International Telecommunication Union   ITU
Français  Espańol
 
Site map Contact Us Print version
  Home : ITU-R : WP1C : Contributions  Recently posted -  Search Meeting Documents
   
ITU-R WP1C  C 

ITU-R WP1C

Spectrum Monitoring

Results:174 total items.
Result page:  1 - 2 - 3 - 4  - Next Next
Contributions  Documents / Contributions
 
Number 
Title Source AI/Question
Date
[ 174 ]  
 
Liaison statement to Working Party 1A (copy for information to Working Parties 1B, 1C, 4A 4C, 5B, 5C, 5D, 6A, 7B, 7C and 7D) - Working document toward a preliminary draft new Report ITU-R SM.[CHAR-UNWANTED]     WP 5A     2015-08-26
[ 173 ]  
 
Liaison statement to Working Party 1A (Copy to Working Parties 1B, 1C, 5B, 7A and 7D) - Radio frequency ranges for wireless power transmission using technologies other than a radio frequency beam     WP 6A     2015-08-03
[ 172 ]  
 
Liaison statement on radio frequency interference and co-existence between wired telecommunication and radiocommunication systems (reply to ITU-R WP 5B - 5B/TEMP/372)     ITU-T SG9     2015-07-14
[ 171 ]  
 
Liaison statement to ITU-T Study Group 5 (copy for information to ITU-R Working Parties 1C, 3L, 4C, 5A, 5B, 5C, 6A, 7D and ITU-T Study Groups 9 and 15) - ITU-R interest in K-series Recommendations     WP 1A     2015-06-12
[ 170 ]  
 
Liaison statement to Working Party 3L (copy to ITU-R Working Parties 1C, 4C, 5A, 5B, 5C, 5D, 6A, and 7D and to ITU-T Study Groups 5, 9, and 15) - Evaluating the leakage and impact of radio frequency noise from telecommunication systems using metallic conductors     WP 1A     2015-06-12
[ 169 ]  
+Ann.1-10 
Report of the meeting of Working Party 1C (Geneva, 3 - 10 June 2015)     Chairman, WP 1C     2015-06-10
[ 168 ]  
(Rev.1) 
Final list of participants - Working Party 1C (Geneva, 3-10 June 2015)     Director, BR     2015-06-09
[ 167 ]  
 
List of documents issued (Documents 1C/119 - 1C/167)     BR Study Groups Department     2015-06-02
[ 166 ]  
 
Report of Correspondence Group Activity on preliminary draft new Recommendation ITU-R SM.[ Doc.XXX] - Proposal for a new Recommendation on alternative test procedure for measuring accuracy and immunity of direction finder using a simulator     CG on DF Accuracy     2015-05-27
[ 165 ]  
 
Report of Correspondence Group Activity on preliminary draft new Recommendation ITU-R SM.[ON-SITE_DF_ACC] - On-site measurement of DF Accuracy     CG on DF Accuracy     2015-05-27
[ 164 ]  
 
Critical area for measuring and setting synchronization in medium frequency     Iran (Islamic Republic of)     2015-05-27
[ 163 ]  
 
Proposed preliminary draft revision of Recommendation ITU-R SM.1753-2 - Methods for measurements of radio noise     Japan     2015-05-27
[ 162 ]  
 
Proposal for a preliminary draft new Recommendation ITU-R SM.[Precision of time information in output data of monitoring receivers] - Precision of time information in output data of monitoring receivers     Japan     2015-05-27
[ 161 ]  
 
Proposal for a preliminary draft new Recommendation on alternative test procedure for measuring accuracy and immunity of direction finder using a simulator     Japan     2015-05-27
[ 160 ]  
 
Proposed revision to Report ITU-R SM.2130 - Inspection of radio stations     Korea (Republic of)     2015-05-27
[ 159 ]  
 
