Number |
Date
|
Source
|
Title
|
Questions
|
|
Number |
Posted |
Size
|
|
|
|
[ 244 ]
|
2023-10-11 |
Chairman, WP 7D
|
Report of the meeting of Working Party 7D (Geneva, 5-11 October 2023)
|
N/A
|
|
[ 244 ] - English - Word |
2023-11-12 [13:38]
|
85'073 bytes |
Report on the October 2023 meeting of Working Party 7D (Geneva with Online Participation, 5-11 October 2023)
|
|
[ 244 ] Annex 11 - English - Word |
2023-10-19 [16:40]
|
40'042 bytes |
List of output (Temp) documents (Documents 7D/TEMP/79 - 7D/TEMP/93)
|
|
[ 244 ] Annex 10 - English - Word |
2023-10-17 [12:42]
|
2'918'718 bytes |
Preliminary draft new Report ITU-R RA.[HARMONICS] - Harmonics-related unwanted emissions in radio astronomy bands: measurement of impacts of harmonic emission at radio astronomy facilities
|
|
[ 244 ] Annex 8 - English - Word |
2023-10-17 [12:35]
|
51'791 bytes |
Working document towards a preliminary draft revision of Report ITU-R RA.2188-1 - Power flux-density and e.i.r.p. levels potentially damaging to radio astronomy receivers
|
|
[ 244 ] Annex 7 - English - Word |
2023-10-17 [12:34]
|
56'406 bytes |
Working document towards a preliminary draft new Recommendation ITU-R RA.[GEOVLBI] - Guidance to Administrations regarding Geodetic Very Long Baseline Interferometry Networks
|
|
[ 244 ] Annex 9 - English - Word |
2023-10-17 [12:33]
|
5'610'688 bytes |
Preliminary draft new Report ITU-R RA.[RAS-IMT-COMPAT-43-GHZ] - Methodology for the coordination of IMT systems and stations of the radio astronomy service operating in the frequency band 42.5-43.5 GHz
|
|
[ 244 ] Annex 6 - English - Word |
2023-10-16 [14:08]
|
6'154'255 bytes |
Working document towards a preliminary draft new Report ITU-R RA.[UEMR] - Unintended electromagnetic radiation from space systems into RAS frequency bands
|
|
[ 244 ] Annex 5 - English - Word |
2023-10-16 [14:05]
|
116'450 bytes |
Working document towards preliminary draft new Report ITU-R RA.[RECEIVER-RESILIENCE] - Resilience of Radio Astronomy Receivers
|
|
[ 244 ] Annex 4 - English - Word |
2023-10-16 [11:59]
|
332'748 bytes |
Working document towards a preliminary draft new Report ITU-R RA.[SZM] - Radio astronomy facilities on the Moon
|
|
[ 244 ] Annex 1 - English - Word |
2023-10-16 [11:43]
|
40'616 bytes |
Working document towards a preliminary draft new Report ITU-R RA.[RAS 6-7 GHZ] - RAS in the band 6-7 GHz
|
|
[ 244 ] Annex 3 - English - Word |
2023-10-16 [08:58]
|
31'078 bytes |
Working document towards a preliminary draft new ITU-R Report: sharing above 71 GHz in response to Resolution 731 (Rev.WRC-19)
|
|
[ 244 ] Annex 2 - English - Word |
2023-10-13 [16:24]
|
31'736 bytes |
Elements for use in studies between the radio astronomy service (RAS) and active services above 71 GHz, and meta-analysis of the studies
|
|
[ 243 ]
|
2023-10-11 |
Director, BR
|
Final List of Participants - Working Party 7D (Geneva, 5-11 October 2023)
|
N/A
|
|
[ 243 ] - English - PDF (acrobat) |
2023-10-11 [16:26]
|
133'776 bytes |
|
|
[ ADM 18 ]
|
2023-10-06 |
Chairpersons, WPs 7B, 7C&7D
|
