Contribuciones
[ Origen: Orange (France) ] [ AI/Cuestión: Q13/15 ] |
|
Número
|
Título
|
Origen
|
AI/Cuestión
|
Fecha
|
|
[ 2829 ]
|
State diagram study ITU-T G.8275.1.
|
Orange (France)
|
Q13/15
|
2021-11-23 |
|
[ 2787 ]
(Rev.1) |
Reply to 3GPP Liaison/ Ref: 3GPP TSG SA2-2106786-LS02)
|
China Unicom
,
Huawei Technologies Co., Ltd. (China)
,
Orange (France)
|
Q13/15
|
2021-11-23 |
|
[ 2784 ]
|
G.8271: 900 ns for end-to-end 5G Systems
|
Orange (France)
,
Huawei Technologies Co., Ltd. (China)
|
Q13/15
|
2021-11-23 |
|
[ 2782 ]
|
G. 8275.1 T-BC ClockClass values corresponding to "holdover" during a "free-run".
|
Orange (France)
,
Huawei Technologies Co., Ltd. (China)
|
Q13/15
|
2021-11-23 |
|
[ 2670 ]
|
PRTC and ePRTC attributes Appendix [G.8275.1]
|
China Unicom
,
Huawei Technologies Co., Ltd. (China)
,
Ministry of Industry and Information Technology (MIIT) (China)
,
Orange (France)
|
Q13/15
|
2021-11-22 |
|
[ 2661 ]
|
Time network with multiple time transfer methods [G.8275]
|
China Unicom
,
Orange (France)
|
Q13/15
|
2021-11-22 |
|
[ 2536 ]
|
The role of "end application" in the context of 5G Industrial IIoT Systems
|
Orange (France)
|
Q13/15
|
2021-03-30 |
|
[ 2534 ]
|
Clock synchronisation service performance requirements for 5G Systems
|
Huawei Technologies Co., Ltd. (China)
,
Orange (France)
|
Q13/15
|
2021-03-30 |
|
[ 2532 ]
|
Performance requirements for G. 8273.2 when SyncE is lost and PTP continues: Further discussion
|
Orange (France)
|
Q13/15
|
2021-03-30 |
|
[ 2414 ]
|
New Phase/Time requirement
|
China Mobile Communications Corporation
,
China Unicom
,
Huawei Technologies Co., Ltd. (China)
,
Ministry of Industry and Information Technology (MIIT) (China)
,
Orange (France)
|
Q13/15
|
2021-03-29 |
|
[ 2209 ]
|
Use of non-GNSS phase-time reference in Telecommunications
|
Orange (France)
|
Q13/15
|
2020-08-25 |
|
[ 2208 ]
|
The role of "end application" in the context of 5G Industrial IIoT Systems
|
Orange (France)
|
Q13/15
|
2020-08-25 |
|
[ 2207 ]
|
Clock synchronisation service performance requirements for 5G Systems
|
Orange (France)
,
Huawei Technologies Co., Ltd. (China)
|
Q13/15
|
2020-08-25 |
|
[ 2206 ]
|
Further study on SyncE short term and long term transient responses in G.8273.2 Clause 7.4.1.3
|
Orange (France)
,
Huawei Technologies Co., Ltd. (China)
|
Q13/15
|
2020-08-25 |
|
[ 2205 ]
|
Study on Clockclass values outside those contained in Table 2 G.8275.1
|
Huawei Technologies Co., Ltd. (China)
,
Orange (France)
|
Q13/15
|
2020-08-25 |
|
[ 2097 ]
|
G.8275.1/G.8275.2: Time error monitor
|
Huawei Technologies Co., Ltd. (China)
,
China Mobile Communications Corporation
,
Ministry of Industry and Information Technology (MIIT) (China)
,
Orange (France)
|
Q13/15
|
2020-08-24 |
|
[ 2094 ]
|
G.8273.2: Relative Time Error
|
Huawei Technologies Co., Ltd. (China)
,
Orange (France)
|
Q13/15
|
2020-08-24 |
|
[ 2088 ]
|
G.8271.1: Clarification of Relative Time Error
|
Huawei Technologies Co., Ltd. (China)
,
Orange (France)
|
Q13/15
|
2020-08-24 |
|
[ 1941 ]
|
Use of Optical Clocks as reference for Synchronization in Telecommunications
|
Orange (France)
|
Q13/15
|
2020-01-14 |
|
[ 1940 ]
|
Synchronization requirements for Continuous-Variable Quantum Key Distribution (CV-QKD)
|
Orange (France)
|
Q13/15
|
2020-01-14 |
|
[ 1831 ]
|
Relative Time Error [G.8273.2]
|
Huawei Technologies Co., Ltd. (China)
,
Orange (France)
|
Q13/15
|
2020-01-14 |
|
[ 1818 ]
|
The monitor of time error between PTP and GNSS [G.Suppl.SyncOAM, G.8275.1]
|
China Mobile Communications Corporation
,
China Unicom
,
Huawei Technologies Co., Ltd. (China)
,
Orange (France)
|
Q13/15
|
2020-01-14 |
|
[ 1812 ]
|
Budget analysis of relative time error [G.8273.2]
|
Huawei Technologies Co., Ltd. (China)
,
Orange (France)
|
Q13/15
|
2020-01-14 |
|
[ 1811 ]
|
Hops consumption on OTN node
|
China Information Communication Technologies Group
,
China Unicom
,
Orange (France)
|
Q13/15
|
2020-01-14 |
|
[ 1809 ]
|
PRTC holdover performance with frequency support
|
China Information Communication Technologies Group
,
China Unicom
,
Huawei Technologies Co., Ltd. (China)
,
Orange (France)
|
Q13/15
|
2020-01-14 |
|
[ 1503 ]
|
Recommendation to use of UTC time scale in ITU-T Q13 documents.
