Committed to connecting the world

WTISD

ITU-T Study Group 11 - Signalling requirements, protocols and test specifications

Executive summary of the WP1/11 and WP2/11 meeting (Geneva, 21 June 2013)
WP1/11 and WP2/11 meetings were held in Geneva on 21 June 2013 and were attended by 34 delegates from 5 countries. Along with face-to-face meetings, five sessions from various Questions or joint Questions meetings were supported by remote participation capabilities.
 
1.           Consented Recommendations (ITU-T A.8)
The following table shows the ‘Consented’ draft Recommendations.
 
#
Question
Recommendation
Status
Title
Final TD GEN
A.5 justification
1
4/11
ITU-T Q.3303.3 v3
Revised
Resource control protocol no. 3 version 3 - Protocol at the interface between a Policy Decision Physical Entity (PD-PE) and a Policy Enforcement Physical Entity (PE-PE): Diameter Profile version 3
2
4/11
ITU-T Q.3301.1 v3
Revised
Resource control protocol No. 1, version 3 – Protocol at the Rs interface between service control entities and the policy decision physical entity
 
2.          Supplements, Handbooks and Technical Papers
2.1        Supplement
One supplement was approved by WP1/11.
 
#
Question
Supplement N.
Status
Title
Final TD GEN
1
3/11
63
New
Supplement 63 to Q-series Recommendations “Signalling Protocol Mappings in Support of Emergency Telecommunications Service in IP Networks”
 
2.2        Handbooks
No Handbooks were approved at this meeting.
2.3        Technical Papers
No Technical papers were approved at this meeting.
 
3.          Liaison officers and Rapporteurs
 
4.          Outgoing Liaison Statements
The following table shows the list of the twenty agreed outgoing liaison statements. See TD 27 (GEN/11).
 
#
WP/11
Question
For
To:
Title
Reference
1
2/11
Q4/11
information
SG15 Question 2
Liaison informing about contributions of ITU-T Recommendation “Scenarios and signalling requirements for software-defined BAN (SBAN)”
 
5.          Work plan for interim Working Party and Rapporteur meetings
The next interim WP1/11 and WP2/11 meeting is scheduled to take place in collocation with WP3/11 meeting and SG13 meeting in Kampala, Uganda, on 7‑13 November 2013. The next WP4/11 meeting is scheduled to take place in Geneva on 14-20 November 2013.
The interim meetings plan, as agreed at WP1/11 and WP2/11 meeting (Geneva, 21 June 2013), is to be found below.
 
5.1        Working parties 1/11 and 2/11
 
 WP
Date
Place / Host
Terms of reference
Contact
WP1/11
7‑13 November 2013
Kampala, Uganda
-      To consider CONSENT (AAP) of the following candidates
-      (Q.OIP/OIR) Originating Identification Presentation (OIP) and Originating Identification Restriction(OIR)  protocol specification as NGN Supplementary Service
-      (Q.TS-IVR-PROT) Protocol Profiles for touch screen terminal -based IVR services
-      To consider approval of new and modified supplements:
-      TRQ.ETS-Overview Revision 2
-      Supplement 49, ETS/IEPS update to signalling requirements to support IP telephony
-      Discuss the progress of work on the draft Recommendations under study in Qs 1,2,3/11 
 
Xiaojie Zhu
zhuxj@gsta.com
WP2/11
7‑13 November 2013
Kampala, Uganda
-     To consider CONSENT (AAP) of the following candidates
-      Q.3303.2 v2
-      Q.IPv6ProBB
-      Q.IPv6ProMM
-     To discuss the progress of work on the draft Recommendations under study in Qs 4, 5, 6/11.
 
5.2        Rapporteur groups
 
Question
Date
Place / Host
Terms of reference
Contact
1/11
7‑13 November 2013
Kampala, Uganda
-       To progress draft Q.DSNSA
-     To consider any new work item(s)
 
Xiaojie Zhu
zhuxj@gsta.com
2/11
7‑13 November 2013
Kampala, Uganda
-    Progress all Work Items under study of Q2/11

3/11​

7‑13 November 2013
Kampala, Uganda
-        To progress draft TRQ.ETS-Overview Revision 2
-        To progress updates to Supplement 49, ETS/IEPS update to signalling requirements to support IP telephony  consider any new work item(s)

​4/11

7‑13 November 2013 Kampala, Uganda -        To finalize the following draft recommendation
-   Q.3303.2 v2
-        To discuss the progress of work on the draft Recommendations under study in Q 4/11
-        To discuss the contributions which are addressed to Q4/11
Matt Lopez
matt@technicalcure.com​​

​5/11

7‑13 November 2013 Kampala, Uganda -         To discuss the progress of work on the draft      Recommendations Q.SBNG
-        To discuss the contributions which are addressed to Q5/11
Junfeng Ma
majunfeng@catr.cn

​6/11

7‑13 November 2013 Kampala, Uganda -        To finalize the following draft recommendations
-      Q.IPv6ProBB
-      Q.IPv6ProMM
-        To discuss the progress of work on the draft Recommendations under study in Q 6/11
-        To discuss the contributions which are addressed to Q 6/11
 
5.3        Draft Meeting plan of WP1/11, 2/11 and 3/11 meetings (Kampala, Uganda, 7-13 November 2013)
 
​ ​ Thursday​ ​ Friday​ ​ ​ ​ ​WE
Saturday 9
Sunday 10
Monday 11​ ​ ​ ​ Tuesday 12​ ​ ​ ​ Wednesday 13​ ​ ​ ​
Sesssions​ ​1 ​2 ​3 ​4 ​1 ​2 ​3 ​4 ​1 ​2 ​3 ​4 ​1 ​2 ​3 ​4 ​1 ​2 ​3 ​4
WPs 1/11, 2/11 and 3/11​ 1 ​2 ​2
Q1/11 ​X ​X X​ X​ ​X
​Q2/11 ​X
​Q3/11 ​X ​X
​Q4/11 ​X X​ ​X X​ ​X X​ X​ ​3 X​
​Q5/11 ​X ​X X​ ​X
​Q6/11 ​X ​3 ​X
​Q7/11 ​X ​X X​ X​
​Q8/11 ​X ​X X​ ​X
​Q9/11 ​X ​X X​
 
 
Session 1: 0930 – 1100;                    Session 2: 1130-1300;                       Session 3: 1430-1600;                       Session 4: 1630-1800;
 
WPs
Working Parties.
X
Represents a meeting session.
1
WP 1/11, 2/11 and 3/11 Opening Plenaries are held sequentially
2
WP 1/11, 2/11 and 3/11 Closing Plenaries are held sequentially
3
Q4/11, Q6/11 and Q14/13 joint meeting
 
6.          Next Study Group 11 meeting
The next SG 11 meeting is scheduled in Geneva on 14-18 July 2014
 

Past executive summaries of SG11 meetings