   Q14/15   2011-01-28
[ 1130 ]  
 
Add topoly usecase in G.8152     ZTE Corporation   Q14/15   2011-01-28
[ 1129 ]  
 
Add topoly support in G.8151     ZTE Corporation   Q14/15   2011-01-28
[ 1124 ]  
 
Structure and content of the MPLS-TP Recommendations     CMCC,CT , CATR   Q9/15, Q14/15, Q12/15, Q10/15   2011-01-28
[ 1123 ]  
 
Associated Channel Type for G.tpoam     CMCC, CT,CATR   Q9/15, Q14/15, Q12/15, Q10/15   2011-01-28
Resultados :36 documentos
 
Telecarga de múltiples documentos: Marcar las casillas correspondientes a los documentos seleccionados, a continuación pulsar "Telecargar"
   
 
Preferencias del usuario: 
Telecarga de múltiples documentos: Formatos e idiomas que hay que tener en cuenta (si están disponibles):
Páginas de navegación HTML  
Formatos  + Otros formatos
Idiomas (máximo 2)  + Multilingüe  
(E: inglés - F: francés - S: español - A: árabe - C: chino - R: ruso)

Pruebe ITU Translate, la herramienta de traducción automática de documentos
Comienzo de la página -  Comentarios -  Contáctenos -  Copyright © UIT 2008 Reservados todos los derechos
Contacto público :  TSB EDH
Actualizado el : 2024-11-19