International Telecommunication Union   ITU
Français  Español
 
Site map Contact Us Print version
  Home : ITU-R : R23-WP1A Recently posted -  Search Meeting Documents
   
ITU-R R23-WP1A Meeting Documents
  Max # of documents displayed/page:
Results: 42 total items.
Number  Date Source Title
  Number  Posted Size  
 
[ TD 41 ]  2025-06-17 WG 1A-2   Working document towards a preliminary draft revision of Recommendation ITU-R SM.2151-0 - Guidance on frequency ranges for operation of wireless power transmission via radio frequency beam for mobile/portable devices and sensor networks    
  [ TD 41 ]  - English -  Word 2025-06-17 [18:52]  42'285  bytes  
 
[ ADM 21 ]  2025-06-04 Chairs, WPs 1A, 1B & 1C   Provisional schedule for the sessions of the Second 2023-2027 Meetings of Working Parties 1A and 1C and Third Meetings of Working Party 1B    
  [ ADM 21 ] Revision 7 - English -  Word 2025-06-17 [18:03]  57'415  bytes  
 
[ TD 49 ]  2025-06-17 WG 1A-3   Draft reply liaison statement to Working Party 5B (copy for information to Working Parties 1B, 4A, 4C, 5A, 5C and 5D) - The On-Tune Rejection (OTR) in Recommendation ITU-R SM.337 and Recommendation ITU-R M.1461    
  [ TD 49 ]  - English -  Word 2025-06-17 [17:49]  95'356  bytes  
 
[ TD 48 ]  2025-06-17 WG 1A-3   [Preliminary] Draft editorial revision of Recommendation ITU-R SM.337-6 - Frequency and distance separations    
  [ TD 48 ]  - English -  Word 2025-06-17 [17:49]  43'398  bytes  
 
[ TD 47 ]  2025-06-17 WG 1A-3   Draft reply liaison statement to the Coordination Committee for Terminology (CCT) (copy to ITU-R Study Group 3 and ITU-T Study Group 5) - Definitions of the terms from ITU-T Study Group 5    
  [ TD 47 ]  - English -  Word 2025-06-17 [17:43]  43'549  bytes  
 
[ TD 46 ]  2025-06-17 WG 1A-3   Working document towards a preliminary draft new Report ITU-R SM.[UWB.EVOLUTION] - Evolution of devices using ultra-wideband (UWB) technologies    
  [ TD 46 ]  - English -  Word 2025-06-17 [17:44]  1'741'557  bytes  
 
[ TD 40 ]  2025-06-17 WG 1A-2   Working document towards a preliminary draft revision of Report ITU-R SM.2451-1 - Assessment of impact on radiocommunication services from wireless power transmission for electric vehicle operating below 30 MHz    
  [ TD 40 ]  - English -  Word 2025-06-17 [17:21]  45'490'309  bytes  
 
[ TD 39 ]  2025-06-17 WG 1A-2   [Draft] Reply liaison statement to Working Party 7D (copy to Working Parties 4C, 5A, 5D and 7C for information) - Beam Wireless Power Transmission (WPT)    
  [ TD 39 ]  - English -  Word 2025-06-17 [16:27]  35'553  bytes  
 
[ TD 38 ]  2025-06-17 WG 1A-2   [Draft] Reply liaison statement to Working Party 7C - Beam wireless power transmission (WPT)    
  [ TD 38 ]  - English -  Word 2025-06-17 [16:24]  32'971  bytes  
 
[ TD 37 ]  2025-06-17 WG 1A-2   Draft reply liaison statement to Working Party 4C - Beam-Wireless Power Transmission (WPT)    
  [ TD 37 ]  - English -  Word 2025-06-17 [16:20]  33'230  bytes  
 
[ ADM 39 ]  2025-06-17 Chair, WG 1A-1   Draft agenda for the fifth meeting of Working Group 1A-1 (EMC related interference and coexistence of wired telecommunications systems with radiocommunication systems, including Power Line Telecommunication (PLT) systems and related issues) - Tuesday, 17 June 2025, at 1540 hours (Geneva time) (Room L, Montbrillant)    
  [ ADM 39 ]  - English -  Word 2025-06-17 [14:51]  41'678  bytes  
 
