Contributions |
|
Numéro
|
Titre
|
Source
|
AI/Question
|
Date
|
|
[ 287 ]
|
Reply liaison statement to Working Party 1A - (Copy to Working Parties 4C, 5A, 5D, 7C for information) - Beam Wireless Power Transmission (WPT)
|
WP 7D
|
|
2023-10-17 |
|
[ 286 ]
|
Reply liaison statement to Working Party 1A (Copy to Working Parties 4A, 5C, 5D, 7C and 7D for information) - Beam Wireless Power Transmission (WPT) operating in the frequency band 24.1-24.15 GHz
|
WP 5A
|
|
2023-09-26 |
|
[ 285 ]
|
Reply liaison statement to CISPR/H (copy for information or action to Working Parties 4A and 7D on Question 6) (copy for information to Study Group 1 and Working Parties 1A and 5A)
|
WP 6A
|
|
2023-09-11 |
|
[ 284 ]
|
Reply liaison statement from Working Party 6A to Working Party 1A - Preliminary draft revision to Report ITU-R SM.2449-0
|
WP 6A
|
|
2023-09-08 |
|
[ 283 ]
|
Reply liaison statement to Working Party 1A (copy to International Maritime Organization and International Civil Aviation Organization for information) - Comments on WPT studies
|
WP 5B
|
|
2023-07-28 |
|
[ 282 ]
|
Reply liaison statement to Working Party 1A (copy to Working Parties 5A, 5D, 7C and 7D for information) - Beam Wireless Power Transmission (WPT)
|
WP 4C
|
|
2023-07-11 |
|
[ 281 ]
|
Reply liaison statement to Working Party 1A - Wireless Power Transmission (WPT) for Electric Vehicles
|
WP 7A
|
|
2023-07-04 |
|
[ 280 ]
|
Liaison statement to ITU-R Working Party 5B (copy to Working Party 1A for information)
|
International Maritime Organisation
|
|
2023-06-22 |
|
[ 279 ]
|
Note to the Chairmen of Working Parties 4A and 7D (copy to the Chairmen of Study Group 1 and Working Party 1A)
|
Chairman, WP 6A
|
|
2023-06-14 |
|
[ 278 ]
|
Liaison statement to Working Parties 1A, 1B, 1C, 4A, 4B, 4C, 5A, 5B, 5C, 5D, 6A, 7B, 7C and 7D - Future Study Group 3 work plan for frequencies above 100 GHz
|
WP 3M
|
|
2023-06-09 |
|
[ 277 ]
+Ann.1-16 |
Report on the fifth 2019-2023 meeting of Working Party 1A (Thessaloniki, Greece, 29 May - 2 June 2023)
|
Chairman, WP 1A
|
|
2023-06-02 |
|
[ 276 ]
|
Final list of participants - Working Party 1A (Thessaloniki, Greece, 29 May - 2 June 2023)
|
Director, BR
|
|
2023-06-02 |
|
[ 275 ]
|
List of documents issued (Documents 1A/226-1A/275)
|
BR, Study Groups Department
|
|
2023-05-30 |
|
[ 274 ]
(Rev.2) |
Report on CISPR Activities from June 2022 to May 2023 - On WPT and general issues
|
SG 1 Rapp. to CISPR on WPT Issues
|
|
2023-05-26 |
|
[ 273 ]
|
Proposed editorial revision of five Recommendations assigned to ITU-R Working Party 1A
|
Chairman/Focal Point, SG 1 CG on editorial review
|
|
2023-05-23 |
|
[ 272 ]
|
Recent developments concerning EMC-related interference, RF noise, product standards and coexistence with wired telecommunication systems
|
Chairman, CG on EMC
|
|
2023-05-23 |
|
[ 271 ]
|
Editorial corrections to preliminary draft revision of Recommendation ITU-R SM.2129-0, adding inductive qualification to frequency band 6 765-6 795 kHz and 13 353-13 567 kHz
|
Netherlands (Kingdom of the)
|
|
2023-05-22 |
|
[ 270 ]
|
Response to Document 1A/257
|
Germany (Federal Republic of)
|
|
2023-05-22 |
|
[ 269 ]
|
Revision of Report ITU-R SM.2449 - Technical characteristics and impact analyses of non-beam inductive wireless power transmission for mobile and portable devices on radiocommunication services
|
Germany (Federal Republic of)
|
|
2023-05-22 |
|
[ 268 ]
|
Revision of Recommendation ITU-R SM.2129 - Guidance on frequency ranges for the operation of non-beam wireless power transmission systems for mobile and portable devices
|
Germany (Federal Republic of)
|
|
2023-05-22 |
|
[ 267 ]
|
Proposed modifications to preliminary draft revision of Report ITU-R SM.2303-3 - Wireless power transmission using technologies other than radio frequency beam
|
SG 1 Rapp. to CISPR on WPT Issues
|
|
2023-05-22 |
|
[ 266 ]
|
Editorial revisions of ITU-R SM-series Recommendations that cite CISPR publications
|
SG 1 Rapp. to CISPR
|
|
2023-05-22 |
|
[ 265 ]
|
Proposed revisions to the revision of Annex 6 to Report ITU-R SM.2451-1 - Assessment of impact study on radiocommunication services from wireless power transmission for electric vehicle operating below 30 MHz
|
Korea (Republic of)
|
Q210/3
|
2023-05-19 |
|
[ 264 ]
|
Modifications to preliminary draft revision of Report ITU-R SM.2303-3 - Wireless power transmission using technologies other than radio frequency beam
|
Korea (Republic of)
|
|
2023-05-19 |
|
[ 263 ]
|
