Committed to connecting the world

Scheduled Rapporteur Meetings for SG 12 Questions (June 2010 – December 2010)

Notes:
Some meeting dates and venues were not finalized at the time of the Study Group 12 meeting, and they will be confirmed at a later stage. The meetings noted as "planned" were pre-approved by SG 12 and will be confirmed once sufficient number of participants and contributions is ensured.

Question Date Place Host Objectives Remarks
6/12 26-27 October 2010 Geneva,
ITU Headquarters
ITU
  • to work on a proposal for suitable speech material and analysis methods which can be used for objective testing and is to be integrated in P.501 and P.502.
Confirmed
7/12 5-8 July 2010 Lannion, France France Telecom Orange
  • review the test results of Optimisation/Characterisation of G.711.1 & G.722 SWB extension (mono).
  • review the test results of the Music experiment to evaluate the performance of proposed G.718 decoder-side post-processing for high frequency pitches,
  • progress the Handbook STP,
  • any other issues for which input contributions will be provided.
Confirmed
7/12 Week 6-10 December 2010 Lannion, France France Telecom Orange
  • review the test results of Optimisation/Characterisation of G.711.1 & G.722 SWB extension (stereo step1).
  • draft the test plan and review the processing plan of Characterisation phase 2 of G.711.1 & G.722 SWB extension (MS stereo)
  • progress the Handbook STP
Confirmed
9/12
(joint meeting with 14/12 & 17/12)
15-17 September 2010 Berlin, Germany DT
  • selection of detectors for P.TCA
  • technical requirement specification of P.AMD
  • discussion and agreement on draft Recommendation P.OLQA
Confirmed
13/12 tbd tbd tbd
  • G.OMVAS ToR and test plan
  • G.IPTV-PMPD
  • Other topics as necessary
Planned
14/12 (joint meeting with 9/12 & 17/12) 15-17 September 2010 Berlin, Germany DT
  • Review of P.NAMS participating parties
  • Finalize the P.NAMS Test Plan
  • Continue with P.NAMS selection critera
  • Finalize P.NBAMS Requirement Specification
  • Create the draft P.NBAMS Test Plan
  • Draft the P.NBAMS selection criteria
  • Send call for model submission for P.NBAMS
Confirmed
17/12
(joint meeting with 9/12 & 14/12)
15-17 September 2010 Berlin, Germany DT
  • As the highest priority, advancing the new Recommendation Y.156sam, on Ethernet Service Activation Test Methodology.
  • Advancing a revised version of Y.1540, including the new parameters now described in Appendices.
  • Contributions investigating how these new performance parameters can possibly advance the work of Q13 and Q14.
  • Advancing a revised version of Y.1541, including reviewing the provisional classes.
  • Advancement of the new Recommendation Y.154HN covering home network performance.
  • Other topics as necessary
Confirmed

All planned meetings will only take place if justified by a sufficient number of input documents.