Contribuciones
[ Origen: British Telecommunications Public Ltd. Co. (BT Plc) ] [ AI/Cuestión: Q4/15 ] |
|
Número
|
Título
|
Origen
|
AI/Cuestión
|
Fecha
|
|
[ 2210 ]
|
G.fast: Maximal Ratio Transmission over FEXT channels
|
British Telecommunications Public Ltd. Co. (BT Plc)
|
Q4/15
|
2016-09-06 |
|
[ 2209 ]
|
G.fast: On mixed sampling frequency G.fast vector groups
|
British Telecommunications Public Ltd. Co. (BT Plc)
|
Q4/15
|
2016-09-06 |
|
[ 2208 ]
|
G.fast: Zero Forcing Pre-coder optimisation
|
British Telecommunications Public Ltd. Co. (BT Plc)
|
Q4/15
|
2016-09-06 |
|
[ 2182 ]
|
VDSL: Long Reach VDSL2
|
British Telecommunications Public Ltd. Co. (BT Plc)
|
Q4/15
|
2016-09-06 |
|
[ 2170 ]
|
G.fast: Mobile backhaul use cases
|
British Telecommunications Public Ltd. Co. (BT Plc)
|
Q4/15
|
2016-09-06 |
|
[ 2146 ]
(Rev.1) |
G.fast: A framework for seamless reconfiguration
|
British Telecommunications Public Ltd. Co. (BT Plc)
,
Intel Corporation
|
Q4/15
|
2016-09-06 |
|
[ 1806 ]
|
Future work on G.fast recommendations
|
British Telecommunications Public Ltd. Co. (BT Plc)
|
Q4/15
|
2016-02-02 |
|
[ 1805 ]
|
G.fast, Editorial Correction to Figure Z-2.1
|
British Telecommunications Public Ltd. Co. (BT Plc)
|
Q4/15
|
2016-02-02 |
|
[ 1791 ]
|
G.fast: On data rate reporting
|
British Telecommunications Public Ltd. Co. (BT Plc)
|
Q4/15
|
2016-02-02 |
|
[ 1783 ]
|
G.fast: Upstream Hlog reporting
|
British Telecommunications Public Ltd. Co. (BT Plc)
|
Q4/15
|
2016-02-02 |
|
[ 1782 ]
|
G.ploam, Capability reporting in G.997.1 and G.997.2
|
British Telecommunications Public Ltd. Co. (BT Plc)
|
Q4/15
|
2016-02-02 |
|
[ 1774 ]
|
On G.fast based solution for Coax application
|
British Telecommunications Public Ltd. Co. (BT Plc)
,
Futurewei Technologies US R&D Center
|
Q4/15
|
2016-02-02 |
|
[ 1499 ]
|
Release of BT cable (20 pair) NEXT measurements for use in simulations
|
British Telecommunications Public Ltd. Co. (BT Plc)
|
Q4/15
|
2015-12-10 |
|
[ 1458 ]
|
G.fast changes to G.9701 (2014) to support Cross-Layer Low Power Mode Control Annex
|
British Telecommunications Public Ltd. Co. (BT Plc)
|
Q4/15
|
2015-06-09 |
|
[ 1448 ]
|
G.fast Cross-Layer Low Power Mode Control Annex in Draft Amendment 1 to Recommendation ITU-T G.9701 (2014)
|
British Telecommunications Public Ltd. Co. (BT Plc)
|
Q4/15
|
2015-06-09 |
|
[ 1422 ]
+Add.1 |
G.fast: Release of BT cable (100 pair) measurements for use in simulations
|
British Telecommunications Public Ltd. Co. (BT Plc)
|
Q4/15
|
2015-06-09 |
|
[ 1420 ]
|
G.997.1/G.998.4 Retransmission Counters
|
British Telecommunications Public Ltd. Co. (BT Plc)
|
Q4/15
|
2015-06-09 |
|
[ 1413 ]
|
G.fast Amendment 2 Priorities
|
AT&T, Inc.