Reply liaison statement to Working Party 3M (copy to Working Parties 1A, 4A, 4C, 5B, 5C, 5D, 6A, 7B, 7C and 7D) - Future development of P-series Recommendations to address frequencies above 100 GHz
|
WP 5A
|
|
2023-05-19 |
|
[ 262 ]
|
Proposed modifications to preliminary draft revision of Report ITU-R SM.2303-3 - Wireless power transmission using technologies other than radio frequency beam
|
Japan
|
Q210/4
|
2023-05-18 |
|
[ 261 ]
|
Additional insights on UWB density assumptions when interfering IMT-2030 in the 6 425-7 125 MHz frequency band
|
Russian Federation
|
|
2023-05-18 |
|
[ 260 ]
|
Compatibility studies between UWB devices and IMT-2020 indoor small cells networks in the frequency band
|
Germany (Federal Republic of)
|
|
2023-05-17 |
|
[ 259 ]
|
Reply liaison statement to Working Party 1A (copy to Working Parties 5B, 5C, 5D, 7C and 7D) - Report ITU-R SM.2352
|
WP 5A
|
|
2023-05-17 |
|
[ 258 ]
|
Proposed modifications to preliminary draft revision to Report ITU-R SM.2449-0
|
China (People's Republic of)
|
|
2023-05-17 |
|
[ 257 ]
|
Considerations on Chapter 8 of Annex 2 to Working Party 1A Chairman's Report
|
China (People's Republic of)
|
|
2023-05-17 |
|
[ 256 ]
|
Considerations on Annex 9 to Working Party 1A Chairman's Report (Doc. 1A/226)
|
China (People's Republic of)
|
|
2023-05-17 |
|
[ 255 ]
|
Improvement to Report ITU-R SM.2422-2 - Visible light for broadband communications
|
China (People's Republic of)
|
|
2023-05-17 |
|
[ 254 ]
|
Draft revision of Recommendation ITU-R SM.2129-0
|
United States of America
|
|
2023-05-12 |
|
[ 253 ]
|
Draft revision of Report ITU-R SM.2303-3
|
United States of America
|
|
2023-05-12 |
|
[ 252 ]
|
Proposed preliminary draft revision to Recommendation ITU-R SM.2110-1
|
United States of America
|
|
2023-05-12 |
|
[ 251 ]
|
Working document towards a preliminary draft revision of Report ITU-R SM.2505-0 - Impact studies and human hazard issues for wireless power transmission via radio frequency beam
|
United States of America
|
|
2023-05-12 |
|
[ 250 ]
|
Working document towards a preliminary draft revision of Recommendation ITU-R SM.2151-0 - Guidance on frequency ranges for operation of wireless power transmission via radio frequency beam systems for mobile/portable devices and sensor networks
|
United States of America
|
|
2023-05-12 |
|
[ 249 ]
|
Proposed revision of Report ITU-R SM.2392-1 - Applications of wireless power transmission via radio frequency beam
|
United States of America
|
|
2023-05-12 |
|
[ 248 ]
|
Liaison statement on the new version of the Home Network Transport (HNT) standards overview and work plan
|
ITU-T SG15
|
|
2023-05-04 |
|
[ 247 ]
|
Liaison statement on the new version of the Access Network Transport (ANT) Standards Overview and Work plan
|
ITU-T SG15
|
|
2023-05-04 |
|
[ 246 ]
|
Definitions of the terms "sharing", "compatibility" and "coexistence
|
Switzerland (Confederation of)
|
|
2023-05-01 |
|
[ 245 ]
|
Liaison response from International Special Committee on Radio Interference - CISPR/H to ITU-R Working Party 6A (copy to ITU-R Study Group 1 and Working Party 1A for information)
|
International Special Committee on Radio Interference
|
|
2023-04-28 |
|
[ 244 ]
|
Liaison statement to Working Party 1A on RF WPT activities
|
International Electrotechnical Commission
|
|
2023-04-20 |
|
[ 243 ]
(Rev.1) |
Revision of Recommendation ITU-R SM.2110 - Guidance on frequency ranges for operation of
non-beam wireless power transmission for electric vehicles
|
ATDI
|
Q210/1
|
2023-03-08 |
|
[ 242 ]
|
Report of the eighteenth meeting of the joint IMO/ITU Experts Group on Maritime Radiocommunication Matters
|
International Maritime Organization
|
|
2023-01-11 |
|
[ 241 ]
(Rev.1) |
Reply liaison statement to Working Party 3M (copy to Working Parties 1A, 1B, 1C, 4A, 4B, 4C, 5A, 5B, 5D, 6A, 7B, and 7D for information) - Future development of P-series recommendations to address frequencies above 100 GHz
|
WP 5C
|
|
2022-12-01 |
|
[ 240 ]
|
Reply liaison statement to Working Party 1A (copy to Working Party 5A) - Comments on preliminary draft revision of Report ITU-R SM.2449
|
WP 5C
|
|
2022-11-30 |
|
[ 239 ]
|
Liaison statement to the International Maritime Organization (copy to Working Party 1A for information)
|
WP 5B
|
|
2022-11-28 |
|
[ 238 ]
|
Reply liaison statement to Working Party 1A (copy to Working Parties 5A and 5C for information) - Comments on preliminary draft revision of Report ITU-R SM.2449
|
WP 5B
|
|
2022-11-21 |
Resultats:287 documents Résultats :
1 -
2 -
3 -
4 -
5 -
6
- Suivant
|
Téléchargement de multiples documents: Formats et langues à prendre en compte (si disponibles):