| 
Number  | 
Date
 | 
Source
 | 
Title
 | 
Questions 
		     	
 | 
|   | 
Number  | 
Posted  | 
Size 
 | 
  | 
  | 
|   | 
| 
[ 275 ] 
	         | 
2011-11-18 | 
WP 5C
   		  | 
Liaison statement to Working Parties 4C, 5D and 7C - Status of studies on the harmonization/rationalization of frequency bands/tuning ranges for cross-border deployment of electronic news gathering (ENG) systems
		 
		  | 
N/A
   		  | 
 
	     
       	     | 
[ 275 ]  - English -  Word | 
2011-11-18 [17:32] 
 | 
60'044  bytes  | 
		  | 
|   | 
| 
[ 274 ] 
	         | 
2011-11-17 | 
WP 5C
   		  | 
Liaison statement to Working Parties 7C and 7D - Coexistence between fixed service operating in 71-76 GHz, 81-86 GHz and 92-94 GHz bands and -passive services
		 
		  | 
N/A
   		  | 
 
	     
       	     | 
[ 274 ]  - English -  Word | 
2011-11-18 [13:29] 
 | 
44'023  bytes  | 
		  | 
|   | 
| 
[ 272 ] 
	         | 
2011-11-16 | 
WP 5C
   		  | 
Liaison statement to Working Parties 1A, 1B, 3M, 4A, 4C, 5A, 5B, 5D, 6A, 7B, 7C and 7D - Draft revision of Recommendation ITU-R F.758-4
		 
		  | 
N/A
   		  | 
 
	     
       	     | 
[ 272 ]  - English -  Word | 
2011-11-16 [16:11] 
 | 
59'782  bytes  | 
		  | 
|   | 
| 
[ 273 ] 
	         | 
2011-11-16 | 
WP 5C
   		  | 
Liaison statement to Working Parties 3M, 4A, 5A, 5B, 7B and 7C - Studies in support of WRC-12 Agenda item 1.20
		 
		  | 
N/A
   		  | 
 
	     
       	     | 
[ 273 ]  - English -  Word | 
2011-11-16 [16:16] 
 | 
57'811  bytes  | 
		  | 
|   | 
| 
[ 271 ] 
	         | 
2011-11-16 | 
WP 5C
   		  | 
Liaison statement to Working Parties 5B, 7C and 7D - Draft revision of Report ITU-R F.2107-1 - Characteristics and applications of fixed wireless systems operating in frequency ranges between 57 GHz and 134 GHz
		 
		  | 
N/A
   		  | 
 
	     
       	     | 
[ 271 ]  - English -  Word | 
2011-11-16 [15:39] 
 | 
57'963  bytes  | 
		  | 
|   | 
| 
[ 270 ] 
	         | 
2011-11-03 | 
BR Study Group Department
   		  | 
ITU-R Study Group 1 Recommendation to be brought to the attention of Study Groups 4, 5, 6 and 7
		 
		  | 
N/A
   		  | 
 
	     
       	     | 
[ 270 ]  - English -  Word | 
2011-11-03 [15:10] 
 | 
55'481  bytes  | 
		  | 
|   | 
| 
[ 269 ] 
	         | 
2011-10-31 | 
SG 3
   		  | 
Liaison statement to Working Parties 1A, 4A, 4C, 5A, 5B, 5C, 5D, 6A, 7B, 7C and 7D - Handbook on "Propagation information for the prediction of interference and coordination distance"
		 
		  | 
N/A
   		  | 
 
	     
       	     | 
[ 269 ]  - English -  Word | 
2011-10-31 [13:41] 
 | 
181'954  bytes  | 
		  | 
|   | 
| 
[ 268 ] 
	         | 
2011-10-03 | 
Chairman, WP 7C
   		  | 
Report of the meeting of Working Party 7C - (Geneva, 26-30 September 2011)
		 
		  | 
N/A
   		  | 
 
	     
       	     | 
[ 268 ]  - English -  Word  | 
2011-11-07 [13:50] 
 | 
155'648  bytes  | 
Report to Working Party 7C on its meeting (september 2011) 
with a view to its next meeting (SEPTEMBER 2012)
Report to Working Party 7C on its meeting (september 2011) 
with a view to its next meeting (SEPTEMBER 2012)
Report to Working Party 7C on its
		  | 
 
	     
       	     | 
[ 268 ] Annex 03 - English -  Word  | 
2011-10-28 [09:31] 
 | 
1'836'544  bytes  | 
Preliminary draft revision of Recommendation ITU-R RS.1347 - Feasibility of sharing between radionavigation-satellite receivers and the Earth exploration-satellite (active) and space research (active) services in the 1 215-1 300 MHz band
		  | 
 
