International Telecommunication Union   ITU
Français  Español
 
Site map Contact Us Print version
  Home : ITU-R : R23-WP1B Recently posted -  Search Meeting Documents
   
ITU-R R23-WP1B Meeting Documents
  Max # of documents displayed/page:
Results: 52 total items.
Result Page:  1 - 2  - Next
Number  Date Source Title Questions 
  Number  Posted Size    
 
[ 78 ]  2025-06-18 Director, BR   Final list of participants - Working Party 1B (Geneva, 11-18 June 2025)     N/A  
  [ 78 ]  - English -  PDF (acrobat) 2025-06-18 [09:28]  142'144  bytes  
 
[ 76 ]  2025-06-10 BR, Study Groups Department   List of documents issued (Documents 1B/48 - 1B/76)     N/A  
  [ 76 ] Revision 1 - English -  Word 2025-06-18 [09:12]  41'755  bytes  
  [ 76 ]  - English -  Word 2025-06-10 [15:04]  43'629  bytes  
 
[ ADM 24 ]  2025-06-04 Chairs, WPs 1A, 1B & 1C   Provisional schedule for the sessions of the Second 2023-2027 Meetings of Working Parties 1A and 1C and Third Meetings of Working Party 1B     N/A  
  [ ADM 24 ] Revision 7 - English -  Word 2025-06-17 [18:04]  57'415  bytes  
 
[ ADM 34 ]  2025-06-16 Chair, WP 1B   Agenda for the third (final) Plenary session of the third 2023-2027 meeting of Working Party 1B - Tuesday, 17 June 2025, at 1400 hours, and, if necessary, at 1540 hours (Geneva time) - (Room K, Montbrillant)     N/A  
  [ ADM 34 ]  - English -  Word 2025-06-17 [12:13]  40'063  bytes  
 
[ 77 ]  2025-06-17 Chair, WP 1A   Note to the Chair of Working Party 1B - UWB abbreviation and definition for addition to the ITU Terms and Definitions database     N/A  
  [ 77 ]  - English -  Word 2025-06-17 [11:37]  35'637  bytes  
 
[ TD 29 ]  2025-06-16 Chair, WG 1B-1   Report of the Working Group 1B-1     N/A  
  [ TD 29 ] Revision 1 - English -  Word 2025-06-17 [08:51]  41'623  bytes  
 
[ TD 35 ]  2025-06-17 Chair, WG 1B-2   Report of the meeting of Working Group 1B-2     N/A  
  [ TD 35 ]  - English -  Word 2025-06-17 [09:09]  40'467  bytes  
 
[ TD 22 ]  2025-06-12 WG 1B-2   Preliminary draft new Report ITU-R SM.[SPEC-AVAILABILITY] - Methodologies for assessing or predicting spectrum availability     N/A  
  [ TD 22 ] Revision 1 - English -  Word 2025-06-16 [13:38]  1'434'901  bytes  
 
[ TD 33 ]  2025-06-16 WG 1B-2   Preliminary draft revision of Report ITU-R SM.2353-0 - Challenges and opportunities for spectrum management resulting from the transition to digital terrestrial television in the UHF bands     N/A  
  [ TD 33 ]  - English -  Word 2025-06-16 [13:40]  1'224'479  bytes  
 
[ TD 34 ]  2025-06-16 WG 1B-2   Working document towards a preliminary draft revision of Report ITU-R SM.2404-0 - Regulatory tools to support enhanced shared use of the spectrum     N/A  
  [ TD 34 ]  - English -  Word 2025-06-16 [13:28]  678'958  bytes  
 
[ TD 32 ]  2025-06-16 WG 1B-2   Reply liaison statement to ITU-T Study Group 3 (copy to ITU-R Study Groups 1 and 4, and to ITU-R Working Parties 4A, 4C and 1C for information) - Creation of new work item on economic and policy aspects of the provision of high-speed Internet connectivity by retail satellite operators     N/A  
  [ TD 32 ]  - English -  Word 2025-06-16 [13:31]  33'644  bytes  
 
[ TD 31 ]  2025-06-16 WG 1B-2   [Draft] Reply liaison statement to ITU-D Study Group 1 Question 4/1     N/A  
  [ TD 31 ]  - English -  Word 2025-06-16 [13:31]  35'627  bytes  
 
