Number |
Date
|
Source
|
Title
|
|
Number |
Posted |
Size
|
|
|
[ TD 41 ]
|
2025-06-17 |
WG 1A-2
|
Working document towards a preliminary draft revision of Recommendation ITU-R SM.2151-0 - Guidance on frequency ranges for operation of wireless power transmission via radio frequency beam for mobile/portable devices and sensor networks
|
|
[ TD 41 ] - English - Word |
2025-06-17 [18:52]
|
42'285 bytes |
|
|
[ ADM 21 ]
|
2025-06-04 |
Chairs, WPs 1A, 1B & 1C
|
Provisional schedule for the sessions of the Second 2023-2027 Meetings of Working Parties 1A and 1C and Third Meetings of Working Party 1B
|
|
[ ADM 21 ] Revision 7 - English - Word |
2025-06-17 [18:03]
|
57'415 bytes |
|
|
[ TD 49 ]
|
2025-06-17 |
WG 1A-3
|
Draft reply liaison statement to Working Party 5B (copy for information to Working Parties 1B, 4A, 4C, 5A, 5C and 5D) - The On-Tune Rejection (OTR) in Recommendation ITU-R SM.337 and Recommendation ITU-R M.1461
|
|
[ TD 49 ] - English - Word |
2025-06-17 [17:49]
|
95'356 bytes |
|
|
[ TD 48 ]
|
2025-06-17 |
WG 1A-3
|
[Preliminary] Draft editorial revision of Recommendation ITU-R SM.337-6 - Frequency and distance separations
|
|
[ TD 48 ] - English - Word |
2025-06-17 [17:49]
|
43'398 bytes |
|
|
[ TD 47 ]
|
2025-06-17 |
WG 1A-3
|
Draft reply liaison statement to the Coordination Committee for Terminology (CCT) (copy to ITU-R Study Group 3 and ITU-T Study Group 5) - Definitions of the terms from ITU-T Study Group 5
|
|
[ TD 47 ] - English - Word |
2025-06-17 [17:43]
|
43'549 bytes |
|
|
[ TD 46 ]
|
2025-06-17 |
WG 1A-3
|
Working document towards a preliminary draft new Report ITU-R SM.[UWB.EVOLUTION] - Evolution of devices using ultra-wideband (UWB) technologies
|
|
[ TD 46 ] - English - Word |
2025-06-17 [17:44]
|
1'741'557 bytes |
|
|
[ TD 40 ]
|
2025-06-17 |
WG 1A-2
|
Working document towards a preliminary draft revision of Report ITU-R SM.2451-1 - Assessment of impact on radiocommunication services from wireless power transmission for electric vehicle operating below 30 MHz
|
|
[ TD 40 ] - English - Word |
2025-06-17 [17:21]
|
45'490'309 bytes |
|
|
[ TD 39 ]
|
2025-06-17 |
WG 1A-2
|
[Draft] Reply liaison statement to Working Party 7D
(copy to Working Parties 4C, 5A, 5D and 7C for information) - Beam Wireless Power Transmission (WPT)
|
|
[ TD 39 ] - English - Word |
2025-06-17 [16:27]
|
35'553 bytes |
|
|
[ TD 38 ]
|
2025-06-17 |
WG 1A-2
|
[Draft] Reply liaison statement to Working Party 7C - Beam wireless power transmission (WPT)
|
|
[ TD 38 ] - English - Word |
2025-06-17 [16:24]
|
32'971 bytes |
|
|
[ TD 37 ]
|
2025-06-17 |
WG 1A-2
|
Draft reply liaison statement to Working Party 4C - Beam-Wireless Power Transmission (WPT)
|
|
[ TD 37 ] - English - Word |
2025-06-17 [16:20]
|
33'230 bytes |
|
|
[ ADM 39 ]
|
2025-06-17 |
Chair, WG 1A-1
|
Draft agenda for the fifth meeting of Working Group 1A-1 (EMC related interference and coexistence of wired telecommunications systems with radiocommunication systems, including Power Line Telecommunication (PLT) systems and related issues) - Tuesday, 17 June 2025, at 1540 hours (Geneva time) (Room L, Montbrillant)
|
|
[ ADM 39 ] - English - Word |
