Contribuciones
[ Origen: Bourns Limited ] [ AI/Cuestión: Q2/5 ] |
|
Número
|
Título
|
Origen
|
AI/Cuestión
|
Fecha
|
|
[ 854 ]
|
Reply template to cover sheet of T17-SG05-211130-TD-GEN-1984 received liaison
|
Bourns Limited (United Kingdom)
|
Q2/5
|
2021-11-16 |
|
[ 824 ]
(Rev.1) |
AAP K.147 comments on Annex A, Annex B and Bibliography
|
Bourns Limited (United Kingdom)
|
Q2/5
|
2021-11-14 |
|
[ 823 ]
(Rev.1) |
AAP K.147 comments on Clause 9
|
Bourns Limited (United Kingdom)
|
Q2/5
|
2021-11-14 |
|
[ 822 ]
(Rev.1) |
AAP K.147 comments on Clause 7 and 8
|
Bourns Limited (United Kingdom)
|
Q2/5
|
2021-11-14 |
|
[ 821 ]
(Rev.1) |
AAP K.147 comments on Clause 6
|
Bourns Limited (United Kingdom)
|
Q2/5
|
2021-11-14 |
|
[ 820 ]
(Rev.1) |
AAP K.147 comments on Title, Scope, Normative References and Definitions
|
Bourns Limited (United Kingdom)
|
Q2/5
|
2021-11-14 |
|
[ 809 ]
|
ITU-T K.117 - Long reach single twisted-pair Ethernet resistibility testing
|
Bourns Limited (United Kingdom)
|
Q2/5
|
2021-04-28 |
|
[ 800 ]
|
Correction of Figure 3 drawing error in K.50 Amendment 1(06/2020)
|
Bourns Limited (United Kingdom)
|
Q2/5
|
2021-04-28 |
|
[ 752 ]
|
Ethernet terms from ISO/IEC
|
Bourns Limited (United Kingdom)
|
Q8/5, Q2/5
|
2021-04-09 |
|
[ 751 ]
(Rev.1) |
IEEE-SA 802.3 content licencing for ITU-T Recommendation K.147
|
Bourns Limited (United Kingdom)
|
Q8/5, Q2/5
|
2021-04-07 |
|
[ 750 ]
|
Phantom powering
|
Bourns Limited (United Kingdom)
|
Q8/5, Q2/5
|
2021-04-06 |
|
[ 749 ]
(Rev.1) |
Simplifying K.147 Tables 2 and 3 to show just the protection parameters
|
Bourns Limited (United Kingdom)
|
Q2/5
|
2021-03-27 |
|
[ 748 ]
(Rev.1) |
Simplifying K.147 Annex A
|
Bourns Limited (United Kingdom)
|
Q2/5
|
2021-03-22 |
|
[ 746 ]
(Rev.1) |
Objectives of K.147 and comments on SG05-C-0745
|
Bourns Limited (United Kingdom)
|
Q2/5
|
2021-03-19 |
|
[ 734 ]
(Rev.2) |
Proposed single pair Ethernet (SPE) protector resistibility testing supplement for ITU-T Recommendation K.117: "Primary protector parameters for the surge protection of equipment Ethernet ports"
|
Bourns Limited (United Kingdom)
|
Q2/5
|
2020-10-06 |
|
[ 731 ]
(Rev.1) |
Proposed Ethernet port isolation and insulation supplement for ITU-T Recommendation K.147 Ethernet port resistibility testing for overvoltages and overcurrents
|
Bourns Limited (United Kingdom)
|
Q2/5
|
2020-10-06 |
|
[ 730 ]
|
Proposed Corrigendum 1 to ITU-T Recommendation K.50
|
Bourns Limited (United Kingdom)
|
Q2/5
|
2020-10-06 |
|
[ 729 ]
|
Proposed Corrigendum 1 to ITU-T Recommendation K.44
|
Bourns Limited (United Kingdom)
|
Q2/5
|
2020-10-06 |
|
[ 717 ]
|
Proposed Corrigendum 1 to ITU-T Recommendation K.147
|
Bourns Limited (United Kingdom)
|
Q2/5
|
2020-10-05 |
|
[ 675 ]
(Rev.1) |
A.1 justification for proposed draft new Recommendation K.gm
|
Bourns Limited (United Kingdom)
|
Q2/5
|
2020-04-28 |
|
[ 674 ]
(Rev.1) |
Outline of K.gm: Test Methods and preferred values for hybrid integrated circuit components containing gas discharge tube and metal oxide varistor technologies
|
Bourns Limited (United Kingdom)
|
Q2/5
|
2020-04-28 |
|
[ 666 ]
(Rev.1) |
K.Eth: Ethernet port resistibility testing for overvoltages and overcurrents
|
Bourns Limited (United Kingdom)
|
Q2/5
|
2020-04-28 |
|
[ 657 ]
(Rev.1) |
Revised K.64 Base Text to align with new safety standards
|
Bourns Limited (United Kingdom)
|
Q2/5
|
2020-04-28 |
|
[ 656 ]
(Rev.1) |
Anomaly in Annex A of K.21 and K.45
|
Bourns Limited (United Kingdom)
|
Q2/5
|
2020-04-28 |
|
[ 612 ]
(Rev.1) |
Proposed Corrigendum 2 to Recommendation ITU-T K.98
|
Bourns Limited (United Kingdom)
|
Q2/5
|
2020-04-20 |
|
[ 609 ]
|
Proposed Amendment 1 to Recommendation ITU-T K.50
|
Bourns Limited (United Kingdom)
|
Q2/5
|
2020-03-30 |
|
[ 539 ]
|
Directives Volume VIII review
|
Bourns Limited (United Kingdom)
