Unión Internacional de Telecomunicaciones   UIT
English  Français
 
Mapa Contáctenos Copia Imprimible
  Página principal : UIT-T : SG 15 : Contribuciones  Nuevo -  Busque los documentos de la reunión
   
UIT-T SG 15  C 

UIT-T SG 15

Networks, Technologies and Infrastructures for Transport, Access and Home

Periodo de estudios 2013

Resultados :37 documentos
Contribuciones  [ Origen: Cisco ]   Documents / Contributions
 
Número 
Título Origen AI/Cuestión
Fecha
[ 2156 ]  
+Corr.1 
Proposal to modify procedural agreement between Q11 and Q6 regarding strong HD-FEC     Deutsche Telekom AG , Acacia , Alcatel-Lucent USA , China Unicom , Cisco , Comcast , Coriant , Fujitsu , Inphi , Juniper , LM Ericsson , NTT , Orange , Telecom Italia , Telefon AB , Telefonica   Q6/15, Q11/15   2016-09-06
[ 2148 ]  
(Rev.1-2) 
Staircase FEC as a candidate for Standard OTU4 MV IaDI Metro application     Deutsche Telekom AG , Acacia , China Unicom , Cisco , Comcast , Coriant , Fujitsu , Inphi , Juniper , LM Ericsson , NTT , Orange , Telecom Italia , Telefon AB , Telefonica   Q6/15, Q11/15   2016-09-06
[ 2042 ]  
 
Leap second behaviour on PTP clocks [G.8265.1, G.8275.1, G8275.2]     Cisco Systems, Inc.   Q13/15   2016-09-05
[ 1849 ]  
(Rev.1) 
Proposal for MDSP compromise     ADVA Optical Networking , Alcatel-Lucent USA Inc. , Cisco Systems, Inc.   Q9/15   2016-02-02
[ 1454 ]  
 
Optical Power Monitors for the G.698.2 Application in Support of Access Link Power Monitoring and Power Control     Alcatel-Lucent International , Alcatel-Lucent USA Inc. , Cisco Systems, Inc. , Deutsche Telekom AG   Q6/15, Q14/15, Q12/15   2015-06-09
[ 1077 ]  
 
Clarification regarding G.8121 series Study Point 12     Cisco Systems, Inc.   Q14/15, Q10/15   2014-11-11
[ 1074 ]  
 
Clarifications for G.8121 series Study Point 10     Cisco Systems, Inc.   Q14/15, Q10/15   2014-11-11
[ 1072 ]  
 
Editorial Issues in Gsup.ethpm     Cisco Systems, Inc.   Q14/15, Q10/15   2014-11-11
[ 1071 ]  
 
Additional content for Gsup.ethpm     Cisco Systems, Inc.   Q14/15, Q10/15   2014-11-11
[ 1070 ]  
 
Structure of Gsup.ethpm     Cisco Systems, Inc.   Q14/15, Q10/15   2014-11-11
[ 1069 ]  
 
Clarifications on Expected Defects in G.8021     Cisco Systems, Inc.   Q10/15   2014-11-11
[ 1068 ]  
 
Clarifications on Bandwidth Notifications in G.8021     Cisco Systems, Inc.   Q10/15   2014-11-11
[ 1067 ]  
 
Editorial corrections in G.8013 clause 2     Cisco Systems, Inc.   Q10/15   2014-11-11
[ 1066 ]  
 
Use of MCC for EDM PDUs     Cisco Systems, Inc.   Q10/15   2014-11-11
[ 1065 ]  
 
Adding reference to MEF46 in G.8013     Cisco Systems, Inc.   Q10/15   2014-11-11
[ 1064 ]  
 
Status of references to MEF IAs in G.8011     Cisco Systems, Inc.   Q10/15   2014-11-11
[ 991 ]  
 
Receiver implementation of measurements presented in WD06-31     Cisco Systems, Inc. , Deutsche Telekom AG Standardization   Q6/15   2014-11-10
[ 449 ]  
 
Text changes in G.8021 for Expected Defect signalling     Cisco Systems, Inc.   Q10/15   2014-02-24
[ 447 ]  
 