	     
       	     | 
[ 268 ] Annex 11 - English -  Word | 
2011-10-21 [11:33] 
 | 
82'701  bytes  | 
List of ITU-R RS Series Recommendations currently in force
		  | 
 
	     
       	     | 
[ 268 ] Annex 10 - English -  Word | 
2011-10-21 [11:12] 
 | 
66'127  bytes  | 
List of output (TEMP) documents (Documents 7C/TEMP/113-7C/TEMP/128)
		  | 
 
	     
       	     | 
[ 268 ] Annex 01 - English -  Word | 
2011-10-21 [11:05] 
 | 
57'836  bytes  | 
List of input documents (Documents 7C/215-7C/266)
		  | 
 
	     
       	     | 
[ 268 ] Annex 02 - English -  Word | 
2011-10-21 [10:03] 
 | 
54'065  bytes  | 
Final list of participants
		  | 
 
	     
       	     | 
[ 268 ] Annex 08 - English -  Word | 
2011-10-20 [14:58] 
 | 
330'561  bytes  | 
Working document towards a preliminary draft new Report - Potential interference between the Earth exploration satellite (active) and space research (active) in the 1 215-1 300 MHz and the air-route surveillance radars in the 1 215-1 400 MHz band
		  | 
 
	     
       	     | 
[ 268 ] Annex 09 - English -  Word | 
2011-10-20 [14:41] 
 | 
59'226  bytes  | 
Proposals for ITU-R Study Group 7 Chairman's Report to Radiocommunication Assembly 2012
		  | 
 
	     
       	     | 
[ 268 ] Annex 07 - English -  Word | 
2011-10-20 [14:22] 
 | 
1'829'399  bytes  | 
Working document towards a preliminary draft new Report ITU-R RS.[MITIG_RNSS-EESS] - Compatibility measurements and possible mitigation measures between EESS (active) systems and RNSS systems in the band 1 215-1 300 MHz
		  | 
 
	     
       	     | 
[ 268 ] Annex 06 - English -  Word | 
2011-10-20 [12:43] 
 | 
2'277'582  bytes  | 
Working document towards a preliminary draft new Recommendation - Preliminary analysis of the impact of unwanted emissions of SAR operating at 9 GHz into SRS deep-space stations operating in the band 8.4-8.5 GHz and radio astronomy stations operating in t
		  | 
 
	     
       	     | 
[ 268 ] Annex 05 - English -  Word | 
2011-10-20 [11:52] 
 | 
432'738  bytes  | 
Working document towards a preliminary draft new Recommendation ITU-R RS.[EESS RADAR SOUNDER] - Typical technical and operating characteristics and preferred frequency bands of spaceborne radar sounder systems in EESS (active)
		  | 
 
	     
       	     | 
[ 268 ] Annex 04 - English -  Word | 
2011-10-19 [15:32] 
 | 
66'975  bytes  | 
Working document towards a preliminary draft new Recommendation on typical technical and operating characteristics and preferred frequency bands of space research service (passive) observation systems
		  | 
|   | 
| 
[ 267 ] 
	         | 
2011-09-30 | 
Director, BR
   		  | 
Final List of Participants - Working Party 7C (Geneva, 26-30 September 2011)
		 
		  | 
N/A
   		  | 
 
	     
       	     | 
[ 267 ]  - English -  PDF (acrobat)  | 
2011-09-30 [15:16] 
 | 
53'007  bytes  | 
		  | 
|   | 
| 
[ 266 ] 
	         | 
2011-09-29 | 
WP 4A
   		  | 
Liaison statement to Study Group 1 (copy to Study Groups 5, 6, 7 and Working Party 1A) - A database for the protection of radio services
		 
		  | 
N/A
   		  | 
 
	     
       	     | 
[ 266 ]  - English -  Word | 
2011-09-29 [09:23] 
 | 
65'239  bytes  | 
		  | 
|   | 
| 
[ 264 ] 
	         | 
2011-09-28 | 
WP 4C
   		  | 
Liaison statement to Study Group 1 (copy to Study Groups 5, 6, 7 and Working parties 1A, 4A) - A database for the protection of radio services
		 
		  | 
N/A
   		  | 
 
	     
       	     | 
[ 264 ]  - English -  Word | 
2011-09-28 [14:22] 
 | 
190'826  bytes  | 
		  | 
|   | 
| 
[ INF 12 ] 
	         | 
2011-09-26 | 
BR Study Group Department
   		  | 
Information for participants - Meetings of Working Parties 7A, 7B, 7C and 7D
		 
		  | 
N/A
   		  | 
 
	     
       	     | 
[ INF 12 ] Revision 1 - English -  Word | 
2011-09-26 [11:54] 
 | 
532'182  bytes  | 
		  | 
|   | 
| 
[ 265 ] 
	         | 
2011-09-26 | 
WP 4C
   		  | 
Liaison statement to Working Party 7C - Updated documents on pulsed interference to RNSS receivers
		 
