Union Internationale des Télécommunications   UIT
English  Español
 
Plan du site Contactez-nous Copie Imprimable
  Page d'accueil : UIT-R : WP1A : Contributions  Ajoutés récemment -  Recherche de documents de réunion
   
UIT-R WP1A  C 

UIT-R WP1A

Techniques d´Ingénierie du Spectre

Resultats:287 documents
Résultats :  1 - 2 - 3 - 4 - 5 - 6  - Suivant Next
Contributions  Documents / Contributions
 
Numéro 
Titre Source AI/Question
Date
[ 287 ]  
 
Reply liaison statement to Working Party 1A - (Copy to Working Parties 4C, 5A, 5D, 7C for information) - Beam Wireless Power Transmission (WPT)     WP 7D     2023-10-17
[ 286 ]  
 
Reply liaison statement to Working Party 1A (Copy to Working Parties 4A, 5C, 5D, 7C and 7D for information) - Beam Wireless Power Transmission (WPT) operating in the frequency band 24.1-24.15 GHz     WP 5A     2023-09-26
[ 285 ]  
 
Reply liaison statement to CISPR/H (copy for information or action to Working Parties 4A and 7D on Question 6) (copy for information to Study Group 1 and Working Parties 1A and 5A)     WP 6A     2023-09-11
[ 284 ]  
 
Reply liaison statement from Working Party 6A to Working Party 1A - Preliminary draft revision to Report ITU-R SM.2449-0     WP 6A     2023-09-08
[ 283 ]  
 
Reply liaison statement to Working Party 1A (copy to International Maritime Organization and International Civil Aviation Organization for information) - Comments on WPT studies     WP 5B     2023-07-28
[ 282 ]  
 
Reply liaison statement to Working Party 1A (copy to Working Parties 5A, 5D, 7C and 7D for information) - Beam Wireless Power Transmission (WPT)     WP 4C     2023-07-11
[ 281 ]  
 
Reply liaison statement to Working Party 1A - Wireless Power Transmission (WPT) for Electric Vehicles     WP 7A     2023-07-04
[ 280 ]  
 
Liaison statement to ITU-R Working Party 5B (copy to Working Party 1A for information)     International Maritime Organisation     2023-06-22
[ 279 ]  
 
Note to the Chairmen of Working Parties 4A and 7D (copy to the Chairmen of Study Group 1 and Working Party 1A)     Chairman, WP 6A     2023-06-14
[ 278 ]  
 
Liaison statement to Working Parties 1A, 1B, 1C, 4A, 4B, 4C, 5A, 5B, 5C, 5D, 6A, 7B, 7C and 7D - Future Study Group 3 work plan for frequencies above 100 GHz     WP 3M     2023-06-09
[ 277 ]  
+Ann.1-16 
Report on the fifth 2019-2023 meeting of Working Party 1A (Thessaloniki, Greece, 29 May - 2 June 2023)     Chairman, WP 1A     2023-06-02
[ 276 ]  
 
Final list of participants - Working Party 1A (Thessaloniki, Greece, 29 May - 2 June 2023)     Director, BR     2023-06-02
[ 275 ]  
 
List of documents issued (Documents 1A/226-1A/275)     BR, Study Groups Department     2023-05-30
[ 274 ]  
(Rev.2) 
Report on CISPR Activities from June 2022 to May 2023 - On WPT and general issues     SG 1 Rapp. to CISPR on WPT Issues     2023-05-26
[ 273 ]  
 
Proposed editorial revision of five Recommendations assigned to ITU-R Working Party 1A     Chairman/Focal Point, SG 1 CG on editorial review     2023-05-23
[ 272 ]  
 
Recent developments concerning EMC-related interference, RF noise, product standards and coexistence with wired telecommunication systems     Chairman, CG on EMC     2023-05-23
[ 271 ]  
 
Editorial corrections to preliminary draft revision of Recommendation ITU-R SM.2129-0, adding inductive qualification to frequency band 6 765-6 795 kHz and 13 353-13 567 kHz     Netherlands (Kingdom of the)     2023-05-22
[ 270 ]  
 
Response to Document 1A/257     Germany (Federal Republic of)     2023-05-22
[ 269 ]  
 
Revision of Report ITU-R SM.2449 - Technical characteristics and impact analyses of non-beam inductive wireless power transmission for mobile and portable devices on radiocommunication services     Germany (Federal Republic of)     2023-05-22
[ 268 ]  
 
Revision of Recommendation ITU-R SM.2129 - Guidance on frequency ranges for the operation of non-beam wireless power transmission systems for mobile and portable devices     Germany (Federal Republic of)     2023-05-22
[ 267 ]  
 
Proposed modifications to preliminary draft revision of Report ITU-R SM.2303-3 - Wireless power transmission using technologies other than radio frequency beam     SG 1 Rapp. to CISPR on WPT Issues     2023-05-22
[ 266 ]  
 
Editorial revisions of ITU-R SM-series Recommendations that cite CISPR publications     SG 1 Rapp. to CISPR     2023-05-22
[ 265 ]  
 
Proposed revisions to the revision of Annex 6 to Report ITU-R SM.2451-1 - Assessment of impact study on radiocommunication services from wireless power transmission for electric vehicle operating below 30 MHz     Korea (Republic of)   Q210/3   2023-05-19
[ 264 ]  
 
Modifications to preliminary draft revision of Report ITU-R SM.2303-3 - Wireless power transmission using technologies other than radio frequency beam     Korea (Republic of)     2023-05-19
[ 263 ]  
 