,
British Telecommunications Public Ltd. Co. (BT Plc)
,
CenturyLink
,
Deutsche Telekom AG
,
Orange
,
Swisscom SA
,
Telecom Italia S.p.A.
|
Q4/15
|
2015-06-09 |
|
[ 1385 ]
|
G.fast Low power Mode Control Managed Objects for G.997.2
|
British Telecommunications Public Ltd. Co. (BT Plc)
|
Q4/15
|
2015-06-09 |
|
[ 1110 ]
|
G.9700 Out of band noise requirements
|
British Telecommunications Public Ltd. Co. (BT Plc)
|
Q4/15
|
2014-11-11 |
|
[ 1108 ]
|
G.VDSL: Immunity of VDSL2 to out of band interference from G.fast
|
British Telecommunications Public Ltd. Co. (BT Plc)
|
Q4/15
|
2014-11-11 |
|
[ 1099 ]
|
G.hs, G.fast: Handshake tones for G.fast
|
British Telecommunications Public Ltd. Co. (BT Plc)
|
Q4/15
|
2014-11-11 |
|
[ 1053 ]
|
On DRRus report format to support queue fill and traffic arrival triggers for LPM state changes
|
British Telecommunications Public Ltd. Co. (BT Plc)
|
Q4/15
|
2014-11-11 |
|
[ 775 ]
(Rev.1) |
G.fast: BT TAP comments on G.9700 (ex G.fast-PSD)
|
British Telecommunications Public Ltd. Co. (BT Plc)
|
Q4/15
|
2014-03-11 |
|
[ 773 ]
|
G.997.1: On extending G.997.1 to support PMA functionality
|
British Telecommunications Public Ltd. Co. (BT Plc)
|
Q4/15
|
2014-03-11 |
|
[ 772 ]
|
G.fast: On Reverse Power Feeding system noise requirements
|
British Telecommunications Public Ltd. Co. (BT Plc)
|
Q4/15
|
2014-03-11 |
|
[ 750 ]
(Rev.1) |
VDSL2 and G.FAST need a flexible protection mechanism against time varying noise.
|
British Telecommunications Public Ltd. Co. (BT Plc)
|
Q4/15
|
2014-03-11 |
|
[ 665 ]
|
G.fast: On the scope of G.fast Amendment 1
|
British Telecommunications Public Ltd. Co. (BT Plc)
|
Q4/15
|
2014-03-10 |
|
[ 664 ]
|
G.fast: On standardisation of advanced UPBO methods for vectored G.fast
|
British Telecommunications Public Ltd. Co. (BT Plc)
|
Q4/15
|
2014-03-10 |
|
[ 439 ]
(Rev.1) |
[FAST] Proposal for improvements to draft text for G.fast-psd
|
British Telecommunications Public Ltd. Co. (BT Plc)
|
Q4/15
|
2013-06-18 |
|
[ 438 ]
|
Extended RAM and Retransmission in VDSL2 on Vector Capable Hardware
|
British Telecommunications Public Ltd. Co. (BT Plc)
|
Q4/15
|
2013-06-18 |
|
[ 436 ]
|
[FAST] On Aggregate Transmitter Power
|
British Telecommunications Public Ltd. Co. (BT Plc)
|
Q4/15
|
2013-06-18 |
|
[ 434 ]
|
[FAST] On Power Budget
|
British Telecommunications Public Ltd. Co. (BT Plc)
|
Q4/15
|
2013-06-18 |
|
[ 431 ]
(Rev.1) |
[FAST] On VHF background noise assumptions for G.FAST
|
British Telecommunications Public Ltd. Co. (BT Plc)
|
Q4/15
|
2013-06-18 |
|
[ 413 ]
|
[FAST] Low Power Mode Requirements for G.FAST
|
British Telecommunications Public Ltd. Co. (BT Plc)
|
Q4/15
|
2013-06-18 |
Resultados :35 documentos
|
Telecarga de múltiples documentos: Formatos e idiomas que hay que tener en cuenta (si están disponibles):