Number |
Date
|
Source
|
Title
|
Questions
|
|
Number |
Posted |
Size
|
|
|
|
[ 233 ]
|
2025-06-25 |
WP 1A
|
Reply liaison statement to ITU-T Study Group 15 Question 6/15 (copy to ITU-R Working Parties 3M and 5C) - Free-space optics systems related aspects for G.fso
|
N/A
|
|
[ 233 ] - English - Word |
2025-06-25 [10:45]
|
37'255 bytes |
|
|
[ 232 ]
|
2025-06-06 |
Chair, WP 3M
|
Report on the meeting of Working Party 3M (Geneva, 26 May-5 June 2025)
|
N/A
|
|
[ 232 ] - English - Word |
2025-07-08 [15:13]
|
126'436 bytes |
Report on the meeting of Working Party 3M (26 May - 5 June 2025)
|
|
[ 232 ] Annex 4 - English - Word |
2025-06-19 [10:49]
|
9'475'705 bytes |
Proposal on working document toward a preliminary draft revision of Handbook 58 - Handbook 58 on ITU-R propagation prediction methods for interference and sharing studies
|
|
[ 232 ] Annex 14 - English - Word |
2025-06-19 [08:58]
|
1'888'603 bytes |
Working document towards a preliminary draft new Fascicle 3M/FAS/[ML] - Best practices for evaluating the generalization of machine learning-driven radio propagation models
|
|
[ 232 ] Annex 13 - English - Word |
2025-06-19 [08:56]
|
45'308 bytes |
Working document towards preliminary draft revision of Question ITU-R 236/3 - Use of machine learning methods for radiowave propagation studies
|
|
[ 232 ] Annex 12 - English - Word |
2025-06-19 [08:46]
|
37'206 bytes |
Application of machine learning for radio-wave propagation studies
|
|
[ 232 ] Annex 11 - English - Word |
2025-06-19 [08:39]
|
55'021 bytes |
Updated analysis of P-series recommendations for the preparation of draft reply liaison statements
|
|
[ 232 ] Annex 7 - English - Word |
2025-06-19 [08:30]
|
151'181 bytes |
Relationship between the ITU-R P-series Recommendations
|
|
[ 232 ] Annex 4 - Part 1 - English - Word |
2025-06-18 [16:52]
|
9'451'381 bytes |
|
|
[ 232 ] Annex 9 - English - Word |
2025-06-18 [16:02]
|
9'177'446 bytes |
Discussion document - Data results from dual channel troposcatter measurement system utilized in Colorado, USA from February 2024 to January 2025
|
|
[ 232 ] Annex 10 - Part 3 - English - Word |
2025-06-18 [15:38]
|
156'953 bytes |
|
|
[ 232 ] Annex 10 - Part 2 - English - Zip (Document) |
2025-06-18 [15:37]
|
12'401'634 bytes |
|
|
[ 232 ] Annex 10 - Part 1 - English - Excel 2007 |
2025-06-18 [15:37]
|
158'525 bytes |
|
|
[ 232 ] Annex 10 - English - Word |
2025-06-18 [15:36]
|
802'598 bytes |
Software Implementation - Recommendation ITU-R P.530-18, Annex 1: Attenuation due to multipath and precipitation - for evaluation
|
|
[ 232 ] Annex 3 - English - Word |
2025-06-18 [15:23]
|
929'815 bytes |
Considerations regarding a working document towards a preliminary draft revision of Recommendation ITU-R P.618 - Preliminary draft revisions and future work
|
|
[ 232 ] Annex 8 - English - Word |
2025-06-18 [15:14]
|
260'429 bytes |
Discussion document on rain attenuation at high frequencies in Recommendation ITU-R P.530-18 - Propagation data and prediction methods required for the design of terrestrial line-of-sight systems
|
|
[ 232 ] Annex 2 - English - Word |
2025-06-18 [15:10]
|
39'123 bytes |
Working document on the correlation of rain attenuation between two space stations and one location on the surface of the Earth
|
|
[ 232 ] Annex 15 - English - Word |
2025-06-18 [15:05]
|
54'652 bytes |
Working Group 3M-4 Report - New measurements and Table-keepers for SG 3 experimental database (DBSG3)
|
|
[ 232 ] Annex 6 Part 1 - English - Zip (Document) |
2025-06-18 [13:07]
|
2'545'814 bytes |
|
|
[ 232 ] Annex 6 - English - Word |
2025-06-18 [13:06]
|
2'585'525 bytes |
