International Telecommunication Union   ITU
Français  Español
 
Site map Contact Us Print version
  Home : ITU-R : R23-WP1B : Meeting 2025-06-11 : Temporary Documents  Recently posted -  Search Meeting Documents
   
ITU-R R23-WP1B  TD (2025-06-11) 

ITU-R R23-WP1B

Spectrum Management Methodologies and Economic Strategies

Meeting  from 2025-06-11 to 2025-06-18

held in Switzerland [Geneva]

Results:15 total items.
Temporary Documents  Documents / Contributions
 
Number 
Title Source Date
[ 35 ]  
 
Report of the meeting of Working Group 1B-2     Chair, WG 1B-2   2025-06-17
[ 34 ]  
 
Working document towards a preliminary draft revision of Report ITU-R SM.2404-0 - Regulatory tools to support enhanced shared use of the spectrum     WG 1B-2   2025-06-16
[ 33 ]  
 
Preliminary draft revision of Report ITU-R SM.2353-0 - Challenges and opportunities for spectrum management resulting from the transition to digital terrestrial television in the UHF bands     WG 1B-2   2025-06-16
[ 32 ]  
 
Reply liaison statement to ITU-T Study Group 3 (copy to ITU-R Study Groups 1 and 4, and to ITU-R Working Parties 4A, 4C and 1C for information) - Creation of new work item on economic and policy aspects of the provision of high-speed Internet connectivity by retail satellite operators     WG 1B-2   2025-06-16
[ 31 ]  
 
[Draft] Reply liaison statement to ITU-D Study Group 1 Question 4/1     WG 1B-2   2025-06-16
[ 30 ]  
 
[Draft] Liaison statement to ITU-R Working Party 5D (copy to ITU-D Study Group 1 Q4/1 for information) - Update on Report ITU-R SM.2404     WG 1B-2   2025-06-16
[ 29 ]  
(Rev.1) 
Report of the Working Group 1B-1     Chair, WG 1B-1   2025-06-16
[ 28 ]  
 
[Preliminary] draft revision of Report ITU-R SM.2012-6 - Economic aspects of spectrum management     WG 1B-2   2025-06-13
[ 27 ]  
 
[Draft] reply liaison statement to Working Party 5A - Working document towards a preliminary draft new Report ITU-R M.[AUDIO-PMSE_LMS]     WP 1B   2025-06-13
[ 26 ]  
 
[Working document towards a] preliminary draft new Report ITU-R SM.[GPR/WPR FREQ] - Spectrum management framework for the introduction of Ground- and Wall-Penetrating Radar (GPR/WPR) imaging systems     WG 1B-1   2025-06-13
[ 25 ]  
(Rev.1) 
Note to Working Party 1A on UWB abbreviation and definition for addition to the ITU Terms and Definitions database     WP 1B   2025-06-12
[ 24 ]  
 
Preliminary draft revision of Report ITU-R SM.2153-9 - Technical and operating parameters and spectrum use for short range radiocommunication devices     WG 1B-1   2025-06-12
[ 23 ]  
 
Working document towards a preliminary draft revision of Recommendation ITU-R SM.1896-1 - Frequency ranges for global or regional harmonization of short-range devices     WG 1B-1   2025-06-12
[ 22 ]  
(Rev.1) 
Preliminary draft new Report ITU-R SM.[SPEC-AVAILABILITY] - Methodologies for assessing or predicting spectrum availability     WG 1B-2   2025-06-12
[ 21 ]  
(Rev.1) 
Draft reply liaison statement to the Coordination Committee for Terminology (CCT) (copy to ITU-T Study Groups 11, 17 and 20) - UWB definition for addition to the ITU Terms and Definitions database     WP 1B   2025-06-12
Results:15 total items.
 
Multiple Document Download: Check the boxes of the selected documents, then click "Zip and download"
   
 
User preferences: 
Multiple Document Download: Formats and Languages to be included (when available):
HTML Navigation Pages  
Formats  + Other formats
Languages (maximum 2)  + Multilingual 
(E: English - F: French - S: Spanish - A: Arabic - C: Chinese - R: Russian)

Top -  Feedback -  Contact Us -  Copyright © ITU 2008 All Rights Reserved
Contact for this page :  ITU-R Web coordinator
Updated : 2025-06-17