International Telecommunication Union   ITU
Français  Español
 
Site map Contact Us Print version
  Home : ITU-R : R23-WP4B : Contributions  Recently posted -  Search Meeting Documents
   
ITU-R R23-WP4B  C 

ITU-R R23-WP4B

Systems, air interfaces, performance and availability objectives for FSS, BSS and MSS, including IP-based applications and satellite news gathering

Results:45 total items.
Contributions  Documents / Contributions
 
Number 
Title Source AI/Question
Date
[ 45 ]  
 
Information on the preparation of texts for the draft CPM Report to WRC-27     Chair, CPM-27     2024-07-09
[ 44 ]  
 
Liaison statement to ITU-T Study Group 17 and ITU-R Working Parties 4B and 5D - Terms and definitions related to IMT-2020 (5G) technology     CCT     2024-06-27
[ 43 ]  
 
Reply liaison statement to Working Party 4A (copy to Working Parties 4B, 5A, 5B, 5C, 6B and 7C for information) - WRC-27 agenda item 1.4     WP 3M   AI1.4   2024-06-12
[ 42 ]  
 
Reply liaison statement to Working Party 4C (copy to Working Parties 4A, 4B, 5A, 5B, 5C, 5D, 6A,7B, 7C and 7D for information) - Studies under WRC-27 agenda items 1.11, 1.12, 1.13 and 1.14     WPs 3L & 3M   AI1.14, AI1.13, AI1.12, AI1.11   2024-06-12
[ 41 ]  
 
Reply liaison statement to Working Party 5C (copy to Working Parties 1A, 4A, 4B, 4C, 5A, 5B, 6A, 7C and 7D for information) - Studies under WRC-27 agenda item 1.10     WPs 3J & 3M   AI1.10   2024-06-11
[ 40 ]  
 
Reply liaison statement to Working Party 4C (copy to Working Parties 3L, 3M, 4A, 4B, 5A, 5B, 5D, 6A, 7B, 7C and 7D for information) - Fixed service characteristics for use in sharing studies under WRC-27 agenda item 1.13     WP 5C   AI1.13   2024-05-29
[ 39 ]  
 
Liaison statement to Working parties 4A, 4C, 5A, 5B, 3J and 3M (copy to Working Parties 1A, 4B, 6A, 7C and 7D for information) - Studies under WRC-27 agenda item 1.10     WP 5C   AI1.10   2024-05-29
[ 38 ]  
 
Reply liaison statement to Working Party 4A (copy to Working Parties 3M, 4B, 5A, 5B, 6B, AND 7C for information) - Fixed service characteristics for use in sharing studies under WRC-27 agenda item 1.4     WP 5C   AI1.4   2024-05-29
[ 37 ]  
 
Liaison statement to Working Parties 3M, 5A, 5B, 5C, 6B and 7C (copy to Working Party 4B for information) - WRC-27 agenda item 1.4     WP 4A   AI1.4   2024-05-13
[ 36 ]  
 
Liaison statement on guidance on KPIs for monitoring QoS of broadband services provided via low-Earth orbit satellites     ITU-T SG12     2024-05-02
[ 35 ]  
 
Liaison statement to Working Parties 3L, 4B, 5A, 5C, 5D, 7B, and 7C (copy to Working Party 4A for information, and action if any) - Relevant technical information to support studies under WRC-27 agenda item 1.14     WP 4C   AI1.14   2024-05-02
[ 34 ]  
 
Liaison statement to Working Parties 3L, 3M, 4A, 4B, 5A, 5B, 5C, 5D, 6A, 7B, 7C and 7D - Technical information to support the studies for WRC-27 agenda item 1.13     WP 4C   AI1.13   2024-05-02
[ 33 ]  
 
Liaison statement to Working Parties 3L, 3M, 4B, 5A, 5B, 5C, 5D, 7B, 7C and 7D (copy to Working Party 4A for information, and action if any) - Relevant technical information to support studies under WRC-27 agenda item 1.12     WP 4C   AI1.12   2024-05-01
[ 32 ]  
 