Update to the reference MATLAB/OCTAVE implementation of Recommendation ITU-R P.2001-4
|
|
[ 232 ] Annex 5 - Part 1 - English - Zip (Document) |
2025-06-18 [13:03]
|
315'199 bytes |
|
|
[ 232 ] Annex 5 - English - Word |
2025-06-18 [13:02]
|
330'155 bytes |
Update to the reference MATLAB/Octave implementation of Recommendation ITU-R P.452-18
|
|
[ 232 ] Annex 1 Part 2 - English - Zip (Document) |
2025-06-18 [12:46]
|
5'417 bytes |
|
|
[ 232 ] Annex 1 Part 1 - English - Word |
2025-06-18 [12:46]
|
223'370 bytes |
|
|
[ 232 ] Annex 1 - English - Word |
2025-06-18 [12:45]
|
3'286'200 bytes |
Working document toward a preliminary draft revision of the clutter loss prediction method in Recommendation ITU-R P.452-17 - Determination of a minimum distance of local clutter for the application of the Bullington method
|
|
[ 231 ]
|
2025-06-06 |
Director, BR
|
Final list of participants WP 3M (Geneva, 26 May-5 June 2025)
|
N/A
|
|
[ 231 ] - English - PDF (acrobat) |
2025-06-06 [15:11]
|
137'654 bytes |
|
|
[ ADM 30 ]
|
2025-06-05 |
Chair, WP 3M
|
Draft agenda for the closing Plenary of Working Party 3M - Thursday, 5 June 2025, following Working Parties 3J, 3L and 3K starting at 0900 hours (Geneva time) (Room H, ITU Montbrillant)
|
N/A
|
|
[ ADM 30 ] Revision 1 - English - Word |
2025-06-05 [13:18]
|
56'720 bytes |
|
|
[ ADM 23 ]
|
2025-05-27 |
Chair, JWG Clutter Loss
|
[Draft] agenda for the Joint Working Group (JWG) on Clutter Loss - From 27 May 2025 to 4 June 2025 (Montbrillant - Room K)
|
N/A
|
|
[ ADM 23 ] Revision 2 - English - Word |
2025-06-04 [13:11]
|
40'209 bytes |
|
|
[ ADM 25 ]
|
2025-05-27 |
Chair, WG 3M-2
|
Draft Agenda for Working Group 3M-3 (Interference Paths) - Wednesday, 28 May 2025, from 0900 to 1020 hours (Geneva time), Room L2 - Monday, 2 June 2025, from 1300 to 1415 hours (Geneva time), Room H - Wednesday, 4 June 2025, from 1300 to 1415 hours (Geneva time), Room H
|
N/A
|
|
[ ADM 25 ] Revision 3 - English - Word |
2025-06-04 [11:37]
|
55'173 bytes |
|
|
[ ADM 22 ]
|
2025-05-23 |
SG 3, WPs 3J, 3K, 3M & 3M
|
Draft meetings schedule (26 May - 6 June 2025)
|
N/A
|
|
[ ADM 22 ] Revision 8 - English - Word |
2025-06-04 [08:53]
|
58'642 bytes |
|
|
[ ADM 26 ]
|
2025-05-27 |
Chair, WGs 3K-1 & 3M-3
|
Draft Agenda for Working Groups 3K-1 and 3M-3 (P.1812, P.452, and P.2001) - Thursday, 29 May 2025, from 1430 to 1545 hours (Geneva time), Room H - Monday, 2 June 2025, from 0900 to 1020 hours (Geneva time), Room H, Montbrillant
|
N/A
|
|
[ ADM 26 ] Revision 2 - English - Word |
2025-06-03 [09:00]
|
47'686 bytes |
|
|
[ INF 3 ]
|
2025-05-21 |
BR, Study Groups Department
|
Information for participants - Meetings of Study Group 3 (Geneva, 26 May and 6 June 2025) and Working Parties 3J, 3K, 3L and 3M (Geneva, 26 May - 5 June 2025)
|
N/A
|
|
[ INF 3 ] Revision 1 - Part 1 - English - PowerPoint 2007 |
2025-06-02 [11:41]
|
4'451'924 bytes |
|
|
[ INF 3 ] Revision 1 - English - Word |
2025-06-02 [11:40]
|
5'317'155 bytes |
|
|
[ ADM 24 ]
|
2025-05-27 |
Chair, WG 3M-2
|
Draft Agenda for the meetings of Working Group 3M-2
(Earth-space paths) - Monday, 2 June 2025, 1300-1415 hours (Geneva time) (ITU Montbrillant, Room L1)
|
N/A
|
|
[ ADM 24 ] Revision 2 - English - Word |
2025-06-02 [08:09]
|
43'795 bytes |
|
|
[ ADM 29 ]
|
2025-05-30 |
Chair, WG 3M-4
|
Agenda for the meetings of Working Group 3M-4 (Digital Products) - Saturday, 31 May 2025 0900-1020, (Geneva time) (Room H, Montbrillant)
|
N/A
|
|
[ ADM 29 ] Revision 1 - English - Word |
2025-05-30 [12:52]
|
60'165 bytes |
|
|
[ ADM 28 ]
|
2025-05-28 |
Chair, JWG 3J-3K-3M BEL
|
Draft Agenda for the meetings of Joint Working Group 3J-3K-3M BEL (Building Entry Loss) - Friday 30 May 2025, 0900-1020 hours (Geneva time) (ITU Montbrillant, Room L1)
