International Telecommunication Union   ITU
Français  Español
 
Site map Contact Us Print version
  Home : ITU-R : WP1A : Contributions : 454 Recently posted -  Search Meeting Documents
   
[454]  Report on the sixth 2015-2019 meeting of Working Party 1A (Geneva, 28 May - 5 June 2019)

Format

Size

Posted

English

Word  

3279518 bytes 2019-06-21 [454] Annex 15 - Working document toward a preliminary draft revision of REPORT ITU-R SM.2352-0 - Technology trends of active services in the frequency range 275-3 000 GHz

Word  

54022 bytes 2019-06-21 [454] Annex 14 - Working document towards a preliminary draft new recommendation ITU-R SM.[OPTICAL WIRELESS] - Reducing the constraints of current radio frequency delivery mechanisms using Optical wireless communication

Word  

45306 bytes 2019-07-12 [454] Annex 13 Revision 1 - Terms of reference for the correspondence group on - EMC Related Interference and Coexistence of Wired Telecommunications Systems with Radiocommunication Systems

Word  

2295746 bytes 2019-06-21 [454] Annex 12 - Working document towards a preliminary draft new Report ITU-R SM.[EMI-IOT] - Evaluation of radiated electromagnetic disturbances of household appliances and their interferences over an IoT network

Word  

624571 bytes 2019-06-21 [454] Annex 11 - Working document towards a preliminary draft new REPORT ITU-R SM.[MIMO_PLT] - Multiple input multiple output operation in power line telecommunications

Word  

4185094 bytes 2019-06-21 [454] Annex 10 - Working document towards a preliminary draft revision of Report ITU-R SM.2351-2 - Smart grid utility management systems

Word  

52659 bytes 2019-06-20 [454] Annex 09 - Reply liaison statement to CISPR (Sub-committee B) on - Applications of wireless power transmission via radio frequency beam

Word  

2134956 bytes 2019-06-20 [454] Annex 08 - Working document towards a preliminary draft new Report ITU-R SM.[WPT.BEAM.IMPACTS] - Impact study and human hazard issues for Wireless Power Transmission via radio frequency beam

Word  

52418 bytes 2019-06-21 [454] Annex 07 - Detailed work plan for the development of a working document towards a preliminary draft new Report ITU-R SM.[WPT.BEAM.IMPACTS]

Word  

8005291 bytes 2019-06-21 [454] Annex 06 - Working document towards a preliminary draft revision of Report ITU-R SM.2392-0 - Applications of wireless power transmission via radio frequency beam

Word  

82084 bytes 2019-06-21 [454] Annex 05 - Detailed work plan for the development of a working document towards a preliminary draft revision of Report ITU-R SM.2392-0

Word  

83995 bytes 2019-06-21 [454] Annex 04 - Working document towards a preliminary draft new Recommendation ITU-R SM.[WPT.BEAM.FRQ] - Frequency ranges for operation of wireless power transmission systems via radio frequency beam

Word  

52351 bytes 2019-06-21 [454] Annex 03 - Detailed work plan for the development of a working document towards a preliminary draft new Recommendation ITU-R SM.[WPT.BEAM.FRQ]

Word  

79949 bytes 2019-06-21 [454] Annex 02 - Working document towards a preliminary draft new Recommendation ITU-R [WPT-EMISSIONS] - Limits and Measures to mitigate the impact of Wireless power transmission systems on radiocommunications services operating below [30 MHz]

Word  

55675 bytes 2019-06-21 [454] Annex 01 - Preliminary draft revision of Question ITU-R 210-3/1 - Wireless power transmission

Word  

120589 bytes 2019-07-11 [454]  - Report of the Sixth 2015-2019 meeting of Working Party 1A (Geneva, 28 May-5 June 2019)
 

Document :

ITU-R WP1A  Contribution  454

Title :

Report on the sixth 2015-2019 meeting of Working Party 1A (Geneva, 28 May - 5 June 2019)

Date :

2019-06-05

Source :

Chairman, WP 1A

Access :

Restricted to TIES users [ITU-R]

Top -  Feedback -  Contact Us -  Copyright © ITU 2008 All Rights Reserved
Contact for this page :  ITU-R Web coordinator
Updated : 2019-07-12