International Telecommunication Union   ITU
Français  Español
 
Site map Contact Us Print version
  Home : ITU-R : WP3L : Contributions : 26 Recently posted -  Search Meeting Documents
   
[26]  Report of the meeting of Working Party 3L, Boulder, USA 5-9 June 2008

Format

Size

Posted

English

Word  

142848 bytes 2008-07-15 [26] Annex 10 - List of output documents

Word  

4292608 bytes 2020-12-17 [26] Annex 09 - Revision to Recommendation ITU-R P.684-4 - LF field strength prediction in longer propagation distances than 4 000 km

Word  

99840 bytes 2008-06-25 [26] Annex 08 - MF skywave fading

Word  

99840 bytes 2008-06-25 [26] Annex 07 - HF transmission analysis

Word  

145408 bytes 2008-06-25 [26] Annex 06 - Draft revision of Recommendation ITU-R P.533-9 - Method for the prediction of the performance of HF circuits

Word  

106496 bytes 2008-06-25 [26] Annex 05 - Proposal for a new Report on MF and LF ground-wave propagation

Word  

98816 bytes 2008-06-25 [26] Annex 04 - The characterisation of local variability of MF ground wave propagation

Word  

98816 bytes 2008-06-25 [26] Annex 03 - The effect of MF ground wave height irregularities

Word  

98816 bytes 2008-06-25 [26] Annex 02 - Measurement and evaluation methods for radio noise in the HF frequency band

Word  

102912 bytes 2008-06-25 [26] Annex 01 - Consideration of the appropriate bandwidth for measurements of radio noise

Word  

220160 bytes 2008-07-16 [26]  - Report of the meeting
 

Document :

ITU-R WP3L  Contribution  26

Title :

Report of the meeting of Working Party 3L, Boulder, USA 5-9 June 2008

Date :

2008-06-25

Source :

Chairman, WP 3L

Access :

Restricted to TIES users [ITU-R]

Top -  Feedback -  Contact Us -  Copyright © ITU 2008 All Rights Reserved
Contact for this page :  ITU-R Web coordinator
Updated : 2020-12-17