Unión Internacional de Telecomunicaciones   UIT
English  Français
 
Mapa Contáctenos Copia Imprimible
  Página principal : UIT-T : SG 15 : Reunión 2017-06-19 : Contribuciones  Nuevo -  Busque los documentos de la reunión
   
UIT-T SG 15  C (2017-06-19) 

UIT-T SG 15

Transport, access and home

Periodo de estudios 2017

Reunión  del 2017-06-19 al 2017-06-30

Lugar : Suiza [Ginebra]

Otras reuniones : 2021-12-06  2021-04-12  2020-09-07  2020-01-27  2019-07-01  2018-10-08  2018-01-29 

Resultados :28 documentos
Contribuciones  [ Origen: Ministry of Industry and Information Technology (MIIT) (China) ]   Documents / Contributions
 
Número 
Título Origen AI/Cuestión
Fecha
[ 365 ]  
 
Proposal for new Recommendation Optical fibre cables for in-home directly wall surface applications- Correspondence summary  
Document withdrawn - Posted as TD37/WP2
 
China Mobile Communications Corporation , China Unicom , FiberHome Technologies Group (China) , Ministry of Industry and Information Technology (MIIT) (China)   Q16/15   2017-06-06
[ 330 ]  
 
Proposals for control component interaction in 8.3.1 and 8.3.2 of G.7702     China Unicom , Huawei Technologies Co., Ltd. (China) , Ministry of Industry and Information Technology (MIIT) (China)   Q14/15, Q12/15   2017-06-06
[ 285 ]  
 
Proposal on new Recommendation "Optical fibre cables for in-home directly wall surface applications"     China Mobile Communications Corporation , China Unicom , FiberHome Technologies Group (China) , Ministry of Industry and Information Technology (MIIT) (China)   Q16/15   2017-06-06
[ 246 ]  
 
Proposal to enhance flexible grid related content in draft revised G.672     Huawei Technologies Co., Ltd. (China) , Ministry of Industry and Information Technology (MIIT) (China)   Q7/15   2017-06-06
[ 232 ]  
 
Proposals to component interactions for performance and alarm monitoring and reporting in draft G.7702     Ministry of Industry and Information Technology (MIIT) (China)   Q14/15, Q12/15   2017-06-06
[ 226 ]  
 
Simulation results on the influence of atomic clock group change on combinatorial clock output performance.     Ministry of Industry and Information Technology (MIIT) (China)   Q13/15   2017-06-06
[ 225 ]  
 
G.vlc: discussions on the necessity of the broadcast of LLC frame in CM mode     Ministry of Industry and Information Technology (MIIT) (China)   Q18/15   2017-06-06
[ 224 ]  
 
An implementation of ePRC based on optical clock     Ministry of Industry and Information Technology (MIIT) (China)   Q13/15   2017-06-06
[ 223 ]  
 
Some consideration for TDEV tolerance noise in G.812     Huawei Technologies Co., Ltd. (China) , Ministry of Industry and Information Technology (MIIT) (China)   Q13/15   2017-06-06
[ 222 ]  
 
Propose to review the terminology "switch time" and "transfer time" in Q9/15     Huawei Technologies Co., Ltd. (China) , Ministry of Industry and Information Technology (MIIT) (China)   Q9/15   2017-06-06
[ 221 ]  
 
Some suggestions for the definition of phase discontinuity in G.811.1     Ministry of Industry and Information Technology (MIIT) (China)   Q13/15   2017-06-06
[ 220 ]  
 
A potential solution for combinatorial clock optimization in G.811.1     Ministry of Industry and Information Technology (MIIT) (China)   Q13/15   2017-06-06
[ 215 ]  
 
G.vlc: on the medium independent specification of MIMO     Ministry of Industry and Information Technology (MIIT) (China)   Q18/15   2017-06-06
[ 214 ]  
 
EVM related test results of commercial transponders     Ministry of Industry and Information Technology (MIIT) (China) , China Mobile , ZTE Corporation (China)   Q6/15   2017-06-06
[ 213 ]  
 
