Unión Internacional de Telecomunicaciones   UIT
English  Français
 
Mapa Contáctenos Copia Imprimible
  Página principal : UIT-T : SG15 : Contribuciones  Nuevo -  Busque los documentos de la reunión
   
UIT-T SG15  C 

UIT-T SG15

Transport network structures

Periodo de estudios 2009

Resultados :23 documentos
Contribuciones  [ Origen: Huawei ]  [ AI/Cuestión: Q4/15 ]   Documents / Contributions
 
Número 
Título Origen AI/Cuestión
Fecha
[ 1874 ]  
(Rev.1) 
G.vector: Initialization for Simultaneous Joining Lines     Huawei Technologies Co. Ltd.   Q4/15   2011-11-22
[ 1872 ]  
(Rev.1) 
G.fast: TDD Frame Structure and Timing Overhead     Huawei Technologies Co. Ltd.   Q4/15   2011-11-22
[ 1868 ]  
(Rev.1) 
G.fast: Point-to-Point Distribution is the Right Choice for G.fast     Huawei Technologies Co. Ltd.   Q4/15   2011-11-22
[ 1864 ]  
(Rev.1) 
G.fast: Equal-Length FEXT Measurements on PE05 Cable     Huawei Technologies Co. Ltd.   Q4/15   2011-11-22
[ 1862 ]  
(Rev.1) 
G.fast: Target Bit Error Rate of G.fast at Gamma Interface     Huawei Technologies Co. Ltd.   Q4/15   2011-11-22
[ 1242 ]  
 
G.gen, G.vdsl: An Introduction to Advances in Multi-Wire Transmission Technologies     Huawei   Q4/15   2011-01-31
[ 1241 ]  
 
G.vdsl: Updated Working Text for Distribution of Time-of-Day over VDSL2 Links     Huawei , China MIIT   Q4/15   2011-01-31
[ 1240 ]  
 
G.vector: A Comment on G.993.5 (04/2010)     Huawei   Q4/15   2011-01-31
[ 1046 ]  
 
G.vdsl: Proposed Text for Distribution of Time-of-Day over VDSL2 Links     Huawei , MIIT   Q4/15   2010-05-20
[ 1045 ]  
 
G.vdsl: More on Distribution of Time-of-Day over VDSL2 Links     Huawei , China Telecom , MIIT   Q4/15   2010-05-20
[ 712 ]  
 
G.vector: Proposed way forward on the issue of FDM pilots     Huawei Technologies , MII   Q4/15   2009-09-20
[ 711 ]  
 
G.vector: On Error Sample Quantization Format     Huawei Technologies , MII   Q4/15   2009-09-20
[ 710 ]  
 
G.vector: Line Stability after a Disorderly Leaving Event     Huawei Technologies , MII   Q4/15   2009-09-20
[ 316 ]  
 
G.inp: Updated Working Text for Physical-Layer Retransmission     MII, China, Huawei   Q4/15   2008-11-25
[ 315 ]  
 
G.inp: Simulation Results for Evaluation of Retransmission Methods     MII, China, Huawei   Q4/15   2008-11-25
[ 314 ]  
 
G.int: Proposal for Next-Generation LINK/PHY Interface     MII, China, Huawei, ZTE   Q4/15   2008-11-25
[ 313 ]  
 
G.vector: Preventing Disruption of Existing Lines During Joining     MII, China, Huawei   Q4/15   2008-11-25
[ 312 ]  
 
G.inp: More Simulation Results for Evaluation of Retransmission Methods     MII, China, Huawei   Q4/15   2008-11-25
[ 311 ]  
 
G.vdsl: Improving the Performance of Upstream Power Back-off     MII, China, Huawei   Q4/15   2008-11-25
[ 310 ]  
 
G.inp: Impact of Impulse Noise Sensor on Retransmission on Delta Interface     MII, China, Huawei   Q4/15   2008-11-25
[ 309 ]  
 
G.int: Comments on LINK/PHY Interface     MII, China, Huawei, ZTE   Q4/15   2008-11-25
[ 308 ]  
 
G.inp: An Updated Model for Retransmission between PMD and PMS-TC Sub-Layers     MII, China, Huawei   Q4/15   2008-11-25
[ 174 ]  
 
On the need to distribute accurate phase/Time-of-Day over DSL links     RAD Data Communications, Huawei   Q4/15, Q13/15   2008-11-21
Resultados :23 documentos
 
Telecarga de múltiples documentos: Marcar las casillas correspondientes a los documentos seleccionados, a continuación pulsar "Telecargar"
   
 
Preferencias del usuario: 
Telecarga de múltiples documentos: Formatos e idiomas que hay que tener en cuenta (si están disponibles):
Páginas de navegación HTML  
Formatos  + Otros formatos
Idiomas (máximo 2)  + Multilingüe  
(E: inglés - F: francés - S: español - A: árabe - C: chino - R: ruso)

Pruebe ITU Translate, la herramienta de traducción automática de documentos
Comienzo de la página -  Comentarios -  Contáctenos -  Copyright © UIT 2008 Reservados todos los derechos
Contacto público :  TSB EDH
Actualizado el : 2024-10-18