|
Q2/5
|
2019-08-22 |
|
[ 495 ]
|
Proposed new work item on draft Supplement ITU-T K.Sup.telecom_system to ITU-T K.44 "Causes of telecommunication system overvoltage and overcurrent conditions and their expected levels"
|
Bourns Limited (United Kingdom)
|
Q2/5
|
2019-04-30 |
|
[ 494 ]
|
Proposed new work item on draft Supplement ITU-T K.Sup.Test_conditions to ITU-T K.44 "Test conditions and methods"
|
Bourns Limited (United Kingdom)
|
Q2/5
|
2019-04-30 |
|
[ 428 ]
(Rev.1) |
Reducing the size of ITU-T Recommendation K.44
|
Bourns Limited (United Kingdom)
|
Q2/5
|
2019-04-22 |
|
[ 417 ]
(Rev.1) |
Completion of the missing information on the capacitor used in tests
|
Bourns Limited (United Kingdom)
|
Q2/5
|
2019-04-05 |
|
[ 394 ]
|
Variants of IEEE 802.3 Ethernet Standard implementations
|
Bourns Limited
|
Q2/5
|
2018-08-29 |
|
[ 386 ]
|
MOV terms - Annotated IEC 61051-1 ed. 3 review
|
Bourns Limited
|
Q2/5
|
2018-08-29 |
|
[ 321 ]
(Rev.1) |
2nd draft of K.rcd "Technical parameters for residual current operated protective devices with automatic reclosing feature for telecom applications"
|
Bourns Limited (United Kingdom)
,
China Telecommunications Corporation
|
Q2/5
|
2018-08-24 |
|
[ 319 ]
|
Pluggable equipment Type A IEC 62368-1 protection circuit examples for possible inclusion in K.128
|
Bourns Limited
|
Q2/5
|
2018-08-11 |
|
[ 309 ]
(Rev.1) |
Review of IEC 62368-1 varistor requirements for possible inclusion in K.77
|
Bourns Limited
|
Q2/5
|
2018-07-29 |
|
[ 307 ]
|
LTspice simulation of metal oxide varistors, MOVs, and the definition of an MOV
|
Bourns Limited
|
Q2/5
|
2018-07-23 |
|
[ 305 ]
|
Clauses applicable to external circuits in IEC 62368-1 Edition 3
|
Bourns Limited
|
Q2/5
|
2018-07-17 |
|
[ 303 ]
|
DC power interface surge analysis - tests 7.8 and 7.9 of K.20 and K.21
|
Bourns Limited
|
Q2/5
|
2018-07-13 |
|
[ 302 ]
(Rev.1) |
Re-review of C261 (K.21 contribution)
|
Bourns Limited
|
Q2/5
|
2018-07-06 |
|
[ 301 ]
(Rev.1) |
Re-review of C244 (K.20 contribution)
|
Bourns Limited
|
Q2/5
|
2018-07-06 |
|
[ 300 ]
|
Re-review of C243 (K.44 contribution)
|
Bourns Limited
|
Q2/5
|
2018-07-06 |
|
[ 299 ]
|
Testing equipment-powering ports that are not connected to the AC mains supply - Part 9: Proposal consolidation of C291 to C298
|
Bourns Limited
|
Q2/5
|
2018-07-05 |
|
[ 298 ]
|
Testing equipment-powering ports that are not connected to the AC mains supply - Part 8: Updating K.44 for 400 V d.c. powering
|
Bourns Limited
|
Q2/5
|
2018-07-04 |
|
[ 297 ]
|
Testing equipment-powering ports that are not connected to the AC mains supply - Part 7: Test circuit figure to replace K.44 Figure A.6.6-2, Figure A.6.6-1a and Figure A.6.6-1b.
|
Bourns Limited
|
Q2/5
|
2018-07-03 |
|
[ 296 ]
|
Testing equipment-powering ports that are not connected to the AC mains supply - Part 6: Review of 7.8 and 7.9 test entries (K.20 and K.21)
|
Bourns Limited
|
Q2/5
|
2018-07-03 |
|
[ 295 ]
|
Testing equipment-powering ports that are not connected to the AC mains supply - Part 5: Review of DC power feed surge test figures of Table 1b (K.20, K.21 and K.45)
|
Bourns Limited
|
Q2/5
|
2018-07-02 |
|
[ 294 ]
|
Testing equipment-powering ports that are not connected to the AC mains supply - Part 4: DC power feed tests of Tables 1a and 1b (K.20, K.21 and K.45)
|
Bourns Limited
|
Q2/5
|
2018-07-01 |
|
[ 293 ]
|
Testing equipment-powering ports that are not connected to the AC mains supply - Part 3: Powering supply configurations
|
Bourns Limited
|
Q2/5
|
2018-06-30 |
|
[ 292 ]
|
Testing equipment-powering ports that are not connected to the AC mains supply - Part 2: Grid terms review
|
Bourns Limited
|
Q2/5
|
2018-06-30 |
Resultados :78 documentos Resultados :
1 -
2
- Siguiente
|
Telecarga de múltiples documentos: Formatos e idiomas que hay que tener en cuenta (si están disponibles):