International Telecommunication Union   ITU
Français  Español
 
Site map Contact Us Print version
  Home : ITU-R : R23-WP1B Recently posted -  Search Meeting Documents
   
ITU-R R23-WP1B Meeting Documents
  Max # of documents displayed/page:
Results: 32 total items.
Number  Date Source Title Questions 
  Number  Posted Size    
 
[ 29 ]  2024-06-11 WP 3J   Reply liaison statement to Working Party 7B (copy to Working Parties 1B, 4A, 4C, 5A, 5B, 5C, 5D, 7A, 7C and 7D) - Relevant technical information to support studies under WRC-27 agenda item 1.15     AI1.15  
  [ 29 ]  - English -  Word 2024-06-11 [11:33]  36'150  bytes  
 
[ 32 ]  2024-06-18 Director, BR   Final list of participants - Working Party 1B (Geneva, 12-19 June 2024)     N/A  
  [ 32 ]  - English -  PDF (acrobat) 2024-06-18 [16:06]  150'390  bytes  
 
[ 33 ]  2024-06-18 Chair, WP 1B   Report on the first 2023-2027 meeting of Working Party 1B (Geneva, 12-19 June 2024)     N/A  
  [ 33 ]  - English -  Word 2024-07-15 [11:20]  57'660  bytes Report of the first 2023-2027 meeting of Working Party 1B  
  [ 33 ] Annex 3 - English -  Word 2024-07-01 [10:21]  447'711  bytes Working document towards a preliminary draft revision of Report ITU-R SM.2153-9 - Technical and operating parameters and spectrum use for short range radiocommunication devices  
  [ 33 ] Annex 7 - English -  Word 2024-07-01 [10:09]  1'374'956  bytes Preliminary draft revision of Report ITU-R SM.2012-6 - Economic aspects of spectrum management   
  [ 33 ] Annex 10 - English -  Word 2024-06-28 [16:47]  39'579  bytes Reply liaison statement to ITU-D Study Group 2 Question 5/2 and Question 7/2 - Tables of contents of the final reports of ITU-D Question 5/2 and Question 7/2  
  [ 33 ] Annex 9 - English -  Word 2024-06-28 [16:39]  39'695  bytes Reply liaison statement to ITU-D Study Group 1 Question 4/1: Economic aspects of telecommunication/ICTS - Information related to the topics of mutual interest  
  [ 33 ] Annex 8 - English -  Word 2024-06-28 [16:30]  789'737  bytes Preliminary draft revision of Report ITU-R SM.2015-2 - Methods for determining national long-term strategies for spectrum utilization  
  [ 33 ] Annex 6 - English -  Word 2024-06-28 [15:34]  1'604'707  bytes Preliminary draft new Report ITU-R SM.[SPEC-AVAILABILITY] - Methodologies for assessing or predicting spectrum availability  
  [ 33 ] Annex 4 - English -  Word 2024-06-28 [15:08]  1'004'016  bytes Working document towards a preliminary draft new Report ITU-R SM.[GPR/WPR FREQ] - Spectrum management framework for the introduction of Ground- and Wall-Penetrating Radar (GPR/WPR) imaging systems  
  [ 33 ] Annex 5 - English -  Word 2024-06-28 [15:07]  38'264  bytes Terms of Reference of the Correspondence Group (CG) on GPR/WPR  
  [ 33 ] Annex 2 - English -  Word 2024-06-28 [15:05]  52'844  bytes Working document towards a preliminary draft revision of Recommendation ITU-R SM.1896-1 - Frequency ranges for global or regional harmonization of short-range devices  
  [ 33 ] Annex 1 - English -  Word 2024-06-18 [09:19]  40'904  bytes Note from the Chair of Working Party 1B to the Chair of the CPM-27 - Identification of Working Party 1B as a contributing group under several WRC-27 agenda items  
 
[ 35 ]  2024-07-19 ITU-T SG3   Liaison statement on creation of new work item on economic and policy aspects of the provision of high-speed Internet connectivity by retail satellite operators     N/A  
  [ 35 ]  - English -  Word 2024-07-22 [09:01]  50'296  bytes  
 
[ 34 ]  2024-07-09 Chair, CPM-27   Information on the preparation of texts for the draft CPM Report to WRC-27     N/A  
  [ 34 ]  - English -  Word 2024-07-15 [14:38]  60'614  bytes  
 
[ ADM 2 ]  2024-06-06 Acting Chairs, WPs 1A, 1B & 1C   Provisional schedule for the Sessions of the first 2023-2027 meetings of Working Parties 1A, 1B and 1C (Geneva, 12 - 19 June 2024)     N/A  
  [ ADM 2 ] Revision 5 - English -  Word 2024-06-19 [08:28]  51'708  bytes  
 
[ ADM 11 ]  2024-06-17 Acting Chair, WP 1B   Agenda for the second and third (final) Plenary session of the first 2023-2027 meeting of Working Party 1B - Monday, 17 June 2024, at 1540 hours (Geneva time) and Tuesday, 18 June 2024, at 1400 hours (Geneva time) (Room Popov, ITU Tower)     N/A  
  [ ADM 11 ]  - English -  Word 2024-06-17 [14:27]  40'283  bytes  
 
[ ADM 10 ]  2024-06-14 Chair, WG 1B-2   Draft agenda for Working Group 1B-2 meeting - Monday, 17 June 2024, Period 1 (from 900 to 1020 hours) and Period 2 (1040 to 1200 hours) (Geneva time) (if necessary) (Room L, Montbrillant)     N/A  
  [ ADM 10 ]  - English -  Word 2024-06-14 [14:28]  35'651  bytes  
 