[ TD 30 ]  2025-06-16 WG 1B-2   [Draft] Liaison statement to ITU-R Working Party 5D (copy to ITU-D Study Group 1 Q4/1 for information) - Update on Report ITU-R SM.2404     N/A  
  [ TD 30 ]  - English -  Word 2025-06-16 [13:31]  32'492  bytes  
 
[ ADM 33 ]  2025-06-16 Chair, WG 1B-2   Draft agenda of the second meeting of Working Group 1B-2 - Monday, 16 June 2025, from 900 to 1020 hours (Geneva time) (Room L, Montbrillant)     N/A  
  [ ADM 33 ]  - English -  Word 2025-06-16 [08:37]  39'885  bytes  
 
[ ADM 31 ]  2025-06-12 Chair, WP 1B   Agenda for the second Plenary session of the third 2023-2027 meeting of Working Party 1B - Friday, 13 June 2025, at 1610 hours (Geneva time) - (Room C, ITU Tower)     N/A  
  [ ADM 31 ] Revision 1 - English -  Word 2025-06-13 [19:30]  38'460  bytes  
 
[ TD 28 ]  2025-06-13 WG 1B-2   [Preliminary] draft revision of Report ITU-R SM.2012-6 - Economic aspects of spectrum management     N/A  
  [ TD 28 ]  - English -  Word 2025-06-13 [16:16]  1'403'955  bytes  
 
[ TD 27 ]  2025-06-13 WP 1B   [Draft] reply liaison statement to Working Party 5A - Working document towards a preliminary draft new Report ITU-R M.[AUDIO-PMSE_LMS]     N/A  
  [ TD 27 ]  - English -  Word 2025-06-13 [16:20]  33'350  bytes  
 
[ ADM 32 ]  2025-06-13 Chair, WG 1B-2   Draft agenda of the second meeting of Working Group 1B-2 - Friday, 13 June 2025, from 1040 to 1200 hours (Geneva time) (Period 2) and from 1430 to 1550 hours (Geneva time) (Period 3) (Room L, Montbrillant)     N/A  
  [ ADM 32 ] Revision 1 - English -  Word 2025-06-13 [12:39]  38'055  bytes  
 
[ TD 25 ]  2025-06-12 WP 1B   Note to Working Party 1A on UWB abbreviation and definition for addition to the ITU Terms and Definitions database     N/A  
  [ TD 25 ] Revision 1 - English -  Word 2025-06-13 [11:05]  35'852  bytes  
 
[ TD 21 ]  2025-06-12 WP 1B   Draft reply liaison statement to the Coordination Committee for Terminology (CCT) (copy to ITU-T Study Groups 11, 17 and 20) - UWB definition for addition to the ITU Terms and Definitions database     N/A  
  [ TD 21 ] Revision 1 - English -  Word 2025-06-13 [11:02]  44'061  bytes  
 
[ TD 26 ]  2025-06-13 WG 1B-1   [Working document towards a] preliminary draft new Report ITU-R SM.[GPR/WPR FREQ] - Spectrum management framework for the introduction of Ground- and Wall-Penetrating Radar (GPR/WPR) imaging systems     N/A  
  [ TD 26 ]  - English -  Word 2025-06-13 [10:57]  1'022'870  bytes  
 
[ ADM 30 ]  2025-06-12 WG 1B-1   Draft agenda for the third meeting of Working Group 1B-1 (Short-range devices and related issues) Friday, 13 June 2025, at 0900 hours (Room L (Montbrillant))     N/A  
  [ ADM 30 ]  - English -  Word 2025-06-12 [18:40]  34'933  bytes  
 
[ TD 24 ]  2025-06-12 WG 1B-1   Preliminary draft revision of Report ITU-R SM.2153-9 - Technical and operating parameters and spectrum use for short range radiocommunication devices     N/A  
  [ TD 24 ]  - English -  Word 2025-06-12 [18:40]  449'218  bytes  
 
[ TD 23 ]  2025-06-12 WG 1B-1   Working document towards a preliminary draft revision of Recommendation ITU-R SM.1896-1 - Frequency ranges for global or regional harmonization of short-range devices     N/A  
  [ TD 23 ]  - English -  Word 2025-06-12 [18:22]  46'993  bytes  
 
[ ADM 29 ]  2025-06-12 Chair, WG 1B-1   Draft agenda for the second meeting of Working Group 1B-1 (Short-range devices and related issues) - Wednesday, 12 June 2025, at 1040 hours (Geneva time) (Room L, Montbrillant)     N/A  
  [ ADM 29 ]  - English -  Word 2025-06-12 [08:10]  35'753  bytes  
 