		  | 
N/A
   		  | 
 
	     
       	     | 
[ 265 ]  - English -  Word | 
2011-09-26 [17:03] 
 | 
49'134  bytes  | 
		  | 
|   | 
| 
[ ADM 8 ] 
	         | 
2011-09-26 | 
Director, BR
   		  | 
Provisional List of Participants - Working Party 7C (Geneva, 26-30 September 2011)
		 
		  | 
N/A
   		  | 
 
	     
       	     | 
[ ADM 8 ]  - Français -  PDF (acrobat)  | 
2011-09-26 [15:31] 
 | 
47'521  bytes  | 
		  | 
|   | 
| 
[ 263 ] 
	         | 
2011-09-23 | 
BR Study Group Department
   		  | 
List of documents issued
		 
		  | 
N/A
   		  | 
 
	     
       	     | 
[ 263 ]  - English -  Word | 
2011-09-23 [15:04] 
 | 
75'931  bytes  | 
		  | 
|   | 
| 
[ 260 ] 
	         | 
2011-09-15 | 
United States of America
   		  | 
Proposed modifications to Annex 3 of Doc. 7C/214 - PDR of Recommendation ITU-R RS.1347 - Feasibility of sharing between radionavigation-satellite service receivers and the Earth exploration-satellite (active) and space research (active) services in the 1 215-1 300 MHz band
		 
		  | 
N/A
   		  | 
 
	     
       	     | 
[ 260 ]  - English -  Word | 
2011-09-21 [16:43] 
 | 
1'135'373  bytes  | 
		  | 
|   | 
| 
[ 258 ] 
	         | 
2011-09-15 | 
United States of America
   		  | 
Draft liaison statement to ITU-R Working Party 5C - Studies regarding WRC-12 Agenda item 1.8 involving FS OOB emissions into EESS (passive) systems in the 86-92 GHz band
		 
		  | 
129-2/7
   		  | 
 
	     
       	     | 
[ 258 ]  - English -  Word | 
2011-09-20 [11:06] 
 | 
58'171  bytes  | 
		  | 
|   | 
| 
[ 262 ] 
	         | 
2011-09-19 | 
United Kingdom of Great Britain and Northern Ireland
   		  | 
Sharing studies between EESS (passive) and fixed service in the band 31.5-31.8 GHz
		 
		  | 
232/7
   		  | 
 
	     
       	     | 
[ 262 ]  - English -  Word | 
2011-09-21 [12:04] 
 | 
184'967  bytes  | 
		  | 
|   | 
| 
[ 254 ] 
	         | 
2011-09-15 | 
United States of America
   		  | 
Evaluation of fixed service OOB interference to EESS (passive) systems in 86-92 GHz
		 
		  | 
129-2/7
   		  | 
 
	     
       	     | 
[ 254 ]  - English -  Word | 
2011-09-20 [14:04] 
 | 
931'574  bytes  | 
		  | 
|   | 
| 
[ 261 ] 
	         | 
2011-09-19 | 
Korea (Republic of)
   		  | 
Draft revision of Recommendation ITU-R RS.515-4 - Frequency bands and bandwidths used for satellite passive remote sensing
		 
		  | 
N/A
   		  | 
 
	     
       	     | 
[ 261 ]  - English -  Word | 
2011-09-21 [14:57] 
 | 
2'657'965  bytes  | 
		  | 
|   | 
| 
[ 259 ] 
	         | 
2011-09-15 | 
United States of America
   		  | 
Draft new Report ITU-R RS.[3.15 GHZ SHARE] - Sharing the 31.5-31.8 GHz band by the fixed and mobile services and the Earth exploration-satellite service (passive)
		 
		  | 
232-1/7
   		  | 
 
	     
       	     | 
[ 259 ]  - English -  Word | 
2011-09-20 [11:23] 
 | 
2'839'579  bytes  | 
		  | 
|   | 
| 
[ 257 ] 
	         | 
2011-09-15 | 
United States of America
   		  | 
Draft liaison statement to ITU-R Working Party 5C - Studies regarding WRC-12 Agenda item 1.20 involving EESS (passive) and HAPS  gateway stations
		 
		  | 
N/A
   		  | 
 
	     
       	     | 
[ 257 ]  - English -  Word | 
2011-09-20 [11:03] 
 | 
57'028  bytes  | 
		  | 
|   | 
| 
[ 249 ] 
	         | 
2011-09-16 | 
France
   		  | 
Analysis and proposed revision to Report ITU-R F.[FS/PASSIVE - 70-80 GHz]
		 
