|
Format |
Taille |
Mise à disposition |
|
|
|
English |
Word
|
144384 octets |
2007-06-11 |
[249] Annex 09- List of input documents |
|
Word
|
116224 octets |
2007-06-11 |
[249] Annex 08- Working document towards a PDNR ITU-R F.[Sharing] - Guidance for reaching agreement between administrations on sharing between fixed service systems and systems of other terrestrial radiocommunication services operating in the neighbouring countries |
|
Word
|
114176 octets |
2007-06-11 |
[249] Annex 07- Draft new Question ITU-R F.[Sharing/9] - Guidance for reaching agreement between administrations on sharing between fixed service systems and systems of other terrestrial radiocommunication services operating in the neighbouring countries |
|
Word
|
209920 octets |
2007-06-11 |
[249] Annex 06- Working document towards preliminary modifications to Recommendation ITU-R F.1336-2 - Reference radiation patterns of omnidirectional, sectoral and other antennas in point-to-multipoint systems for use in sharing studies in the frequency range ... |
|
Word
|
129536 octets |
2007-06-11 |
[249] Annex 05- Preliminary draft new Recommendation - Technical and operational characteristics of systems in the fixed service to facilitate sharing with the Earth exploration-satellite (passive) and space research (passive) services in the bands 10.6-10.68 GHz and ... |
|
Word
|
699392 octets |
2007-06-11 |
[249] Annex 04- Working document towards a preliminary draft revision to Recommendation ITU-R F.758-4 - Considerations in the development of criteria for sharing or compatibility between digital fixed wireless systems in the fixed service and systems in other services... |
|
Word
|
119808 octets |
2007-06-11 |
[249] Annex 03- List of Questions assigned to Working Party 9D |
|
Word
|
115712 octets |
2007-06-11 |
[249] Annex 02- List of output (TEMP) documents |
|
Word
|
121344 octets |
2007-06-11 |
[249] Annex 01- Attribution of documents and draft work plan |
|
Word
|
179200 octets |
2007-06-11 |
[249] - Report on the meeting of Working Party 9D (Geneva, 8-16 May 2007) |
|
|