[ ADM 23 ]  2025-06-04 Chairs, WPs 1A, 1B & 1C   Agenda for the joint meeting of Working Parties 1A, 1B and 1C - Wednesday, 11 June 2025, at 0930 hours (Geneva time) - (ITU Room C)     N/A  
  [ ADM 23 ] Revision 1 - English -  Word 2025-06-11 [12:30]  50'025  bytes  
 
[ ADM 28 ]  2025-06-11 Chair, WG 1B-2   Draft agenda of the first meeting of Working Group 1B-2 - Wednesday, 11 June 2025, from 1540 to 1700 hours (Geneva time) (Room L, Montbrillant)     N/A  
  [ ADM 28 ]  - English -  Word 2025-06-11 [11:37]  36'118  bytes  
 
[ ADM 27 ]  2025-06-11 Chair, WG 1B-1   Draft agenda for the first meeting of Working Group 1B-1 (Short-range devices and related issues) - Wednesday, 11 June 2025, at 1400 hours (following the first Plenary of WP 1B) (Room C, ITU Tower)     N/A  
  [ ADM 27 ]  - English -  Word 2025-06-11 [11:00]  34'887  bytes  
 
[ ADM 25 ]  2025-06-04 Chair, WP 1B   Agenda for the opening (first) Plenary session of the third 2023-2027 meeting of Working Party 1B - Wednesday, 11 June 2025, at 1400 hours (Geneva time) - (ITU Room C)     N/A  
  [ ADM 25 ]  - English -  Word 2025-06-10 [19:04]  39'166  bytes  
 
[ ADM 26 ]  2025-06-04 Chair, WP 1B   Structure of sub-Groups and assignment of input documents for the third 2023-2027 Meeting of Working Party 1B (Geneva, 11-18 June 2025)     N/A  
  [ ADM 26 ]  - English -  Word 2025-06-10 [17:43]  44'473  bytes  
 
[ 75 ]  2025-05-30 India   Proposed modification to the preliminary draft new Report ITU-R SM.[SPEC-AVAILABILITY] - Methodologies for assessing or predicting spectrum availability     N/A  
  [ 75 ]  - English -  Word 2025-05-30 [15:49]  34'514  bytes  
 
[ 74 ]  2025-05-29 Indonesia   Spectrum grid to determine spectrum availability     N/A  
  [ 74 ]  - English -  Word 2025-05-29 [10:39]  148'620  bytes  
 
[ 73 ]  2025-05-28 Japan   Additional modifications to working document towards a preliminary draft revision of Report ITU-R SM.2353-0 - Challenges and opportunities for spectrum management resulting from the transition to digital terrestrial television in the UHF bands     N/A  
  [ 73 ]  - English -  Word 2025-05-28 [15:10]  67'328  bytes  
 
[ 72 ]  2025-05-27 WP 5B   Liaison statement to Working Parties 1A and 1B - The On-Tune Rejection (OTR) in Recommendation ITU-R SM.337 and Recommendation ITU-R M.1461     N/A  
  [ 72 ] Revision 1 - English -  Word 2025-05-28 [10:25]  134'931  bytes  
 
[ 71 ]  2025-05-26 Korea (Rep. of)   Working document towards a preliminary draft new Report ITU-R SM.[GPR/WPR FREQ] - Spectrum management framework for the introduction of Ground- and Wall-Penetrating Radar (GPR/WPR) imaging systems     N/A  
  [ 71 ]  - English -  Word 2025-05-27 [14:22]  1'021'230  bytes  
 
[ 70 ]  2025-05-26 Korea (Rep. of)   Guidance to support spectrum use and sharing methodology for private network     Q208/1  
  [ 70 ]  - English -  Word 2025-05-26 [14:13]  669'477  bytes  
 
[ 69 ]  2025-05-26 Korea (Rep. of)   Proposed modification to preliminary draft new Report ITU-R SM.[SPEC-AVAILABILITY] - Methodologies for assessing or predicting spectrum availability     Q241/1  
  [ 69 ]  - English -  Word 2025-05-26 [12:50]  973'894  bytes  
 
[ 68 ]  2025-05-23 United States   Proposed reply liaison statement to ITU-T Study Group 3 - Creation of new work item on economic and policy aspects of the provision of high-speed Internet connectivity by retail satellite operators     N/A  
  [ 68 ]  - English -  Word 2025-05-23 [16:32]  36'875  bytes  
 