Draft agenda for the joint session of Working Parties 7B, 7C and 7D - Monday, 9 October 2023, at 1400 hours (Montbrillant Building, Room K)
|
N/A
|
|
[ ADM 18 ] - English - Word |
2023-10-06 [17:30]
|
43'970 bytes |
|
|
[ ADM 15 ]
|
2023-09-26 |
SG 7, WPs 7B, 7C & 7D
|
Draft schedule of the meetings of Working Parties 7B, 7C and 7D, joint sessions between WPs 7B, 7C and 7D and meeting of Study Group 7 (3 - 12 October 2023)
|
N/A
|
|
[ ADM 15 ] Revision 2 - English - Word |
2023-10-05 [09:28]
|
46'435 bytes |
|
|
[ ADM 16 ]
|
2023-10-04 |
WP 7D
|
Working Party 7D Working Groups, attribution of documents and schedule (5-11 October 2023)
|
N/A
|
|
[ ADM 16 ] Revision 1 - English - Word |
2023-10-05 [09:08]
|
36'555 bytes |
|
|
[ ADM 17 ]
|
2023-10-04 |
Chair, WP 7D
|
Agenda for the first plenary meeting of Working Party 7D - Thursday, 5th October 2023 at 1045 hours (Room L, Montbrillant)
|
N/A
|
|
[ ADM 17 ] - English - Word |
2023-10-04 [17:23]
|
33'506 bytes |
|
|
[ 242 ]
|
2023-10-04 |
BR, Study Groups Department
|
List of documents issued (Documents 7D/204 - 7D/242)
|
N/A
|
|
[ 242 ] - English - Word |
2023-10-04 [15:43]
|
40'431 bytes |
|
|
[ 241 ]
|
2023-09-28 |
United States of America
|
Updates to working document toward a preliminary draft new Report ITU-R RA.[HARMONICS] - Unwanted emissions created by harmonics in radio astronomy bands: measurement of impacts of harmonic emission at radio facilities
|
Q145-3/7
|
|
[ 241 ] - English - Word |
2023-09-29 [10:07]
|
1'334'235 bytes |
|
|
[ 234 ]
|
2023-09-28 |
Square Kilometre Array Observatory (SKAO)
, Committee on Radio Astronomy Frequencies
|
Proposed new working document towards a preliminary draft new Report ITU-R RA.[UEMR]
|
Q129-3/7
|
|
[ 234 ] - English - Word |
2023-09-28 [14:39]
|
6'753'916 bytes |
|
|
[ 227 ]
|
2023-09-21 |
Scientific Committee on Frequency Allocations for Radio Astronomy and Space Science
|
Working document toward a preliminary draft new Report ITU-R RA.[LUNAR RADIO ASTRONOMY] - Lunar Radio Astronomy
|
Q260/7
|
|
[ 227 ] - English - Word |
2023-09-21 [17:03]
|
35'433 bytes |
|
|
[ 237 ]
|
2023-09-28 |
Director, BR
|
Protection of the radio astronomy stations in the shielded zone of the Moon
|
N/A
|
|
[ 237 ] - English - Word |
2023-09-29 [08:48]
|
63'142 bytes |
|
|
[ 235 ]
|
2023-09-28 |
Germany (Federal Republic of)
|
Draft revision of Report ITU-R RA.2188-1 - Power flux-density and e.i.r.p. levels potentially damaging to radio astronomy receivers
|
N/A
|
|
[ 235 ] - English - Word |
2023-09-28 [15:13]
|
52'920 bytes |
|
|
[ 233 ]
|
2023-09-27 |
Committee on Radio Astronomy Frequencies
, Square Kilometre Array Observatory
|
Working document towards a preliminary draft new Report ITU-R RA.[RECEIVER-RESILIENCE] - Resilience of radio astronomy receivers
|
N/A
|
|
[ 233 ] - English - Word |
2023-09-28 [10:51]
|
109'642 bytes |
|
|
[ 231 ]
|
2023-09-26 |
WP 5A
|
Reply liaison statement to Working Party 1A (copy to Working Parties 4A, 5C, 5D, 7C and 7D for information) - Beam Wireless Power Transmission (WPT) operating in the frequency band 24.1-24.15 GHz
|
N/A
|
|
[ 231 ] - English - Word |