[ ADM 9 ]  2024-06-14 Chair, WG 1B-2   Draft agenda for Working Group 1B-2 meeting - Friday, 14 June 2024, Period 2 (from 1040 to 1200 hours) and Period 3 (1430 to 1550 hours) (Geneva time) (Room L, Montbrillant)     N/A  
  [ ADM 9 ]  - English -  Word 2024-06-14 [10:38]  35'848  bytes  
 
[ ADM 8 ]  2024-06-13 Chair, WG 1B-1   Draft agenda for the third meeting of Working Group 1B-1 (Short-range Radiocommunication Devices (SRDs), WRC-27 agenda items and related issues) - Thursday, 13 June 2024, at 1400 hours (Room L, Montbrillant)     N/A  
  [ ADM 8 ]  - English -  Word 2024-06-13 [13:09]  34'068  bytes  
 
[ ADM 7 ]  2024-06-13 Chair, WG 1B-1   Draft agenda for the second meeting of Working Group 1B-1 (Short-range Radiocommunication Devices (SRDs), WRC-27 agenda items and related issues) - Thursday, 13 June 2024, at 0900 hours (Room L, Montbrillant)     N/A  
  [ ADM 7 ]  - English -  Word 2024-06-13 [08:01]  35'506  bytes  
 
[ 31 ]  2024-06-12 BR, Study Groups Department   List of documents issued (Documents 1B/1 - 1B/31)     N/A  
  [ 31 ]  - English -  Word 2024-06-12 [15:44]  39'608  bytes  
 
[ ADM 6 ]  2024-06-12 Acting Chair, WG 1B-1   Draft agenda for the first meeting of Working Group 1B-1 (Short-range Radiocommunication Devices (SRDs), WRC-27 agenda items and related issues) - Wednesday, 12 June 2024, at 1540 hours (Geneva time) (Room C, ITU Tower, following the WP 1B plenary)     N/A  
  [ ADM 6 ]  - English -  Word 2024-06-12 [15:16]  36'786  bytes  
 
[ ADM 5 ]  2024-06-12 Acting Chair, WG 1B-2   [Draft] agenda for Working Group 1B-2 meeting - Thursday, 13 June 2024, from 1040 to 1200 hours (Geneva time) (Room L, Montbrillant)     N/A  
  [ ADM 5 ]  - English -  Word 2024-06-12 [15:34]  36'239  bytes  
 
[ ADM 4 ]  2024-06-06 Acting Chair, WP 1B   Structure of Sub-Groups and assignment of input documents for the first 2023-2027 Meeting of Working Party 1B (Geneva, 12 - 19 June 2024)     N/A  
  [ ADM 4 ]  - English -  Word 2024-06-12 [12:18]  44'907  bytes  
 
[ 30 ]  2024-06-12 Acting Chairs, WPs 1A and 1B   Consideration of Document 1B/22 by Working Party 1A - Preliminary draft new Question ITU-R [UWB]/1     N/A  
  [ 30 ]  - English -  Word 2024-06-12 [11:15]  33'561  bytes  
 
[ 3 ]  2024-02-05 Chair, SG 1   Summary of the main results of RA-23 and CPM27-1 related to Study Group 1     N/A  
  [ 3 ] Revision 1 - English -  Word 2024-06-12 [08:13]  48'941  bytes  
 
[ ADM 3 ]  2024-06-06 Acting Chair, WP 1B   Agenda for the opening (first) Plenary session of the first 2023-2027 meeting of Working Party 1B - Wednesday, 12 June 2024, at 1540 hours (Geneva time)     N/A  
  [ ADM 3 ]  - English -  Word 2024-06-12 [08:05]  38'149  bytes  
 
[ ADM 1 ]  2024-06-06 Acting Chairs, WPs 1A, 1B & 1C   Agenda for the joint meeting of Working Parties 1A, 1B and 1C, Wednesday, 12 June 2024, at 0930 hours (Geneva time)     N/A  
  [ ADM 1 ]  - English -  Word 2024-06-12 [07:57]  49'160  bytes  
 
[ 27 ]  2024-06-10 WPs 3J & 3M   Reply liaison statement to Working Party 7D (copy to Working Parties 1B, 4A, 4C, 5A, 5B and 5D for information) - WRC-27 agenda items 1.16     AI1.16  
  [ 27 ]  - English -  Word 2024-06-10 [16:47]  40'261  bytes  
 
[ 28 ]  2024-06-10 WPs 3K & 3M   Reply liaison statement to Working Party 5D (copy to Working Parties 1B, 4A, 4C, 5A, 5B, 5C, 7B, 7C AND 7D for information) - Relevant technical information to support studies under WRC-27 agenda item 1.7     AI1.7  
  [ 28 ]  - English -  Word 2024-06-11 [10:34]  43'876  bytes  
 
[ 26 ]  2024-06-05 Co-Chairs, CG GPR/WPR   Report of the Correspondence Group to further work on the working document towards a preliminary draft new Report ITU-R SM.[GPR/WPR FREQ]     N/A  
  [ 26 ]  - English -  Word 2024-06-05 [11:47]  37'030  bytes  
Results: 32 total items.
 
Multiple Document Download: Check the boxes of the selected documents, then click "Zip and download"
   
 
User preferences: 
Multiple Document Download: Formats and Languages to be included (when available):
HTML Navigation Pages Yes  
Formats doc pdf zip  + Other formats
Languages (maximum 2) E F S A C R  + Multilingual 
(E: English - F: French - S: Spanish - A: Arabic - C: Chinese - R: Russian)

Top -  Feedback -  Contact Us -  Copyright © ITU 2008 All Rights Reserved
Contact for this page :  ITU-R Web coordinator
Updated : 2024-08-16