Proposal on the modification of the working document toward a preliminary draft new Recommendation ITU-R SM.[ON-SITE_DF_ACC] - On-Site Measurements of DF Accuracy     China (People's Republic of)     2015-05-22
[ 158 ]  
 
Proposed revisions to Recommendation ITU-R SM.1880 - Spectrum occupancy measurement     China (People's Republic of)     2015-05-22
[ 157 ]  
 
Working document towards a preliminary draft new Report ITU-R SM.[SPEC_MON_EVOLUTION] - Spectrum monitoring evolution     Chairman, CG on Spectrum Monitoring Evolution     2015-05-22
[ 156 ]  
 
Working document towards a preliminary draft new Report - Measurement techniques and new technologies for satellite monitoring     China (People's Republic of)     2015-05-22
[ 155 ]  
 
Working document toward a preliminary draft new Recommendation ITU-R SM.[ON-SITE_DF_ACC] - On-site measurement of DF accuracy     China (People's Republic of)     2015-05-22
[ 154 ]  
 
Proposed contribution to the working document towards a preliminary draft new Report ITU-R SM.[SPEC_MON_EVOLUTION] - The grid monitoring experimental network for metropolitan environment in Shanghai, China     China (People's Republic of)     2015-05-22
[ 153 ]  
 
Proposal for a new Recommendation on test procedure for measuring direction finder sensitivity - Test procedure for measuring direction finder sensitivity     China (People's Republic of)     2015-05-22
[ 152 ]  
 
Review of working document toward a preliminary draft new Recommendation ITU-R SM.[ON-SITE-DF-ACC] - On-site measurements of DF accuracy     Greece     2015-05-22
[ 151 ]  
 
RF Human hazards - ITU Intersectoral activities     Israel (State of)     2015-05-21
[ 150 ]  
 
Preliminary draft new Report ITU-R SM.[PLANNING_SMN] - Procedures for planning and optimization of spectrum-monitoring networks in the VHF/UHF frequency range     Chairman CG on Planning SMN     2015-05-20
[ 149 ]  
(Rev.1) 
Comments on the working document toward a preliminary draft new Recommendation ITU-R SM.[ON-SITE_DF_ACC] - On-site measurements of DF accuracy     GEW Technologies (Pty) Ltd.     2015-05-14
[ 148 ]  
 
Review of working document towards a preliminary draft new Recommendation ITU-R SM.[ON-SITE_DF_ACC] - On-site measurements of DF accuracy     MEDAV GmbH     2015-05-14
[ 147 ]  
 
Proposal for the revision of Recommendation ITU-R SM.1600 - Technical identification of digital signals     United States of America     2015-05-13
[ 146 ]  
 
Proposed modifications to Report ITU-R SM.2257-2 - Spectrum management and monitoring during major events     Indonesia (Republic of)     2015-05-08
[ 145 ]  
 
Preliminary draft new Recommendation ITU-R SM.[DOC. _ _ _ _] - Inserting highly precise time information in I/Q data of monitoring receivers     GEW Technologies (Pty) Ltd.     2015-04-30
[ 144 ]  
 
Report to Working Party 1C on the review of ITU-R Recommendations in the SM Series for the database on ITU-R Recommendations     Brazil (Federative Republic of)     2015-04-24
[ 143 ]  
 
Spectrum management activities for the FIFA Soccer World Cup 2014 Brazil     Brazil (Federative Republic of)     2015-04-24
[ 142 ]  
 
Working document towards the Report ITU-R SM.[PLANNING_SMN] - Optimization of the planning of spectrum monitoring networks topology in VHF/UHF range using irregular model of monitoring networks     Ukraine     2015-03-18
[ 141 ]  
 
Liaison statement to ITU-R Study Groups 1, 3, 4, 5 and 7, ITU-T Study Group 5 and ITU-D Study Groups 1 and 2 - Human exposure to RF fields from broadcast transmitters     WP 6A     2015-03-03
[ 140 ]  
 
Proposal for revision of Report ITU -R SM.2256 - Spectrum occupancy measurements and evaluation     Russian Federation     2015-02-25
[ 139 ]  
 