[ TD 45 ]  2025-06-17 WG 1A-1 (EMC/EMI)   Draft reply liaison statement to Working Party 7D on unwanted electromagnetic radiation (UEMR) and Question ITU-R 243/1    
  [ TD 45 ]  - English -  Word 2025-06-17 [14:00]  47'688  bytes  
 
[ TD 44 ]  2025-06-17 WG 1A-1   Draft reply liaison statement to the ITU Coordination Committee for Terminology (CCT) and ITU-T Study Group 5 - Request of feedback on terms and definitions proposed by ITU-T Study Group 5 and submitted to the CCT for validation    
  [ TD 44 ]  - English -  Word 2025-06-17 [12:51]  35'888  bytes  
 
[ TD 30 ]  2025-06-13 WG 1A-3   [Preliminary] draft revision of Recommendation ITU-R SM.328-11 - Spectra and bandwidth of emissions    
  [ TD 30 ] Revision 1 - English -  Word 2025-06-17 [10:44]  237'338  bytes  
 
[ ADM 31 ]  2025-06-12 Chair, WP 1A   Agenda for the second Plenary session of the second 2023-2027 meeting of Working Party 1A - Tuesday, 17 June 2025, at 1040 hours (Geneva time) (Room K, Montbrillant)    
  [ ADM 31 ] Revision 2 - English -  Word 2025-06-17 [10:43]  39'805  bytes  
 
[ TD 35 ]  2025-06-17 Chair, WP 1A   [Draft] note to the Chair of Working Party 1B - UWB abbreviation and definition for addition to the ITU Terms and Definitions database    
  [ TD 35 ] Revision 1 - English -  Word 2025-06-17 [09:41]  36'002  bytes  
 
[ ADM 37 ]  2025-06-17 Chair, WG 1A-3   Draft agenda for the third and fourth sessions of Working Group 1A-3 (WRC-31 item 2.1, WRC-27 agenda items, and other issues) - Tuesday, 17 June, P1 (0900-1020 hours) (Geneva time) - Tuesday, 17 June, P2 (1040-1200) after WP 1A Plenary (Room K, Montbrillant)    
  [ ADM 37 ]  - English -  Word 2025-06-17 [08:24]  43'158  bytes  
 
[ TD 32 ]  2025-06-13 WG 1A-1   Draft reply liaison statement to the ITU Coordination Committee for Terminology (CCT) and to ITU-T Study Groups 5 and 15    
  [ TD 32 ] Revision 1 - English -  Word 2025-06-16 [15:54]  48'706  bytes  
 
[ TD 34 ]  2025-06-16 WP 1A   Liaison statement to ITU-T Study Group 15 Question 6/15 (copy to ITU-R Working Parties 3M & 5C) - Free-space optics systems related aspects for G.fso    
  [ TD 34 ]  - English -  Word 2025-06-17 [09:06]  37'765  bytes  
 
[ ADM 35 ]  2025-06-16 Chair, WG 1A-1   Draft agenda for the fourth meeting of Working Group 1A-1 (EMC related interference and coexistence of wired telecommunications systems with radiocommunication systems, including Power Line Telecommunication (PLT) systems and related issues ) - Monday, 16 June 2025, at 0900 hours (Geneva time) (Room C, ITU Tower)    
  [ ADM 35 ]  - English -  Word 2025-06-16 [08:50]  40'939  bytes  
 
[ ADM 34 ]  2025-06-13 Chair, WG 1A-2   Draft agenda for the fifth and sixth meeting of Working Group 1A-2 - Wireless power transmission (WPT) and related issues - Monday, 16 June 2025, at 1400 and 1540 hours (Geneva time) - (Room K, Montbrillant)    
  [ ADM 34 ] Revision 1 - English -  Word 2025-06-16 [12:03]  40'543  bytes  
 
[ ADM 36 ]  2025-06-16 Chair, WG 1A-2   Draft agenda for the 7th meeting of Working Group 1A-2 - Wireless power transmission (WPT) and related issues - Tuesday, 17 June 2025, at 1400 hours (Geneva time) (Room L, Montbrillant)    
  [ ADM 36 ]  - English -  Word 2025-06-17 [08:18]  35'504  bytes  
 