[ 67 ]  2025-05-22 Brazil   Proposed modification to preliminary draft new Report ITU-R SM.[SPEC-AVAILABILITY] - Methodologies for assessing or predicting spectrum availability     N/A  
  [ 67 ]  - English -  Word 2025-05-23 [16:14]  270'403  bytes  
 
[ 66 ]  2025-05-23 Director, BR   Additional information on the summary of conclusions of the 32nd meeting of the Radiocommunication Advisory Group for the attention of all ITU-R Study Groups and Working Parties     N/A  
  [ 66 ]  - English -  Word 2025-05-23 [11:01]  38'026  bytes  
 
[ 65 ]  2025-05-19 China   Proposed reply liaison statement to ITU-D Study Group 1 on Report ITU-R SM.2012     N/A  
  [ 65 ]  - English -  Word 2025-05-20 [10:56]  32'919  bytes  
 
[ 64 ]  2025-05-19 China   Proposals for preliminary draft new Report ITU-R SM.[SPEC-AVAILABILITY] - Methodologies for assessing or predicting spectrum availability     N/A  
  [ 64 ]  - English -  Word 2025-05-20 [11:26]  47'658  bytes  
 
[ 63 ]  2025-05-19 China   Proposal for preliminary draft revision of Report ITU-R SM.2012-6 - Economic aspects of spectrum management     N/A  
  [ 63 ]  - English -  Word 2025-05-20 [10:33]  44'699  bytes  
 
[ 62 ]  2025-05-16 ITU-D SG2   Liaison statement from ITU-D Study Group 2 Question 2/2 to ITU-T Study Groups, ITU-R Working Parties and related organizations on final Report of Question 2/2 - ITU-D Study Group 2 Question 2/2: Enabling technologies for e-services and applications, including e-health and e-education     N/A  
  [ 62 ] Part 1 - English -  PDF (acrobat) 2025-05-16 [11:11]  1'670'282  bytes  
  [ 62 ]  - English -  Word 2025-05-16 [11:11]  1'643'090  bytes  
 
[ 61 ]  2025-05-16 ITU-D SG1   Liaison statement from ITU-D Study Group 1 Question 3/1 to ITU-T Study Groups, ITU-R Working Parties, APT ASTAP and ETSI on use of telecommunications/ICTs for disaster risk reduction and management - ITU-D Study Group 1 Question 3/1: The use of telecommunications/ICTs for disaster risk reduction and management     N/A  
  [ 61 ]  - English -  Word 2025-05-16 [11:03]  38'271  bytes  
 
[ 60 ]  2025-05-14 ITU-D SG1   Liaison statement from ITU-D Study Group 1 Question 2/1 to ITU-T Study Group 21 and ITU-R Study Group 1 on strategies, policies, regulations and methods of migration to and adoption of digital technologies for broadcasting, including to provide new services for various environments - ITU-D Study Group 1 Question 2/1: Strategies, policies, regulations and methods of migration to and adoption...     N/A  
  [ 60 ]  - English -  Word 2025-05-14 [12:05]  43'447  bytes  
 
[ 59 ]  2025-05-12 Sierra Leone   Proposal for enhancing spectrum utilization efficiency through analogue to digital migration     N/A  
  [ 59 ]  - English -  Word 2025-05-14 [09:23]  200'446  bytes  
 
[ 58 ]  2025-05-03 WP 4C   Liaison statement to Working Party 4A (copy to Working Party 1B for information) - WRC-27 agenda item 1.5     AI1.15  
  [ 58 ]  - English -  Word 2025-05-04 [03:15]  38'412  bytes  
Results: 52 total items.
Result Page:  1 - 2  - Next
 
Multiple Document Download: Check the boxes of the selected documents, then click "Zip and download"
   
 
User preferences: 
Multiple Document Download: Formats and Languages to be included (when available):
HTML Navigation Pages Yes  
Formats doc pdf zip  + Other formats
Languages (maximum 2) E F S A C R  + Multilingual 
(E: English - F: French - S: Spanish - A: Arabic - C: Chinese - R: Russian)

Top -  Feedback -  Contact Us -  Copyright © ITU 2008 All Rights Reserved
Contact for this page :  ITU-R Web coordinator
Updated : 2025-06-18