Reply liaison statement to Working Party 3M (copy to Working Parties 1A, 4A, 4C, 5B, 5C, 5D, 6A, 7B, 7C and 7D) - Future development of P-series Recommendations to address frequencies above 100 GHz     WP 5A     2023-05-19
[ 262 ]  
 
Proposed modifications to preliminary draft revision of Report ITU-R SM.2303-3 - Wireless power transmission using technologies other than radio frequency beam     Japan   Q210/4   2023-05-18
[ 261 ]  
 
Additional insights on UWB density assumptions when interfering IMT-2030 in the 6 425-7 125 MHz frequency band     Russian Federation     2023-05-18
[ 260 ]  
 
Compatibility studies between UWB devices and IMT-2020 indoor small cells networks in the frequency band     Germany (Federal Republic of)     2023-05-17
[ 259 ]  
 
Reply liaison statement to Working Party 1A (copy to Working Parties 5B, 5C, 5D, 7C and 7D) - Report ITU-R SM.2352     WP 5A     2023-05-17
[ 258 ]  
 
Proposed modifications to preliminary draft revision to Report ITU-R SM.2449-0     China (People's Republic of)     2023-05-17
[ 257 ]  
 
Considerations on Chapter 8 of Annex 2 to Working Party 1A Chairman's Report     China (People's Republic of)     2023-05-17
[ 256 ]  
 
Considerations on Annex 9 to Working Party 1A Chairman's Report (Doc. 1A/226)     China (People's Republic of)     2023-05-17
[ 255 ]  
 
Improvement to Report ITU-R SM.2422-2 - Visible light for broadband communications     China (People's Republic of)     2023-05-17
[ 254 ]  
 
Draft revision of Recommendation ITU-R SM.2129-0     United States of America     2023-05-12
[ 253 ]  
 
Draft revision of Report ITU-R SM.2303-3     United States of America     2023-05-12
[ 252 ]  
 
Proposed preliminary draft revision to Recommendation ITU-R SM.2110-1     United States of America     2023-05-12
[ 251 ]  
 
Working document towards a preliminary draft revision of Report ITU-R SM.2505-0 - Impact studies and human hazard issues for wireless power transmission via radio frequency beam     United States of America     2023-05-12
[ 250 ]  
 
Working document towards a preliminary draft revision of Recommendation ITU-R SM.2151-0 - Guidance on frequency ranges for operation of wireless power transmission via radio frequency beam systems for mobile/portable devices and sensor networks     United States of America     2023-05-12
[ 249 ]  
 
Proposed revision of Report ITU-R SM.2392-1 - Applications of wireless power transmission via radio frequency beam     United States of America     2023-05-12
[ 248 ]  
 
Liaison statement on the new version of the Home Network Transport (HNT) standards overview and work plan     ITU-T SG15     2023-05-04
[ 247 ]  
 
Liaison statement on the new version of the Access Network Transport (ANT) Standards Overview and Work plan     ITU-T SG15     2023-05-04
[ 246 ]  
 
Definitions of the terms "sharing", "compatibility" and "coexistence     Switzerland (Confederation of)     2023-05-01
[ 245 ]  
 
Liaison response from International Special Committee on Radio Interference - CISPR/H to ITU-R Working Party 6A (copy to ITU-R Study Group 1 and Working Party 1A for information)     International Special Committee on Radio Interference     2023-04-28
[ 244 ]  
 
Liaison statement to Working Party 1A on RF WPT activities     International Electrotechnical Commission     2023-04-20
[ 243 ]  
(Rev.1) 
Revision of Recommendation ITU-R SM.2110 - Guidance on frequency ranges for operation of non-beam wireless power transmission for electric vehicles     ATDI   Q210/1   2023-03-08
[ 242 ]  
 
Report of the eighteenth meeting of the joint IMO/ITU Experts Group on Maritime Radiocommunication Matters     International Maritime Organization     2023-01-11
[ 241 ]  
(Rev.1) 
Reply liaison statement to Working Party 3M (copy to Working Parties 1A, 1B, 1C, 4A, 4B, 4C, 5A, 5B, 5D, 6A, 7B, and 7D for information) - Future development of P-series recommendations to address frequencies above 100 GHz     WP 5C     2022-12-01
[ 240 ]  
 
Reply liaison statement to Working Party 1A (copy to Working Party 5A) - Comments on preliminary draft revision of Report ITU-R SM.2449     WP 5C     2022-11-30
[ 239 ]  
 
Liaison statement to the International Maritime Organization (copy to Working Party 1A for information)     WP 5B     2022-11-28
[ 238 ]  
 
Reply liaison statement to Working Party 1A (copy to Working Parties 5A and 5C for information) - Comments on preliminary draft revision of Report ITU-R SM.2449     WP 5B     2022-11-21
Resultats:287 documents
Résultats :  1 - 2 - 3 - 4 - 5 - 6  - Suivant Next
 
Téléchargement de multiples documents: Cocher les cases correspondant aux documents sélectionnés, puis appuyer sur "Télécharger"
   
 
Préférences utilisateur: 
Téléchargement de multiples documents: Formats et langues à prendre en compte (si disponibles):
Pages de navigation HTML  
Formats  + Autres formats
Langues (maximum 2)  + Multilingue 
(E: Anglais - F: Français - S: Espagnol - A: Arabe - C: Chinois - R: Russe)

Début de page -  Commentaires -  Contactez-nous -  Droits d'auteur © UIT 2008 Tous droits réservés
Contact pour cette page :  Coordinateur du Web UIT-R
Mis à jour le : 2024-05-31