2025-06-17 [14:51]
|
41'678 bytes |
|
|
[ TD 45 ]
|
2025-06-17 |
WG 1A-1 (EMC/EMI)
|
Draft reply liaison statement to Working Party 7D on unwanted electromagnetic radiation (UEMR) and Question ITU-R 243/1
|
|
[ TD 45 ] - English - Word |
2025-06-17 [14:00]
|
47'688 bytes |
|
|
[ TD 44 ]
|
2025-06-17 |
WG 1A-1
|
Draft reply liaison statement to the ITU Coordination Committee for Terminology (CCT) and ITU-T Study Group 5 - Request of feedback on terms and definitions proposed by ITU-T Study Group 5 and submitted to the CCT for validation
|
|
[ TD 44 ] - English - Word |
2025-06-17 [12:51]
|
35'888 bytes |
|
|
[ TD 30 ]
|
2025-06-13 |
WG 1A-3
|
[Preliminary] draft revision of Recommendation ITU-R SM.328-11 - Spectra and bandwidth of emissions
|
|
[ TD 30 ] Revision 1 - English - Word |
2025-06-17 [10:44]
|
237'338 bytes |
|
|
[ ADM 31 ]
|
2025-06-12 |
Chair, WP 1A
|
Agenda for the second Plenary session of the second 2023-2027 meeting of Working Party 1A - Tuesday, 17 June 2025, at 1040 hours (Geneva time) (Room K, Montbrillant)
|
|
[ ADM 31 ] Revision 2 - English - Word |
2025-06-17 [10:43]
|
39'805 bytes |
|
|
[ TD 35 ]
|
2025-06-17 |
Chair, WP 1A
|
[Draft] note to the Chair of Working Party 1B - UWB abbreviation and definition
for addition to the ITU Terms and Definitions database
|
|
[ TD 35 ] Revision 1 - English - Word |
2025-06-17 [09:41]
|
36'002 bytes |
|
|
[ ADM 37 ]
|
2025-06-17 |
Chair, WG 1A-3
|
Draft agenda for the third and fourth sessions of Working Group 1A-3 (WRC-31 item 2.1, WRC-27 agenda items, and other issues) - Tuesday, 17 June, P1 (0900-1020 hours) (Geneva time) - Tuesday, 17 June, P2 (1040-1200) after WP 1A Plenary (Room K, Montbrillant)
|
|
[ ADM 37 ] - English - Word |
2025-06-17 [08:24]
|
43'158 bytes |
|
|
[ TD 32 ]
|
2025-06-13 |
WG 1A-1
|
Draft reply liaison statement to the ITU Coordination Committee for Terminology (CCT) and to ITU-T Study Groups 5 and 15
|
|
[ TD 32 ] Revision 1 - English - Word |
2025-06-16 [15:54]
|
48'706 bytes |
|
|
[ TD 34 ]
|
2025-06-16 |
WP 1A
|
Liaison statement to ITU-T Study Group 15 Question 6/15 (copy to ITU-R Working Parties 3M & 5C) - Free-space optics systems related aspects for G.fso
|
|
[ TD 34 ] - English - Word |
2025-06-17 [09:06]
|
37'765 bytes |
|
|
[ ADM 35 ]
|
2025-06-16 |
Chair, WG 1A-1
|
Draft agenda for the fourth meeting of Working Group 1A-1 (EMC related interference and coexistence of wired telecommunications systems with radiocommunication systems, including Power Line Telecommunication (PLT) systems and related issues ) - Monday, 16 June 2025, at 0900 hours (Geneva time) (Room C, ITU Tower)
|
|
[ ADM 35 ] - English - Word |
2025-06-16 [08:50]
|
40'939 bytes |
|
|
[ ADM 34 ]
|
2025-06-13 |
Chair, WG 1A-2
|
Draft agenda for the fifth and sixth meeting of Working Group 1A-2 - Wireless power transmission (WPT) and related issues - Monday, 16 June 2025, at 1400 and 1540 hours (Geneva time) - (Room K, Montbrillant)
|
|
[ ADM 34 ] Revision 1 - English - Word |
2025-06-16 [12:03]
|
40'543 bytes |
|
|
[ ADM 36 ]
|
2025-06-16 |
Chair, WG 1A-2
|