|
Deutsche Telekom AG (Germany)
,
Orange (France)
|
Q13/15
|
2019-06-18 |
|
[ 1502 ]
|
Clarification on G.8273 Appendix III, Method 3.
|
Orange (France)
|
Q13/15
|
2019-06-18 |
|
[ 1501 ]
|
G.8271.1 Appendix XII.5: Relative Time error allocation
|
Orange (France)
|
Q13/15
|
2019-06-18 |
|
[ 1500 ]
|
G.8271.1 Appendix: Generalized HRMs for fronthaul cluster synchronization
|
Orange (France)
|
Q13/15
|
2019-06-18 |
|
[ 1253 ]
|
Proposal for the scope of G.8275.1, G.8273.2 and G.8275.2
|
Huawei Technologies Co., Ltd. (China)
,
Orange (France)
|
Q13/15
|
2019-06-17 |
|
[ 1250 ]
|
Proposal for G.8271.2
|
Huawei Technologies Co., Ltd. (China)
,
Orange (France)
|
Q13/15
|
2019-06-17 |
|
[ 1062 ]
|
Proposal for failure scenarios of fronthaul network [G.8271.1]
|
Huawei Technologies Co., Ltd. (China)
,
Ministry of Industry and Information Technology (MIIT) (China)
,
Orange (France)
|
Q13/15
|
2018-09-25 |
|
[ 1061 ]
|
Proposal for PTP function of PRTC-B and eRPTC
|
China Mobile Communications Corporation
,
Huawei Technologies Co., Ltd. (China)
,
Ministry of Industry and Information Technology (MIIT) (China)
,
Orange (France)
|
Q13/15
|
2018-09-25 |
|
[ 934 ]
|
G.8275 Fronthaul Architectures
|
Orange (France)
|
Q13/15
|
2018-09-24 |
|
[ 933 ]
|
G.8271 Synchronization requirements for Inter-operator TDD operation
|
Orange (France)
|
Q13/15
|
2018-09-24 |
|
[ 932 ]
|
G.8271: GNSS extended status message
|
Orange (France)
|
Q13/15
|
2018-09-24 |
|
[ 931 ]
|
Measurement of Relative Time Error (TER) : G.8271.1 Appendix XI
|
Orange (France)
|
Q13/15
|
2018-09-24 |
|
[ 930 ]
|
Text modification to G.8271.1 Appendix VII
|
Orange (France)
|
Q13/15
|
2018-09-24 |
|
[ 929 ]
|
Fronthaul Architectures and Network Budgeting, G.8271.1 Appendix
|
Orange (France)
|
Q13/15
|
2018-09-24 |
|
[ 928 ]
|
G.8272: Refinement of duplicated text in Appendix I (I.1) and Clause 6.1.
|
Orange (France)
|
Q13/15
|
2018-09-24 |
|
[ 927 ]
|
G.8271 Table II.2: 5G Phase and Time requirements update
|
Orange (France)
|
Q13/15
|
2018-09-24 |
|
[ 926 ]
(Rev.1) |
G.8271.1 Appendix: Phase and Time sync requirements for fronthaul transport
|
Orange (France)
|
Q13/15
|
2018-09-24 |
|
[ 925 ]
|
G.8271: Synchronization requirements for E-UTRA-NR Dual Connectivity
|
Orange (France)
,
Huawei Technologies Co., Ltd. (China)
|
Q13/15
|
2018-09-24 |
|
[ 810 ]
|
Defining relative time error [G.8260]
|
Calnex Solutions Limited (United Kingdom)
,
Nokia Corporation (Finland)
,
Orange (France)
|
Q13/15
|
2018-09-20 |
|
[ 749 ]
(Rev.1) |
T-BC Class C/D performance specification for G.8273.2
|
A1 Telekom Austria AG
,
China Mobile Communications Corporation
,
Deutsche Telekom AG (Germany)
,
Orange (France)
|
Q13/15
|
2018-09-02 |
|
[ 703 ]
(Rev.1) |
Title revision and new contents of G.8262.1
|
Huawei Technologies Co., Ltd. (China)
,
Ministry of Industry and Information Technology (MIIT) (China)
,
Orange (France)
|
Q13/15
|
2018-01-16 |
|
[ 688 ]
|
Enhanced clock rearrangement consideration
|
China Unicom
,
Huawei Technologies Co., Ltd. (China)
,
Ministry of Industry and Information Technology (MIIT) (China)
,
Orange (France)
|
Q13/15
|
2018-01-16 |
|
[ 684 ]
|
New fiber wander test result [G.8261]
|
China Unicom
,
Huawei Technologies Co., Ltd. (China)
,
Orange (France)
|
Q6/15, Q5/15, Q13/15
|
2018-01-16 |
|
[ 682 ]
|
Title revision and new contents of G.8262
|
Huawei Technologies Co., Ltd. (China)
,
Orange (France)
|
Q13/15
|
2018-01-16 |
|
[ 662 ]
|
Further discussions on the development towards nPRTC (network PRTC)
|
Orange (France)
|
Q13/15
|
2018-01-16 |
Resultados :71 documentos Resultados :
1 -
2
- Siguiente
|
Telecarga de múltiples documentos: Formatos e idiomas que hay que tener en cuenta (si están disponibles):