Some suggestions on the progress of G.698.2     Ministry of Industry and Information Technology (MIIT) (China) , ZTE Corporation (China)   Q6/15   2017-06-06
[ 212 ]  
 
Proposed revision of Appendix V to G.959.1     Ministry of Industry and Information Technology (MIIT) (China)   Q6/15   2017-06-06
[ 169 ]  
 
Architecture Requirement of 5G transport network     China Mobile Communications Corporation , FiberHome Technologies Group (China) , Ministry of Industry and Information Technology (MIIT) (China) , ZTE Corporation (China)   Q12/15, Q11/15, Q10/15   2017-06-05
[ 159 ]  
 
Standards Gap Analysis of FlexE     China Mobile Communications Corporation , FiberHome Technologies Group (China) , Ministry of Industry and Information Technology (MIIT) (China) , ZTE Corporation (China)   Q9/15, Q10/15   2017-06-05
[ 157 ]  
 
Requirements of future 5G mobile transport network     China Mobile Communications Corporation , China Telecommunications Corporation , China Unicom , Ministry of Industry and Information Technology (MIIT) (China)   Q14/15, Q13/15, Q12/15, Q11/15, Q10/15   2017-06-05
[ 154 ]  
 
Proposal to start new projects to specify 5G transport over OTN     China Mobile Communications Corporation , FiberHome Technologies Group (China) , Huawei Technologies Co., Ltd. (China) , Microsemi Corporation (United States) , Ministry of Industry and Information Technology (MIIT) (China) , ZTE Corporation (China)   Q11/15   2017-06-05
[ 148 ]  
 
Proposal for G.977.1 study points     China Mobile Communications Corporation , China Unicom , Ministry of Industry and Information Technology (MIIT) (China)   Q8/15   2017-06-05
[ 125 ]  
 
Proposal on revision of G.650.1 for cut-off wavelength measurement     Ministry of Industry and Information Technology (MIIT) (China)   Q5/15   2017-06-05
[ 115 ]  
 
Discussion on types of the boxes and scope of the new Rec L.fdb     Ministry of Industry and Information Technology (MIIT) (China) , China Unicom , FiberHome   Q16/15   2017-06-05
[ 113 ]  
 
Suggestions on OTN simplification for 5G and DCI applications     China Telecommunications Corporation , Huawei Technologies Co., Ltd. (China) , Ministry of Industry and Information Technology (MIIT) (China)   Q11/15   2017-06-05
[ 112 ]  
 
Proposals to modify the structure of L.108/L.79     Ministry of Industry and Information Technology (MIIT) (China) , YOFC   Q16/15   2017-06-05
[ 111 ]  
 
Discussions and comments for draft new Rec. L.wdc     Ministry of Industry and Information Technology (MIIT) (China) , China Unicom , Huawei   Q17/15   2017-06-05
[ 110 ]  
 
Draft new Rec. L.fdb "Requirements for Passive Optical Nodes: Fibre Distribution Box" (initial draft)     Ministry of Industry and Information Technology (MIIT) (China) , China Unicom , Commscope , FiberHome   Q16/15   2017-06-05
[ 106 ]  
 
Proposal for ROADM related parameters in G.672     FiberHome Technologies Group (China) , Ministry of Industry and Information Technology (MIIT) (China) , ZTE Corporation (China)   Q7/15   2017-06-05
Resultados :28 documentos
 
Telecarga de múltiples documentos: Marcar las casillas correspondientes a los documentos seleccionados, a continuación pulsar "Telecargar"
   
 
Preferencias del usuario: 
Telecarga de múltiples documentos: Formatos e idiomas que hay que tener en cuenta (si están disponibles):
Páginas de navegación HTML  
Formatos  + Otros formatos
Idiomas (máximo 2)  + Multilingüe  
(E: inglés - F: francés - S: español - A: árabe - C: chino - R: ruso)

Pruebe ITU Translate, la herramienta de traducción automática de documentos
Comienzo de la página -  Comentarios -  Contáctenos -  Copyright © UIT 2008 Reservados todos los derechos
Contacto público :  TSB EDH
Actualizado el : 2024-9-18