		  | 
N/A
   		  | 
 
	     
       	     | 
[ 249 ]  - English -  Word | 
2011-09-20 [16:52] 
 | 
1'441'574  bytes  | 
		  | 
|   | 
| 
[ 256 ] 
	         | 
2011-09-15 | 
United States of America
   		  | 
Working document towards a preliminary draft new Report - Potential interference between the Earth exploration satellite (active) and space research (active) in the 1 215-1 300 MHz and the Air-Route surveillance radars in the 1 215-1 400 MHz band
		 
		  | 
N/A
   		  | 
 
	     
       	     | 
[ 256 ]  - English -  Word | 
2011-09-21 [11:19] 
 | 
334'884  bytes  | 
		  | 
|   | 
| 
[ 255 ] 
	         | 
2011-09-15 | 
United States of America
   		  | 
Potential impact to EESS (passive) systems operating near 6 GHz from HAPS gateway systems
		 
		  | 
N/A
   		  | 
 
	     
       	     | 
[ 255 ]  - English -  Word | 
2011-09-21 [14:01] 
 | 
2'985'819  bytes  | 
		  | 
|   | 
| 
[ 253 ] 
	         | 
2011-09-15 | 
United States of America
   		  | 
Working document toward a draft new Report RS.[MITIG_RNSS-EESS] "Compatibility measurements and possible mitigation measures between EESS (active) systems and RNSS systems in the band 1 215-1 300 MHz"
		 
		  | 
217-2/4, 288/4
   		  | 
 
	     
       	     | 
[ 253 ]  - English -  Word | 
2011-09-22 [08:36] 
 | 
1'847'729  bytes  | 
		  | 
|   | 
| 
[ 252 ] 
	         | 
2011-09-15 | 
United States of America
   		  | 
Typical technical and operating characteristics and preferred frequency bands of spaceborne radar sounder systems in EESS (active)
		 
		  | 
N/A
   		  | 
 
	     
       	     | 
[ 252 ]  - English -  Word | 
2011-09-20 [15:15] 
 | 
464'005  bytes  | 
		  | 
|   | 
| 
[ 251 ] 
	         | 
2011-09-15 | 
United States of America
   		  | 
Draft liaison statement to ITU-D Study Group 2 and the World Meteorological Organization - Additional information in support of ITU-D Study Group 2 Question 22-1/2
		 
		  | 
N/A
   		  | 
 
	     
       	     | 
[ 251 ]  - English -  Word | 
2011-09-21 [11:16] 
 | 
487'389  bytes  | 
		  | 
|   | 
| 
[ 250 ] 
	         | 
2011-09-15 | 
United States of America
   		  | 
Proposed draft new Recommendation ITU-R RS.[PERF_INTERF], performance and interference criteria for satellite passive remote sensing
		 
		  | 
N/A
   		  | 
 
	     
       	     | 
[ 250 ]  - English -  Word | 
2011-09-20 [11:44] 
 | 
102'291  bytes  | 
		  | 
|   | 
| 
[ 248 ] 
	         | 
2011-09-16 | 
Russian Federation
   		  | 
Technical and operational characteristics of the space station "Spektr-R" passive sensors
		 
		  | 
221/7
   		  | 
 
	     
       	     | 
[ 248 ]  - English -  Word | 
2011-09-19 [14:54] 
 | 
93'064  bytes  | 
		  | 
|   | 
| 
[ 247 ] 
	         | 
2011-09-16 | 
France
	          , Germany (Federal Republic of)
   		  | 
Preliminary analysis of the impact of unwanted emissions of SAR operating at 9 GHz into SRS deep space stations operating in the band 8.4-8.5 GHz and radioastronomy stations operating in the band 10.6-10.7 GHz
		 
		  | 
N/A
   		  | 
 
	     
       	     | 
[ 247 ]  - English -  Word | 
2011-09-19 [16:11] 
 | 
2'284'498  bytes  | 
		  | 
|   | 
| 
[ 245 ] 
	         | 
2011-09-01 | 
Japan
   		  | 
Modification to preliminary draft revision of Recommendation ITU-R RS.1347 - Feasibility of sharing between radionavigation-satellite service receivers and the Earth exploration-satellite (active) and space research (active) services in the 1 2515-1 300 MHz band
		 
		  | 
234/7
   		  | 
 
	     
       	     | 
[ 245 ]  - English -  Word | 
2011-09-12 [17:24] 
 | 
478'606  bytes  | 
		  | 
|   | 
| 
[ 246 ] 
	         | 
2011-09-05 | 
Chairman, SG 7
   		  | 
Report of RAG activities
		 
		  | 
N/A
   		  | 
 
	     
       	     | 
[ 246 ]  - English -  Word | 
2011-09-06 [16:46] 
 | 
61'783  bytes  | 
		  | 
Results: 44 total items.  
	         | 
Multiple Document Download: Formats and Languages to be included (when available):