|
Format |
Size |
Posted |
|
|
|
English |
Word
|
142336 bytes |
2003-05-26 |
[135] Annex 30
- Draft modification to Recommendation ITU-R S.1522 - Impact of loss of synchronization and recovery time on availability in hypothetical reference digital paths |
|
Word
|
48128 bytes |
2003-05-13 |
[135] Annex 29
- Final list of participants - Working Party 4B (Geneva, 21-27 March 2003) |
|
Word
|
54272 bytes |
2003-05-13 |
[135] Annex 28
- Liaison statement to ITU-T Study Group 17 (Q.10) - Information security management system for telecommunications |
|
Word
|
52224 bytes |
2003-05-13 |
[135] Annex 27
- Liaison statement to ICG-SAT - Requirements for edge-to-edge emulation of TDM circuits over packet switching networks |
|
Word
|
58368 bytes |
2003-05-13 |
[135] Annex 26
- Requirements for edge-to-Edge emulation of TDM circuits over packet switching networks |
|
Word
|
143872 bytes |
2003-05-13 |
[135] Annex 25
- Preliminary draft revision of Recommendation ITU-R S.579-5 - Availability objectives for hypothetical reference circuits and hypothetical reference digital paths in the fixed-satellite service operating below 15 GHz |
|
Zip (Document)
|
673244 bytes |
2003-05-13 |
[135] Annex 24
- Application of draft new Recommendation ITU-R P.[FADE] (Doc. 3/BL/49) to the prediction of availability on satellite digital paths operating above 10 GHz |
|
Word
|
53760 bytes |
2003-05-13 |
[135] Annex 23
- Liaison statement to ITU-T Study Group 15 Working Party 2 - Revision of Recommendation ITU-R S.1522 |
|
Word
|
390144 bytes |
2003-05-13 |
[135] Annex 22
- Preliminary draft new Recommendation ITU-R S.[TT&C] - Performance and availability objectives for FSS telemetry, tracking and command systems |
|
Word
|
53760 bytes |
2003-05-13 |
[135] Annex 21
- Draft new Question ITU-R - Satellite News Gathering (SNG) carriers interference by unintentional access |
|
Zip (Document)
|
448668 bytes |
2003-05-13 |
[135] Annex 20
- Preliminary draft revision of Recommendation ITU-R S.1149 - Recommendation ITU-R S.1149-2 - Network architecture and equipment functional aspects of digital satellite systems in the fixed-satellite service forming part of synchronous digital hierarchy tra |
|
Word
|
53760 bytes |
2003-05-13 |
[135] Annex 19
- Liaison statement to ITU-R Study Group 3 - Optical transport of satellite signals from Earth-to-space |
|
Word
|
641024 bytes |
2003-05-13 |
[135] Annex 18
- Preliminary draft new Recommendation ITU-R S.[OTNBACKUP] - Allowable error performance for FSS restoration of Paths in the Optical Transport Network (OTN) (Question ITU-R 75/4) |
|
Word
|
685568 bytes |
2003-05-13 |
[135] Annex 17
- Preliminary draft revision of Recommendation ITU-R S.1521 - Allowable error performance for a satellite hypothetical reference digital path based on the synchronous digital hierarchy SDH transport technology (Question ITU-R 75/4) |
|
Word
|
508416 bytes |
2003-05-13 |
[135] Annex 16
- Preliminary draft revision of Recommendation ITU-R S.1062-2 - Allowable error performance for a satellite hypothetical reference digital path operating below 15 GHz (Question ITU-R 75/4) |
|
Word
|
67584 bytes |
2003-05-13 |
[135] Annex 15
- Draft modification of Recommendation ITU-R S.614 - Allowable error performance for a satellite hypothetical reference digital path in the fixed-satellite service operating below 15 GHz when forming part of an international connection in an integrated serv |
|
Word
|
55296 bytes |
2003-05-13 |
[135] Annex 14
- Liaison statement to ITU-T SG 13 WP 1 - Information of interests to Section 6 of the IP Project description document |
|
Word
|
50688 bytes |
2003-05-13 |
[135] Annex 13
- Liaison statement to ITU-T SG 13 - New NGN 2004 Project |
|
Word
|
54784 bytes |
2003-05-13 |
[135] Annex 12
- Liaison statement to ITU-R WP 6M - Systems to protect personal privacy in interactive broadcasting systems |
|
Word
|
112128 bytes |
2003-05-13 |
[135] Annex 11
- MPLS traffic engineering for broadband satellite networks |
|
Zip (Document)
|
876865 bytes |
2003-05-13 |
[135] Annex 10
- Preliminary draft new Recommendation - Methods to enhance TCP/IP performance over satellite links (Question ITU-R 263/4) |
|
Word
|
56832 bytes |
2003-05-13 |
[135] Annex 9
- Liaison statement to ITU-T SG 13 WP 4 Q6 - PDNR - Methods to enhance TCP/IP performance over satellite links and the development of new ITU-T Recommendations Y.MPLSperf and Y.TCPperf |
|
Word
|
377344 bytes |
2003-05-13 |
[135] Annex 8
- Working document towards a preliminary draft new Recommendation on TCP/IP performance over satellite network |
|
Zip (Document)
|
1207232 bytes |
2003-05-13 |
[135] Annex 7
- TCP performance in broadband networks including GEO satellite ATM networks |
|
Word
|
964096 bytes |
2003-05-13 |
[135] Annex 6
- Experiment results and analysis of FTP and HTTP transmission over satellite ATM networks |
|
Word
|
53760 bytes |
2003-05-13 |
[135] Annex 5
- Liaison statement to ITU-T Study Group 13 WP 4 Q6 |
|
Word
|
273920 bytes |
2003-05-13 |
[135] Annex 4
- Draft workplan for development of a new Recommendation on IP over satellite (Question ITU-R 263/4)(Rev.1) |
|
Word
|
53760 bytes |
2003-05-26 |
[135] Annex 3
- Liaison statement to ITU-D Study Group 1 - Satellite regulation in developing countries |
|
Word
|
53760 bytes |
2003-05-13 |
[135] Annex 2
- Work plan for the sixteenth meeting of Working Party 4B (Geneva, 21-27 March 2003) |
|
Word
|
48128 bytes |
2003-05-13 |
[135] Annex 1
- List of documents issued |
|
Word
|
166912 bytes |
2003-05-23 |
[135]
- Report of the sixteenth meeting of Working Party 4B |
|
|