Union Internationale des Télécommunications   UIT
English  Español
 
Plan du site Contactez-nous Copie Imprimable
  Page d'accueil : UIT-R : WP9B : Contributions : 219 Ajoutés récemment -  Recherche de documents de réunion
   
[219]  Chairman's Report of the Working Party 9B meeting (Geneva, 7-14 April 2003)

Format

Taille

Mise à disposition

English

Word  

46592 octets 2003-05-01 [219] Annex 12- Liaison statements

Word  

398848 octets 2003-05-01 [219] Annex 11- Preliminary revision of the output from JRG 8A-9B on technical characteristics of broadband FWA systems conveying Internet Protocol (IP) packets or asynchronous transfer mode (ATM) cells

Word  

125952 octets 2003-04-30 [219] Annex 10- Working document toward preliminary draft new Recommendation ITU-R F.[9B/AOEP] - Analysis and optimization of the error performance of digital fixed wireless systems for the purpose of bringing into service and maintenance

Word  

246784 octets 2003-04-30 [219] Annex 9- Preliminary draft new Recommendation - Spectrum vision for the fixed service

Zip (Document)  

1334825 octets 2003-04-30 [219] Annex 8- Preliminary draft new Recommendation ITU-R [9B/F.IMT-2000 ISN] - Use of the fixed service in the deployment of IMT-2000 infrastructure networks

Word  

57344 octets 2003-04-30 [219] Annex 7- Preliminary draft revision of Recommendation ITU-R F.1568 - Radio-frequency block arrangements for fixed wireless access systems in the range 10.15-10.3/10.5-10.65 GHz

Zip (Document)  

588619 octets 2003-04-30 [219] Annex 6- Working document toward preliminary draft new Recommendation ITU-R F.[HAPS-RRS] - Interference evaluation from fixed service system using high altitude platform stations (HAPS) to radio-relay system in the bands above 3 GHz

Zip (Document)  

308224 octets 2003-04-30 [219] Annex 5- Preliminary draft revision of Recommendation ITU-R F.1609 - Interference evaluation from fixed service systems using high altitude platform stations to conventional fixed service systems in the bands 27.5-28.35 and 31.0-31.3 GHz

Word  

135168 octets 2003-04-29 [219] - Chairman's Report of the Working Party 9B meeting (Geneva, 7-14 April 2003) including Annex 1 - Structure of the work, Annex 2 - Questions assigned to WP 9B, Annex 3 - List of temp. docs., Annex 4 - Summary of draft Recs.
 

Document :

UIT-R WP9B  Contribution  219

Titre :

Chairman's Report of the Working Party 9B meeting (Geneva, 7-14 April 2003)

Reçu le :

2003-04-29

Source :

Chairman, WP 9B

Disponibilité :

Réservé aux utilisateurs TIES [UIT-R]

Début de page -  Commentaires -  Contactez-nous -  Droits d'auteur © UIT 2008 Tous droits réservés
Contact pour cette page :  Coordinateur du Web UIT-R
Mis à jour le : 2003-05-15