Text changes in G.8013 for Expected Defect signalling     Cisco Systems, Inc.   Q10/15   2014-02-24
[ 446 ]  
 
Expected Defect signalling in G.8013 Ethernet OAM     Cisco Systems, Inc.   Q10/15   2014-02-24
[ 445 ]  
 
Text changes in G.8021 for Adaptive Bandwidth Notifications     Cisco Systems, Inc. , Huawei Technologies Co. Ltd.   Q10/15   2014-02-24
[ 444 ]  
 
Text changes in G.8013 for Adaptive Bandwidth Notifications     Cisco Systems, Inc. , Huawei Technologies Co. Ltd.   Q10/15   2014-02-24
[ 443 ]  
 
Adaptive Bandwidth Notifications in G.8013 Ethernet OAM     China Mobile Communications Corporation , Cisco Systems, Inc. , Huawei Technologies Co. Ltd.   Q10/15   2014-02-24
[ 258 ]  
 
PTP Equipment Classification [G.8273.2, G.8273, G.8271.1]     Cisco Systems, Inc. , Vitesse Semiconductor Corporation   Q13/15   2013-06-17
[ 18 ]  
 
Text Changes in G.8021 for At Risk signalling     Cisco Systems, Inc.   Q9/15, Q14/15, Q10/15   2013-05-31
[ 17 ]  
 
Text changes in Y.1731 for At Risk signalling     Cisco Systems, Inc.   Q9/15, Q10/15   2013-05-31
[ 16 ]  
 
"At Risk" signalling in Y.1731 Ethernet OAM     Cisco Systems, Inc.   Q9/15, Q14/15, Q10/15   2013-05-31
[ 14 ]  
 
LCK/AIS Reception Process in G.8121.2     Cisco Systems, Inc.   Q9/15, Q10/15   2013-05-29
[ 12 ]  
 
Clarification regarding Dataplane Loopback in G.8121.2     Cisco Systems, Inc.   Q9/15, Q10/15   2013-05-29
[ 11 ]  
 
Clarification regarding Dataplane Loopback in G.8121     Cisco Systems, Inc.   Q9/15, Q10/15   2013-05-29
[ 10 ]  
 
Definition of Diagnostic Adapted Information in G.8121     Cisco Systems, Inc.   Q9/15, Q12/15, Q10/15   2013-05-29
[ 9 ]  
 
Description of Sub-processes in G.8121.2     Cisco Systems, Inc.   Q9/15, Q10/15   2013-05-29
[ 8 ]  
 
Comparison of sub-process in Clause 8.8 between G.8121.1 and G.8121.2     Cisco Systems, Inc.   Q9/15, Q10/15   2013-05-29
[ 7 ]  
 
Proposed Text for Clauses 3 and 5 in G.8121.2     Cisco Systems, Inc.   Q9/15, Q10/15   2013-05-29
[ 6 ]  
 
Minor corrections in Y.1731 Clause 9     Cisco Systems, Inc.   Q10/15   2013-05-28
[ 5 ]  
 
Allocation of Y.1731 TLV Types for MEF Control Protocols     Alcatel-Lucent USA Inc. , Cisco Systems, Inc.   Q9/15, Q10/15   2013-05-28
[ 4 ]  
 
Assigning Y.1731 OpCodes for MEF Control Protocols     Alcatel-Lucent USA Inc. , Cisco Systems, Inc.   Q9/15, Q10/15   2013-05-28
Resultados :37 documentos
 
Telecarga de múltiples documentos: Marcar las casillas correspondientes a los documentos seleccionados, a continuación pulsar "Telecargar"
   
 
Preferencias del usuario: 
Telecarga de múltiples documentos: Formatos e idiomas que hay que tener en cuenta (si están disponibles):
Páginas de navegación HTML  
Formatos  + Otros formatos
Idiomas (máximo 2)  + Multilingüe  
(E: inglés - F: francés - S: español - A: árabe - C: chino - R: ruso)

Pruebe ITU Translate, la herramienta de traducción automática de documentos
Comienzo de la página -  Comentarios -  Contáctenos -  Copyright © UIT 2008 Reservados todos los derechos
Contacto público :  TSB EDH
Actualizado el : 2024-11-19