[ ADM 23 ]  2025-06-04 Chair, WP 1A   Structure of sub-Groups and assignment of input documents for the second 2023-2027 Meeting of Working Party 1A (Geneva, 11-18 June 2025)    
  [ ADM 23 ] Revision 2 - English -  Word 2025-06-16 [08:30]  54'040  bytes  
 
[ TD 33 ]  2025-06-13 WG 1A-1   Working document towards a preliminary draft revision of Report ITU-R SM.2422-2 - Visible light for broadband communications    
  [ TD 33 ] Revision 1 - English -  Word 2025-06-16 [08:25]  6'788'992  bytes  
 
[ 102 ]  2025-06-13 Chair, WP 1B   Note to the Chair of Working Party 1A - UWB abbreviation and definition for addition to the ITU Terms and Definitions database    
  [ 102 ]  - English -  Word 2025-06-17 [09:13]  35'364  bytes  
 
[ ADM 33 ]  2025-06-13 Chair, WG 1A-1   Draft agenda for the third meeting of Working Group 1A-1 (EMC related interference and coexistence of wired telecommunications systems with radiocommunication systems, including Power Line Telecommunication (PLT) systems and related issues ) - Friday, 13 June 2025, at 1610 hours (Geneva time) (Room L, Montbrillant)    
  [ ADM 33 ] Revision 1 - English -  Word 2025-06-13 [15:03]  43'541  bytes  
 
[ TD 29 ]  2025-06-12 WG 1A-2   Preliminary draft revision of Report ITU-R SM.2392-1 - Applications of wireless power transmission via radio frequency beam    
  [ TD 29 ] Revision 1 - English -  Word 2025-06-13 [13:02]  11'280'346  bytes  
 
[ TD 31 ]  2025-06-13 WG 1A-3   For information only: [Working document towards a preliminary draft new Report ITU-R SM.[ACTIVE SERVICES BETWEEN 275 AND 450 GHZ] - Technical and operational characteristics of active services in the frequency range between 275 and 450 GHz    
  [ TD 31 ]  - English -  Word 2025-06-13 [12:05]  2'649'556  bytes  
 
[ ADM 32 ]  2025-06-13 Chair, WG 1A-3   Draft agenda for the second session of Working Group 1A-3 (WRC-31 item 2.1, WRC-27 agenda items, and other issues) - Friday, 13 June 2025, P3 (1430-1550 hours) (Geneva time) (Room C, ITU Tower)    
  [ ADM 32 ]  - English -  Word 2025-06-13 [11:55]  42'522  bytes  
 
[ ADM 29 ]  2025-06-12 Chair, WG 1A-2   Draft agenda for the 4 th meeting of Working Group 1A-2 - Wireless power transmission (WPT) and related issues - Friday , 13 June 2025 at 1040 hours (Geneva time) (Room C, ITU Tower)    
  [ ADM 29 ]  - English -  Word 2025-06-12 [18:44]  38'621  bytes  
 
[ ADM 30 ]  2025-06-12 Chair, WG 1A-1   Draft agenda for the second meeting of Working Group 1A-1 (EMC related interference and coexistence of wired telecommunications systems with radiocommunication systems, including Power Line Telecommunication (PLT) systems and related issues) - Friday, 13 June 2025, at 0900 hours (Geneva time) (Room C, ITU Tower)    
  [ ADM 30 ]  - English -  Word 2025-06-12 [16:14]  41'719  bytes  
 
[ ADM 24 ]  2025-06-11 Chair, WG 1A-1   Draft agenda for the initial meetings of Working Group 1A-1 (EMC related interference and coexistence of wired telecommunications systems with radiocommunication systems, including Power Line Telecommunication (PLT) systems and related issues) - Wednesday, 11 June 2025, following WP 1A Plenary at 1040 hours (Geneva time) (Room C, Tower)    
  [ ADM 24 ]  - English -  Word 2025-06-11 [08:36]  39'613  bytes  
 