Draft agenda for the 7th meeting of Working Group 1A-2 - Wireless power transmission (WPT) and related issues - Tuesday, 17 June 2025, at 1400 hours (Geneva time) (Room L, Montbrillant)
|
|
[ ADM 36 ] - English - Word |
2025-06-17 [08:18]
|
35'504 bytes |
|
|
[ ADM 23 ]
|
2025-06-04 |
Chair, WP 1A
|
Structure of sub-Groups and assignment of input documents for the second 2023-2027 Meeting of Working Party 1A (Geneva, 11-18 June 2025)
|
|
[ ADM 23 ] Revision 2 - English - Word |
2025-06-16 [08:30]
|
54'040 bytes |
|
|
[ TD 33 ]
|
2025-06-13 |
WG 1A-1
|
Working document towards a preliminary draft revision of Report ITU-R SM.2422-2 - Visible light for broadband communications
|
|
[ TD 33 ] Revision 1 - English - Word |
2025-06-16 [08:25]
|
6'788'992 bytes |
|
|
[ 102 ]
|
2025-06-13 |
Chair, WP 1B
|
Note to the Chair of Working Party 1A - UWB abbreviation and definition for addition to the ITU Terms and Definitions database
|
|
[ 102 ] - English - Word |
2025-06-17 [09:13]
|
35'364 bytes |
|
|
[ ADM 33 ]
|
2025-06-13 |
Chair, WG 1A-1
|
Draft agenda for the third meeting of Working Group 1A-1 (EMC related interference and coexistence of wired telecommunications systems with radiocommunication systems, including Power Line Telecommunication (PLT) systems and related issues ) - Friday, 13 June 2025, at 1610 hours (Geneva time) (Room L, Montbrillant)
|
|
[ ADM 33 ] Revision 1 - English - Word |
2025-06-13 [15:03]
|
43'541 bytes |
|
|
[ TD 29 ]
|
2025-06-12 |
WG 1A-2
|
Preliminary draft revision of Report ITU-R SM.2392-1 - Applications of wireless power transmission via radio frequency beam
|
|
[ TD 29 ] Revision 1 - English - Word |
2025-06-13 [13:02]
|
11'280'346 bytes |
|
|
[ TD 31 ]
|
2025-06-13 |
WG 1A-3
|
For information only: [Working document towards a preliminary draft new Report ITU-R SM.[ACTIVE SERVICES BETWEEN 275 AND 450 GHZ] - Technical and operational characteristics of active services in the frequency range between 275 and 450 GHz
|
|
[ TD 31 ] - English - Word |
2025-06-13 [12:05]
|
2'649'556 bytes |
|
|
[ ADM 32 ]
|
2025-06-13 |
Chair, WG 1A-3
|
Draft agenda for the second session of Working Group 1A-3 (WRC-31 item 2.1, WRC-27 agenda items, and other issues) - Friday, 13 June 2025, P3 (1430-1550 hours) (Geneva time) (Room C, ITU Tower)
|
|
[ ADM 32 ] - English - Word |
2025-06-13 [11:55]
|
42'522 bytes |
|
|
[ ADM 29 ]
|
2025-06-12 |
Chair, WG 1A-2
|
Draft agenda for the 4 th meeting of Working Group 1A-2 - Wireless power transmission (WPT) and related issues - Friday , 13 June 2025 at 1040 hours (Geneva time) (Room C, ITU Tower)
|
|
[ ADM 29 ] - English - Word |
2025-06-12 [18:44]
|
38'621 bytes |
|
|
[ ADM 30 ]
|
2025-06-12 |
Chair, WG 1A-1
|
Draft agenda for the second meeting of Working Group 1A-1 (EMC related interference and coexistence of wired telecommunications systems with radiocommunication systems, including Power Line Telecommunication (PLT) systems and related issues) - Friday, 13 June 2025, at 0900 hours (Geneva time) (Room C, ITU Tower)
|
|
[ ADM 30 ] - English - Word |
2025-06-12 [16:14]
|
41'719 bytes |
|
|
[ ADM 24 ]
|
2025-06-11 |
Chair, WG 1A-1
|
