Unión Internacional de Telecomunicaciones   UIT
English  Français
 
Mapa Contáctenos Copia Imprimible
  Página principal : UIT-T : SG 15 : Reunión 2016-09-19 : Contribuciones  Nuevo -  Busque los documentos de la reunión
   
UIT-T SG 15  C (2016-09-19) 

UIT-T SG 15

Networks, Technologies and Infrastructures for Transport, Access and Home

Periodo de estudios 2013

Reunión  del 2016-09-19 al 2016-09-30

Lugar : Suiza [Ginebra]

Otras reuniones : 2016-02-15  2015-06-22  2014-11-24  2014-03-24  2013-12-06  2013-07-01  2013-02-01 

Resultados :23 documentos
Contribuciones  [ AI/Cuestión: Q6/15 ]   Documents / Contributions
 
Número 
Título Origen AI/Cuestión
Fecha
[ 2188 ]  
 
100G interoperability measurements up to 1600 km as in input to G.698.2     Deutsche Telekom AG   Q6/15   2016-09-06
[ 2156 ]  
+Corr.1 
Proposal to modify procedural agreement between Q11 and Q6 regarding strong HD-FEC     Deutsche Telekom AG , Acacia , Alcatel-Lucent USA , China Unicom , Cisco , Comcast , Coriant , Fujitsu , Inphi , Juniper , LM Ericsson , NTT , Orange , Telecom Italia , Telefon AB , Telefonica   Q6/15, Q11/15   2016-09-06
[ 2148 ]  
(Rev.1-2) 
Staircase FEC as a candidate for Standard OTU4 MV IaDI Metro application     Deutsche Telekom AG , Acacia , China Unicom , Cisco , Comcast , Coriant , Fujitsu , Inphi , Juniper , LM Ericsson , NTT , Orange , Telecom Italia , Telefon AB , Telefonica   Q6/15, Q11/15   2016-09-06
[ 2144 ]  
 
Test of EVM scripts for draft revised G.698.2     Huawei Technologies Co., Ltd.   Q6/15   2016-09-06
[ 2143 ]  
 
Considerations on optical transceiver module for G.metro     China Unicom , Huawei Technologies Co., Ltd.   Q6/15   2016-09-06
[ 2126 ]  
 
Proposal to enhance the description of the NOSM in G.872     ZTE Corporation   Q6/15, Q12/15   2016-09-06
[ 2052 ]  
 
Requirement of clarify optical layer parameter for some new use cases     China Unicom   Q9/15, Q6/15   2016-09-05
[ 2047 ]  
 
Wavelength plan consideration of G.metro     China Unicom , ZTE Corporation   Q6/15   2016-09-05
[ 2045 ]  
 
Proposal to study OSNR related issues of beyond 100G physical interface     China Unicom , ZTE Corporation   Q6/15   2016-09-05
[ 2044 ]  
 
Proposal of communication channel from TEE to HEE in G.metro     China Unicom   Q6/15   2016-09-05
[ 2043 ]  
 
EVM related test results     China Unicom   Q6/15   2016-09-05
[ 2041 ]  
 
Request for information about the SG15/Q6 working process and time schedule to address the application codes and use cases of operators, as well as their interoperability needs at 100G.     China Telecommunications Corporation , Orange   Q6/15   2016-09-05
[ 2016 ]  
 
Proposal of reference point specification clarification for optical line interfaces of G.692     FiberHome Technologies Group   Q6/15, Q12/15   2016-09-05
[ 2000 ]  
 
Wavelength Plan Proposal for G.metro     ADVA Optical Networking , British Telecommunications Public Ltd. Co. (BT Plc) , Telefon AB - LM Ericsson   Q6/15   2016-09-05
[ 1983 ]  
 
EVM test of commercial transponders and impairment simulation setup     Ministry of Industry and Information Technology (MIIT)   Q6/15   2016-09-05
[ 1979 ]  
 
Band Gap and Wavelength Plan Proposal for G.metro     Finisar Corporation   Q6/15   2016-09-04
[ 1945 ]  
 
Proposed modification to Clause 8 of G.872     ZTE Corporation   Q6/15, Q12/15   2016-09-02
[ 1943 ]  
 
Parameters for pilot tones and message channel for G.metro     ADVA Optical Networking , British Telecommunications Public Ltd. Co. (BT Plc) , China Unicom , Telefon AB - LM Ericsson   Q6/15   2016-09-02
[ 1942 ]  
 
Appendix on Principles of Operation for G.metro     ADVA Optical Networking , British Telecommunications Public Ltd. Co. (BT Plc) , China Unicom , Telefon AB - LM Ericsson   Q6/15   2016-09-02
[ 1933 ]  
 
considerations about the wavelength plan of G.metro     ZTE Corporation   Q6/15   2016-09-02
[ 1932 ]  
 
Considerations on the EVM in the G.698.2     ZTE Corporation , CAICT , Ministry of Industry and Information Technology (MIIT)   Q6/15   2016-09-02
[ 1921 ]  
 
Physical Layer Implementation Guidance for "Open Line Systems"     Xtera Communications, Inc.   Q6/15   2016-09-01
[ 1919 ]  
 
Impact of pilot tone and message channel on the payload in G.metro     ADVA Optical Networking   Q6/15   2016-09-01
Resultados :23 documentos
 
Telecarga de múltiples documentos: Marcar las casillas correspondientes a los documentos seleccionados, a continuación pulsar "Telecargar"
   
 
Preferencias del usuario: 
Telecarga de múltiples documentos: Formatos e idiomas que hay que tener en cuenta (si están disponibles):
Páginas de navegación HTML  
Formatos  + Otros formatos
Idiomas (máximo 2)  + Multilingüe  
(E: inglés - F: francés - S: español - A: árabe - C: chino - R: ruso)

Pruebe ITU Translate, la herramienta de traducción automática de documentos
Comienzo de la página -  Comentarios -  Contáctenos -  Copyright © UIT 2008 Reservados todos los derechos
Contacto público :  TSB EDH
Actualizado el : 2024-8-16