International Telecommunication Union   ITU
Français  Espańol
 
Site map Contact Us Print version
  Home : ITU-R : WP6C Recently posted -  Search Meeting Documents
   
ITU-R WP6C Meeting Documents
  Max # of documents displayed/page:
Results: 43 total items.
Number  Date Source Title
  Number  Posted Size  
 
[ 307 ]  2023-11-01 ITU-T SG12   Liaison statement on revision of Recommendation ITU-T P.910: subjective video quality assessment methods for multimedia applications    
  [ 307 ]  - English -  Word 2023-11-01 [16:49]  665'399  bytes  
 
[ 306 ]  2023-10-31 Chair, JCA-ML   Liaison statement on invitation to provide inputs to the "Glossary of terms and definitions for Machine Learning"    
  [ 306 ]  - English -  Word 2023-10-31 [09:37]  104'705  bytes  
 
[ 305 ]  2023-10-31 Chair, JCA-ML   Liaison statement on invitation to provide inputs to the "Machine Learning standardization roadmap    
  [ 305 ]  - English -  Word 2023-10-31 [09:36]  152'805  bytes  
 
[ 304 ]  2023-10-19 ITU-T FG-MV   Liaison statement on request to provide the standardization status for metaverse-related technologies    
  [ 304 ]  - English -  Word 2023-10-19 [16:54]  424'646  bytes  
 
[ 303 ]  2023-10-19 ITU-T FG-MV   Liaison statement on results of the third meeting of the FG-MV    
  [ 303 ]  - English -  Word 2023-10-19 [16:33]  76'450  bytes  
 
[ 302 ]  2023-10-19 ITU-T FG-MV   Liaison statement on definition of metaverse    
  [ 302 ]  - English -  Word 2023-10-19 [16:27]  967'515  bytes  
 
[ 301 ]  2023-10-19 ITU-T FG-MV   Liaison statement on request to provide the standardization status for metaverse cross-platform interoperability    
  [ 301 ]  - English -  Word 2023-10-19 [16:27]  1'620'664  bytes  
 