2023-09-26 [11:39]
|
35'301 bytes |
|
|
[ 240 ]
|
2023-09-28 |
United States of America
|
Updates to working document towards a preliminary draft new Report ITU-R RA.[RAS-IMT-COMPAT-43-GHZ] - Possible coordination and protection measures for stations of the radio astronomy service operating in the 42.5-43.5 GHz allocation and IMT systems operating in the 37-43.5 GHz mobile service allocation
|
N/A
|
|
[ 240 ] - English - Word |
2023-09-29 [09:46]
|
9'519'379 bytes |
|
|
[ 239 ]
|
2023-09-28 |
United States of America
|
Updates to preliminary draft revision of Recommendation ITU-R RA.314-10 - Preferred frequency bands for radio astronomical measurements
|
N/A
|
|
[ 239 ] - English - Word |
2023-09-29 [09:19]
|
2'592'844 bytes |
|
|
[ 238 ]
|
2023-09-28 |
United States of America
|
Working document towards a preliminary draft new Report ITU-R RA.[SZM] - Radio astronomy facilities on the Moon
|
N/A
|
|
[ 238 ] - English - Word |
2023-09-29 [09:02]
|
328'101 bytes |
|
|
[ 236 ]
|
2023-09-28 |
Germany (Federal Republic of)
, Norway
, Spain
|
Proposal towards a new Recommendation ITU-R RA.[GEOVLBI] - Protection of global Geodetic Very Long Baseline Interferometry networks
|
N/A
|
|
[ 236 ] - English - Word |
2023-09-28 [16:44]
|
41'142 bytes |
|
|
[ 232 ]
|
2023-09-27 |
Committee on Radio Astronomy Frequencies
|
Addition to draft revision of Recommendation ITU-R RA.314-10
|
N/A
|
|
[ 232 ] - English - Word |
2023-09-28 [10:38]
|
226'359 bytes |
|
|
[ 230 ]
|
2023-09-25 |
Square Kilometre Array Observatory
|
Proposed study for inclusion to the working document toward a preliminary draft new Report ITU-R RA.[HARMONICS]
|
N/A
|
|
[ 230 ] Part 1 - English - Word |
2023-09-25 [16:28]
|
2'303'643 bytes |
|
|
[ 230 ] - English - Word |
2023-09-25 [15:28]
|
2'275'476 bytes |
|
|
[ 229 ]
|
2023-09-21 |
Scientific Committee on Frequency Allocations for Radio Astronomy and Space Science
|
Working document toward a preliminary draft new Recommendation ITU-R RA.[PASSIVE BAND PROTECTION] - Protection of the radio astronomy service operating in frequency bands subject to RR No. 5.340
|
N/A
|
|
[ 229 ] - English - Word |
2023-09-21 [17:06]
|
36'681 bytes |
|
|
[ 228 ]
|
2023-09-21 |
Scientific Committee on Frequency Allocations for Radio Astronomy and Space Science
|
Working document toward a preliminary draft revision of Recommendation ITU-R RA.1513 - Levels of data loss to radio astronomy observations and percentage of time criteria resulting from degradation by interference for frequency bands allocated to the radio astronomy service on a primary basis and shared with active services
|
N/A
|
|
[ 228 ] - English - Word |
2023-09-21 [17:00]
|
122'120 bytes |
|
|
[ 226 ]
|
2023-09-11 |
WP 6A
|
Reply liaison statement to CISPR/H (copy for information or action to Working Parties 4A and 7D on Question 6) (copy for information to Study Group 1 and Working Parties 1A and 5A)
|
N/A
|
|
[ 226 ] - English - Word |
2023-09-11 [08:58]
|
36'814 bytes |
|
Results: 35 total items.
|
Multiple Document Download: Formats and Languages to be included (when available):