|
N/A
|
|
[ ADM 28 ] - English - Word |
2025-05-28 [14:23]
|
38'665 bytes |
|
|
[ 230 ]
|
2025-05-28 |
BR, Study Groups Department
|
List of documents issued - (Documents 3M/157 - 3M/230)
|
N/A
|
|
[ 230 ] - English - Word |
2025-05-28 [12:11]
|
52'179 bytes |
|
|
[ ADM 27 ]
|
2025-05-27 |
Chair, WG 3M-1
|
Draft agenda for meetings of Working Group 3M-1
Terrestrial Paths - Meeting 1: Wednesday, 28 May 2025, Session 3 (1300-1415), Room H - Meeting 2: Thursday, 29 May 2025, Session 3 (1300-1415), Room H
|
N/A
|
|
[ ADM 27 ] - English - Word |
2025-05-27 [15:46]
|
40'853 bytes |
|
|
[ ADM 21 ]
|
2025-05-23 |
Acting Chair, WP 3M
|
Organization of work and allocation of documents
|
N/A
|
|
[ ADM 21 ] Revision 1 - English - Word |
2025-05-26 [18:12]
|
90'750 bytes |
|
|
[ ADM 20 ]
|
2025-05-23 |
Acting Chair, WP 3M
|
Draft Agenda for the Opening Plenary of Working Party 3M - Monday, 26 May 2025, following Working Parties 3J, 3K, and 3L starting at 1400 hours (Geneva time) (Room H, ITU Montbrillant)
|
N/A
|
|
[ ADM 20 ] - English - Word |
2025-05-23 [17:15]
|
41'771 bytes |
|
|
[ 228 ]
|
2025-05-22 |
WP 5C
|
Liaison statement to ITU-T Study Group 15 Question 6/15 (Copy to ITU-R Working Parties 1A, 3J, 3M and Study Group 5) - Free-space optics systems related aspects for G.fso
|
N/A
|
|
[ 228 ] - English - Word |
2025-05-22 [18:39]
|
34'225 bytes |
|
|
[ 229 ]
|
2025-05-23 |
Director, BR
|
Additional information on the summary of conclusions of the 32nd meeting of the Radiocommunication Advisory Group for the attention of all ITU-R Study Groups and Working Parties
|
N/A
|
|
[ 229 ] - English - Word |
2025-05-23 [11:03]
|
38'026 bytes |
|
|
[ 227 ]
|
2025-05-22 |
WP 5C
|
Liaison statement to ITU-R Working Party 3M regarding the development of a new ITU-R Handbook on Fixed Wireless Systems
|
N/A
|
|
[ 227 ] - English - Word |
2025-05-23 [11:06]
|
37'612 bytes |
|
|
[ 184 ]
|
2025-05-13 |
China
|
Proposed supplement to Recommendation ITU-R P.1144-12 - The relationship between the ITU-R P-series recommendations
|
N/A
|
|
[ 184 ] - English - Word |
2025-05-14 [09:04]
|
264'389 bytes |
|
|
[ 211 ]
|
2025-05-14 |
United Kingdom
|
Preliminary draft revision to Recommendation ITU-R P.530-18 - Clarification of Text in section 2.4 Attenuation due to hydrometeors
|
N/A
|
|
[ 211 ] - English - Word |
2025-05-16 [17:06]
|
179'289 bytes |
|
|
[ 226 ]
|
2025-05-14 |
Telefon AB - LM Ericsson
|
Working document towards a preliminary draft of section 3.3 of Recommendation ITU-R P.2108 - Discussion document on deployment general slant path clutter model
|
N/A
|
|
[ 226 ] - English - Word |
2025-05-19 [17:38]
|
525'161 bytes |
|
|
[ 225 ]
|
2025-05-14 |
Telefon AB - LM Ericsson
|
Contribution to Recommendation ITU-R P.2108 and Report ITU-R P.2402 - Further measurement input to Earth-to-space interference modelling
|
N/A
|
|
[ 225 ] - English - Word |
2025-05-19 [16:21]
|
4'493'129 bytes |
|
|
[ 224 ]
|
2025-05-14 |
France
|
Discussion on clutter loss models for sharing and compatibility studies and proposals for a reply liaison statement to Working Party 5D
|
AI1.7
|
|
[ 224 ] - English - Word |
2025-05-19 [16:52]
|
41'027 bytes |
|
|
[ 223 ]
|
2025-05-14 |
France
|
Proposed revision to Recommendation ITU-R P.837-7 - Characteristics of precipitation for propagation modelling
|
N/A
|
|
[ 223 ] Part 01 - English - Zip (Document) |
2025-05-19 [16:08]
|
4'213'658 bytes |
|
|
[ 223 ] - English - Word |
2025-05-19 [16:07]
|
3'478'749 bytes |
|
Results: 89 total items.
Result Page:
1 -
2
- Next

|
Multiple Document Download: Formats and Languages to be included (when available):