[ 295 ]  2023-09-01 Chairman, WP 6C   Report of the meeting of Working Party 6C (Geneva, 28 August - 1 September 2023)    
  [ 295 ] Chapter 2 - Annex 2.2 - English -  Word 2023-10-10 [09:42]  45'852  bytes Preliminary draft revision of Recommendation ITU-R BT.1666 - User requirements for large screen digital imagery applications intended for presentation in a theatrical environment  
  [ 295 ]  - English -  Word 2023-09-20 [15:48]  118'900  bytes Report of the meeting of Working Party 6C (Geneva, 28 August - 1 September 2023)  
  [ 295 ] Chapter 2 - Annex 2.1 - English -  Word 2023-09-20 [09:59]  49'728  bytes reliminary draft revision of Recommendation ITU-R BT.1662 - General reference chain and management of post-processing headroom for programme essence in large screen digital imagery applications  
  [ 295 ] Chapter 4 - Annex 4.4 - English -  Word 2023-09-11 [09:39]  42'814  bytes Establishment of a Rapporteur Group on advanced media systems in broadcasting (RG-AMS)  
  [ 295 ] Chapter 4 - Annex 4.3 - English -  Word 2023-09-11 [09:37]  40'285  bytes Reply liaison statement to the Chairman of ITU-T JCA-ML - Working Party 6C representative in ITU-T JCA-ML  
  [ 295 ] Chapter 5 - Annex 5.1 - English -  Word 2023-09-08 [10:07]  10'403'072  bytes Working document towards a preliminary draft new Report ITU-R BT.[ERTIP] - Display energy reduction through image signal processing  
  [ 295 ] Chapter 5 - Annex 5.6 - English -  Word 2023-09-08 [09:37]  40'085  bytes Continuation of the Rapporteur Group - Energy Aware Broadcasting (RG-EAB)  
  [ 295 ] Chapter 5 - Annex 5.3 - English -  Word 2023-09-08 [09:31]  34'598  bytes Liaison statement to Focus Group on Metaverse (copy to Working Party 6B) Liaison statement to Focus Group on Metaverse (copy to Working Party 6B) Liaison statement to Focus Group on Metaverse (copy to Working Party 6B) - Results of the second meeting of the FG-MV and approval of its first deliverable  
  [ 295 ] Chapter 5 - Annex 5.5 - English -  Word 2023-09-08 [09:29]  58'913  bytes Reply liaison to ITU-T Study Group 5 - Practical examples of actions to realize energy aware broadcasting  
  [ 295 ] Chapter 5 - Annex 5.4 - English -  Word 2023-09-08 [09:28]  38'209  bytes Reply liaison statement to ITU-T Study Group 9 - Draft new ITU-T Technical Report JSTR.LCAP "Technical advances, challenges, and best practices in live captioning"  
  [ 295 ] Chapter 5 - Annex 5.2 - English -  Word 2023-09-08 [08:34]  91'627  bytes Working document towards a preliminary draft new Recommendation ITU-R BT.[CARE] - A framework for content-adaptive methods for reduction of energy consumption in television displays  
  [ 295 ] Chapter 4 - Annex 4.2 - English -  Word 2023-09-07 [08:34]  38'241  bytes Liaison statement to ITU-T Study Group 16 - F.IPTV-VRSREQS "Requirements of enabling VR service based on IPTV Architecture" (new): output draft (Geneva, 10-21 July 2023)  
  [ 295 ] Chapter 4 - Annex 4.1 - English -  Word 2023-09-07 [08:30]  42'770  bytes Proposed draft reply liaison statement to ITU-T JCA-ML - Invitation to provide inputs to the "machine learning standardization roadmap" and "glossary of terms and definitions for machine learning"  
  [ 295 ] Chapter 3 - Annex 3.6 - English -  Word 2023-09-07 [08:25]  39'794  bytes Continuation of Rapporteur Group (RG-24) on HDR-TV  
  [ 295 ] Chapter 3 - Annex 3.5 - English -  Word 2023-09-06 [16:58]  37'844  bytes Draft liaison statement to SMPTE - Nomenclature of controls and metadata in Look-up Table (LUT) conversions  
  [ 295 ] Chapter 3 - Annex 3.4 - English -  Word 2023-09-06 [16:09]  3'115'749  bytes Working document towards a preliminary draft revision of Report ITU-R BT.2408 - Guidance for operational practices in HDR television production  
  [ 295 ] Chapter 1 - Annex 1.5 - English -  Word 2023-09-05 [16:17]  35'161  bytes Liaison statement to Working Party 6B - Updated work plan for advanced sound systems  
  [ 295 ] Chapter 1 - Annex 1.6 - English -  Word 2023-09-05 [16:14]  35'008  bytes Continuation of a Rapporteur Group on the audio (RG-Audio) with modified name and Terms of Reference  
  [ 295 ] Chapter 3 - Annex 3.3 - English -  Word 2023-09-05 [14:59]  1'259'526  bytes Working document towards a preliminary draft new Recommendation ITU-R BT.[MON] - [Reference] viewing conditions for HDR and SDR monitoring in close proximity within a single-master broadcast production environment  
  [ 295 ] Chapter 1 - Annex 1.1 - English -  Word 2023-09-05 [08:45]  46'382  bytes Working document towards a preliminary draft revision of Question ITU-R 135-2/6 - System parameters for and management of digital sound ystems with and without accompanying picture  
  [ 295 ] Chapter 3 - Annex 3.2 - English -  Word 2023-09-05 [08:19]  149'867  bytes Working document towards a preliminary draft new Recommendation ITU-R BT.[REQ-MIL] - Requirements and applications for Image Level meters  
  [ 295 ] Chapter 3 - Annex 3.1 - English -  Word 2023-09-04 [17:15]  44'949  bytes Working document towards a preliminary draft revision of Recommendation ITU-R BT.2100-2 - Image parameter values for high dynamic range television for use in production and international programme exchange  
  [ 295 ] Chapter 1 - Annex 1.2 - English -  Word 2023-09-04 [17:12]  6'239'852  bytes Working document towards a preliminary draft new Report ITU-R BS.[AdvSSWorkflow] - Use-cases of production workflows of advanced sound contents  
  [ 295 ] Chapter 1 - Annex 1.4 - English -  Word 2023-09-04 [16:51]  298'034  bytes Working documents towards preliminary draft revision of Recommendations ITU-R BS.1283-2 and ITU-R BS.1679-1 - Considering subjective assessment of sound quality in a theatrical environment  
  [ 295 ] Chapter 1 - Annex 1.3 - English -  Word 2023-09-04 [16:00]  421'612  bytes Updated work plans for advanced sound system - 2020-2023 and 2024-2027  
 