Draft agenda for the initial meetings of Working Group 1A-1 (EMC related interference and coexistence of wired telecommunications systems with radiocommunication systems, including Power Line Telecommunication (PLT) systems and related issues) - Wednesday, 11 June 2025, following WP 1A Plenary at 1040 hours (Geneva time) (Room C, Tower)
|
|
[ ADM 24 ] - English - Word |
2025-06-11 [08:36]
|
39'613 bytes |
|
|
[ ADM 26 ]
|
2025-06-11 |
Chair, WG 1A-2
|
Draft agenda for the 2nd meeting of Working Group 1A-2 - Wireless power transmission (WPT) and related issues - Thursday , 12 June 2025 at 1400 hours (Geneva time) (Room C, ITU Tower)
|
|
[ ADM 26 ] Revision 1 - English - Word |
2025-06-12 [10:00]
|
39'505 bytes |
|
|
[ ADM 28 ]
|
2025-06-12 |
Chair, WG 1A-2
|
Draft agenda for the third meeting of Working Group 1A-2 - Wireless power transmission (WPT) and related issues - Thursday, 12 June 2025 at 1540 hours (Geneva time) (Room C, ITU Tower)
|
|
[ ADM 28 ] Revision 1 - English - Word |
2025-06-12 [09:59]
|
38'008 bytes |
|
|
[ ADM 27 ]
|
2025-06-12 |
Acting Chair, WG 1A-3
|
Draft agenda for the first session of Working Group 1A-3 (WRC-31 item 2.1, WRC-27 agenda items, and other issues) Thursday, 12 June P1, (0900-1020 hours) (Geneva time) (Room C, ITU Tower)
|
|
[ ADM 27 ] - English - Word |
2025-06-12 [08:24]
|
40'897 bytes |
|
|
[ ADM 25 ]
|
2025-06-11 |
Chair, WG 1A-2
|
Draft agenda for the 1st meeting of Working Group 1A-2 - Wireless power transmission (WPT) and related issues - Wednesday, 11 June 2025 at 1540 hours (Geneva time) (Room H, Montbrillant)
|
|
[ ADM 25 ] - English - Word |
2025-06-11 [09:57]
|
39'822 bytes |
|
|
[ 64 ]
|
2025-02-21 |
ITU-T SG2
|
Liaison statement on request for input on Quality of Service (QoS) and Electromagnetic Fields (EMF) in the context of indoor coverage technologies
|
|
[ 64 ] Revision 1 - English - Word |
2025-06-11 [17:45]
|
39'158 bytes |
|
|
[ ADM 20 ]
|
2025-06-04 |
Chairs, WPs 1A, 1B & 1C
|
Agenda for the joint meeting of Working Parties 1A, 1B and 1C - Wednesday, 11 June 2025, at 0930 hours (Geneva time) - (Room C, ITU Tower)
|
|
[ ADM 20 ] Revision 1 - English - Word |
2025-06-11 [12:30]
|
50'025 bytes |
|
|
[ ADM 22 ]
|
2025-06-04 |
Chair, WP 1A
|
Agenda for the opening (first) Plenary session of the second 2023-2027 meeting of Working Party 1A - Wednesday, 11 June 2025, at 1040 hours (Geneva time) - (Room C, ITU Tower)
|
|
[ ADM 22 ] - English - Word |
2025-06-10 [17:40]
|
35'807 bytes |
|
|
[ 101 ]
|
2025-06-10 |
BR, Study Groups Department
|
List of documents issued (Documents 1A/43 - 1A/101)
|
|
[ 101 ] - English - Word |
2025-06-10 [15:01]
|
47'291 bytes |
|
|
[ 100 ]
|
2025-06-09 |
WP 3M
|
Liaison statement to ITU-T Study Group 15 Question 6/15 (copy to ITU-R Working Parties 1A, 5C) - Free-space optics systems related aspects for G.fso
|
|
[ 100 ] - English - Word |
2025-06-09 [13:39]
|
41'371 bytes |
|
|
[ 99 ]
|
2025-06-09 |
SG 1 Rapp. to CISPR on WPT issues
|
Report on CISPR activities from June 2024 to June 2025 on WPT issues
|
|
[ 99 ] - English - Word |
2025-06-09 [09:36]
|
68'739 bytes |
|
Results: 42 total items.
|
Multiple Document Download: Formats and Languages to be included (when available):