DATA CENTER EXPANSION

Details of the organization
Saudi Standards, Quality and Metrology Organization (SASO)
Saudi Arabia
Governments
  • The organization has a strategy for coordinating WSIS Implementation at the national level: Yes
  • The organization has a national e-strategy: Yes

Information about the project
DATA CENTER EXPANSION
DCE
The Saudi Standards, Quality and Metrology Organization (SASO) Data Center is a next generation green data center quickly design a cost-optimized HVAC control system with onboard energy-efficiency solutions. Improve machine performance with innovative automation technology and dedicated HVAC application functions, supplemented with advanced drive technology, to increase energy efficiency while reducing maintenance and improving reliability. Information and Communication Technology with ISO Standards. We have The Eco2 technology submerses servers, switches and routers in a revolutionary coolant. This reduces carbon emissions and energy consumption by 50%. The cost of deployment is also 70% less. A Centralized BMS (System) which provide every information about the equipment’s inside the Data Center to your Desk. The modern data centers consume much less power and occupy much less space. Their growth depends on the demand for services. They grow as the demand for services grows. Basically, they are born small and count on the energy consumption, carbon emissions and global warming. If compared with old data centers, these new modern data centers have four times higher processing capacity and occupy only 40% of the space. Another important and major trend in data centers is the inflexible chase of higher levels of security, especially, those that serve the fields of essential services and financial sectors. Large banks need to ensure that there is an absolute continuity of services and reduce the risk of disruption and blackouts to almost zero. Same applies to the telecommunications companies, especially after the arrival of the Internet.
Regional implementation
  • Asia and Pacific
Completed from 01/01/2016 to 31/12/2019
1. Schneider-electric 2. Saudi-Inteltec 3. APC 4. Saudi Electricity Company 5. DNJ Technology for IT 6. Saudi Emarati Electric Power Generators Co., 7. Leading Interactive Technology Co Ltd., 8. Mohammed Abdullah Ba-Abbad for Contracting Est.

WSIS information
* Information and communication infrastructure
  • Goal 9: Build resilient infrastructure, promote sustainable industrialization and foster innovation
  • Goal 11: Make cities inclusive, safe, resilient and sustainable
  • Project