[ ADM 26 ]  2025-06-11 Chair, WG 1A-2   Draft agenda for the 2nd meeting of Working Group 1A-2 - Wireless power transmission (WPT) and related issues - Thursday , 12 June 2025 at 1400 hours (Geneva time) (Room C, ITU Tower)    
  [ ADM 26 ] Revision 1 - English -  Word 2025-06-12 [10:00]  39'505  bytes  
 
[ ADM 28 ]  2025-06-12 Chair, WG 1A-2   Draft agenda for the third meeting of Working Group 1A-2 - Wireless power transmission (WPT) and related issues - Thursday, 12 June 2025 at 1540 hours (Geneva time) (Room C, ITU Tower)    
  [ ADM 28 ] Revision 1 - English -  Word 2025-06-12 [09:59]  38'008  bytes  
 
[ ADM 27 ]  2025-06-12 Acting Chair, WG 1A-3   Draft agenda for the first session of Working Group 1A-3 (WRC-31 item 2.1, WRC-27 agenda items, and other issues) Thursday, 12 June P1, (0900-1020 hours) (Geneva time) (Room C, ITU Tower)    
  [ ADM 27 ]  - English -  Word 2025-06-12 [08:24]  40'897  bytes  
 
[ ADM 25 ]  2025-06-11 Chair, WG 1A-2   Draft agenda for the 1st meeting of Working Group 1A-2 - Wireless power transmission (WPT) and related issues - Wednesday, 11 June 2025 at 1540 hours (Geneva time) (Room H, Montbrillant)    
  [ ADM 25 ]  - English -  Word 2025-06-11 [09:57]  39'822  bytes  
 
[ 64 ]  2025-02-21 ITU-T SG2   Liaison statement on request for input on Quality of Service (QoS) and Electromagnetic Fields (EMF) in the context of indoor coverage technologies    
  [ 64 ] Revision 1 - English -  Word 2025-06-11 [17:45]  39'158  bytes  
 
[ ADM 20 ]  2025-06-04 Chairs, WPs 1A, 1B & 1C   Agenda for the joint meeting of Working Parties 1A, 1B and 1C - Wednesday, 11 June 2025, at 0930 hours (Geneva time) - (Room C, ITU Tower)    
  [ ADM 20 ] Revision 1 - English -  Word 2025-06-11 [12:30]  50'025  bytes  
 
[ ADM 22 ]  2025-06-04 Chair, WP 1A   Agenda for the opening (first) Plenary session of the second 2023-2027 meeting of Working Party 1A - Wednesday, 11 June 2025, at 1040 hours (Geneva time) - (Room C, ITU Tower)    
  [ ADM 22 ]  - English -  Word 2025-06-10 [17:40]  35'807  bytes  
 
[ 101 ]  2025-06-10 BR, Study Groups Department   List of documents issued (Documents 1A/43 - 1A/101)    
  [ 101 ]  - English -  Word 2025-06-10 [15:01]  47'291  bytes  
 
[ 100 ]  2025-06-09 WP 3M   Liaison statement to ITU-T Study Group 15 Question 6/15 (copy to ITU-R Working Parties 1A, 5C) - Free-space optics systems related aspects for G.fso    
  [ 100 ]  - English -  Word 2025-06-09 [13:39]  41'371  bytes  
 
[ 99 ]  2025-06-09 SG 1 Rapp. to CISPR on WPT issues   Report on CISPR activities from June 2024 to June 2025 on WPT issues    
  [ 99 ]  - English -  Word 2025-06-09 [09:36]  68'739  bytes  
Results: 42 total items.
 
Multiple Document Download: Check the boxes of the selected documents, then click "Zip and download"
   
 
User preferences: 
Multiple Document Download: Formats and Languages to be included (when available):
HTML Navigation Pages Yes  
Formats doc pdf zip  + Other formats
Languages (maximum 2) E F S A C R  + Multilingual 
(E: English - F: French - S: Spanish - A: Arabic - C: Chinese - R: Russian)

Top -  Feedback -  Contact Us -  Copyright © ITU 2008 All Rights Reserved
Contact for this page :  ITU-R Web coordinator
Updated : 2025-06-18