Draft revision of Recommendation ITU -R SM.1880 - Spectrum occupancy measurement     Russian Federation     2015-02-25
[ 138 ]  
 
This document has been withdrawn     BR Study Groups Department     2015-02-25
[ 137 ]  
 
Liaison statement on comments to the WHO Monograph "Radio Frequency fields: Environmental Health Criteria, Chapter 2: Sources, measurements and exposures"     ITU-T SG 5     2015-02-11
[ 136 ]  
 
Liaison statement to WP 1A (copy for information to WPs 1B, 1C, 4A, 4C, 5A, 5B, 5C, 6A, 7B, 7C and 7D) - Characteristics of the unwanted emissions in the out-of-band and spurious domains for digital modulation technology used in broadband communication systems     WP 5D     2015-02-10
[ 135 ]  
 
Liaison statement on ITU-T Question 7/5 work items for the 2014-2018 study period (reply to ITU-D Study Group 2 - Document 2/113)     ITU-T SG 5     2015-02-10
[ 134 ]  
 
Results of the 21st RAG meeting (Geneva, 24 to 27 June 2014)     Chairman, SG 1     2015-02-06
[ 133 ]  
 
Liaison statement from ITU-D Study Group 2 Question 7/2 to ITU-T Study Group 5 , ITU-R Study Group 1, ITU-R Study Group 5, ITU-R Study Group 6 and their relevant Working Parties on Q7/2 work items for the 2014 - 2018 study period     ITU-D SG 2     2014-11-17
[ 132 ]  
 
Liaison statement to Working Party 1A (copy for information to Working Parties 1B, 1C, 4A, 4C, 5B, 5C, 5D, 6A, 7B, 7C and 7D) - Characteristics of the unwanted emissions in the out-of-band and spurious domains for digital modulation technology used in broadband communications systems     WP 5A     2014-11-10
[ 131 ]  
 
Liaison statement to Working Parties 1C, 5A and 5C - Station call-sign identification to be used by oceanographic radar in frequency band 3 to 50 MHz     WP 5B     2014-11-05
[ 130 ]  
 
RF Human hazards - Intersectoral activities     Israel (State of)     2014-10-26
[ 129 ]  
 
Liaison statement to Working Party 1C - Working document towards a preliminary draft new Report ITU-R RA.[SATMON]     WP 7D   227/7   2014-10-17
[ 128 ]  
 
Liaison statement on leakage of radio frequency energy from J.HiNoC systems and coexistence of wired telecommunications with radiocommunication systems - Considerations with respect to work on Recommendation ITU-T J.195.1 (J.HINOC-REQ)     ITU-T SG 9     2014-09-30
[ 127 ]  
 
Reply liaison statement to Working Party 1C - Information documents on indoor noise measurement     WP 3L     2014-09-15
[ 126 ]  
 
Liaison statement on information about work that is being carried out within work under study in ITU-T Question 7/5     ITU-T WP 2/5     2014-08-08
[ 125 ]  
 
Liaison statement to ITU-T Study Groups 5 and 9, and ITU-R Working Parties 1C, 3L, 4C, 5A, 5B, 5C and 7D - Leakage of radio frequency energy from J.HiNoC systems     WP 1A     2014-06-20
Results:174 total items.
Result page:  1 - 2 - 3 - 4  - Next Next
 
Multiple Document Download: Check the boxes of the selected documents, then click "Zip and download"
   
 
User preferences: 
Multiple Document Download: Formats and Languages to be included (when available):
HTML Navigation Pages  
Formats  + Other formats
Languages (maximum 2)  + Multilingual 
(E: English - F: French - S: Spanish - A: Arabic - C: Chinese - R: Russian)

Top -  Feedback -  Contact Us -  Copyright © ITU 2008 All Rights Reserved
Contact for this page :  ITU-R Web coordinator
Updated : 2015-08-28