[ 300 ]  2023-09-12 WP 6B   Liaison statement to Working Party 6C - Status of work in WP 6B and updated work plan for advanced sound systems    
  [ 300 ] Part 1 - English -  Word 2023-09-12 [11:24]  667'439  bytes  
  [ 300 ]  - English -  Word 2023-09-12 [11:24]  331'940  bytes  
 
[ 299 ]  2023-09-12 WP 6B   Reply liaison statement to IEC TC100 TA6 (Copy to Working Party 6C) - Preliminary work item on Professional file-based camera recorder and software    
  [ 299 ]  - English -  Word 2023-09-12 [11:19]  40'695  bytes  
 
[ ADM 63 ]  2023-09-06 SG 6, WPs 6A, 6B & 6C   Provisional schedule of 2024 meetings of Study Group 6 and its Working Parties    
  [ ADM 63 ] Revision 1 - English -  Word 2023-09-07 [08:15]  37'240  bytes  
 
[ 298 ]  2023-09-04 Co-Chairs, IRG-AVA   Reply Liaison statement on CTA-2115, Accessibility Preferences Data Model    
  [ 298 ] Part 1 - English -  Word 2023-09-04 [13:48]  7'037'472  bytes  
  [ 298 ]  - English -  Word 2023-09-04 [13:48]  6'957'233  bytes  
 
[ 297 ]  2023-09-04 Co-Chairs, IRG-AVA   Liaison statement on requesting review of DAPT    
  [ 297 ]  - English -  Word 2023-09-04 [11:01]  42'039  bytes  
 
[ 296 ]  2023-09-04 Co-Chairs, IRG-AVA   Liaison statement reply on draft new ITU-T technical Report JSTR.LCAP and draft Recommendation ITU-T J.ACC-US-PROF    
  [ 296 ] Part 1 - English -  Word 2023-09-04 [11:27]  7'036'543  bytes  
  [ 296 ]  - English -  Word 2023-09-04 [11:26]  6'957'995  bytes  
 
[ 294 ]  2023-09-01 Director BR   Final list of participants WP 6C, Geneva 28 August - 1 September 2023    
  [ 294 ]  - English -  PDF (acrobat) 2023-09-13 [16:35]  132'867  bytes  
 
[ ADM 62 ]  2023-09-01 Chairman, WP 6C   Draft agenda for the final Plenary meeting of Working Party 6C - Friday, 1 September 2023 - 1430h to 1545h and 1615h to 1730h Geneva time (Tower Popov 1)    
  [ ADM 62 ]  - English -  Word 2023-09-01 [12:33]  38'608  bytes  
Results: 43 total items.
 
Multiple Document Download: Check the boxes of the selected documents, then click "Zip and download"
   
 
User preferences: 
Multiple Document Download: Formats and Languages to be included (when available):
HTML Navigation Pages Yes  
Formats doc pdf zip  + Other formats
Languages (maximum 2) E F S A C R  + Multilingual 
(E: English - F: French - S: Spanish - A: Arabic - C: Chinese - R: Russian)

Top -  Feedback -  Contact Us -  Copyright © ITU 2008 All Rights Reserved
Contact for this page :  ITU-R Web coordinator
Updated : 2023-11-01