Liaison statement to Working Parties 3L, 3M, 4A, 4B, 5A, 5B, 5C, 5D, 7B, 7C and 7D - WRC-27 agenda item 1.11     WP 4C   AI1.11   2024-05-01
[ 31 ]  
+Ann.1-15 
Report on the fifty-fourth meeting of Working Party 4B (Geneva, 29 April - 3 May 2024)     Chair, WP 4B     2024-05-01
[ 30 ]  
 
Final list of participants Working Party 4B (Geneva, 29 April - 3 May 2024)     Director, BR     2024-05-01
[ 29 ]  
 
List of documents issued (Documents 4B/1 - 4B/29)     BR, Study Groups Department     2024-04-26
[ 28 ]  
 
Tentative plans for the 2023-2027 Study Group cycle     Chair, WP 4B     2024-04-26
[ 27 ]  
 
Liaison statement to Radiocommunication Study Groups and Working Parties (copy for information to ITU-T and ITU-D Study Groups)     Chair, CCV     2024-04-22
[ 26 ]  
 
Interim evaluation Report of the 3GPP candidate for the satellite component of IMT-2020     Director, BR     2024-04-18
[ 25 ]  
 
Considerations on the possible future development of low data rate MSS systems related to WRC-27 agenda item 1.12     Canada , Norway   AI1.12   2024-04-17
[ 24 ]  
 
Working document towards possible revisions of Recommendations ITU-R S.2131 and ITU-R S.1806     Globalstar, Inc. (United States)     2024-04-16
[ 23 ]  
 
Interim evaluation analysis from ATIS WTSC IMT-2020 Independent Evaluation Group on the 3GPP submission(s) toward IMT-2020 Satellite component technologies     Alliance for Telecommunications Industry Solutions (ATIS)     2024-04-16
[ 22 ]  
 
Preliminary evaluation report on the proposed candidate IMT-2020 satellite radio interface technology in Document IMT-2020-SAT/4     ETSI     2024-04-16
[ 21 ]  
 
Workplan for development of a new Report ITU-R M.[SAT IOT]     Russian Federation     2024-04-11
[ 20 ]  
 
Proposal on working document towards a preliminary draft new Report ITU-R M.[SAT IOT] - Technical and operational aspects of satellite Internet of Things (IoT) applications     Russian Federation     2024-04-11
[ 19 ]  
 
Working document towards a preliminary draft new Recommendation/Report on candidate network architectures and their impacts on performance objectives for mobile-satellite service systems with on-board processing     Korea (Rep. of)   Q218/4   2024-04-11
[ 18 ]  
 
Proposed workplan for the future development of satellite IMT-2030     Korea (Rep. of) , France     2024-04-11
[ 17 ]  
 
Liaison statement on consent of draft new Recommendation ITU-T Y.3207 (ex Y.FMSC-INCA) - Fixed, mobile and satellite convergence - Integrated network control architecture framework for IMT-2020 networks and beyond     ITU-T SG13     2024-04-11
[ 16 ]  
 
Liaison statement on agreement of new Supplement 81 to ITU-T Y.3200-Series (ex Y.Sat-Use-Cases) - Use cases of satellite communications in developing countries     ITU-T SG13     2024-04-11
[ 15 ]  
 
Preliminary evaluation Report on the proposed candidate IMT-2020 satellite radio interface technology in Document IMT-2020-SAT/4     Director, BR     2024-04-11
[ 14 ]  
 
Liaison statement to Working Party 4B - Terms of Reference of a rapporteur on BSS     WP 6B     2024-03-21
[ 13 ]  
 
Note to CPM Steering Committee (copy to Working Parties 3M, 4B, 5A, 5B, 5C and 7C) - WRC-27 agenda item 1.4     Acting Chair, WP 6B   AI1.4   2024-03-20
[ 12 ]  
 
Liaison statement to Working Parties 4B and 6B - Revision of Recommendation ITU-R BT./BO.1774-2     WP 6A     2024-03-18
[ 11 ]  
 
Liaison statement to Working Party 4A (copy to Working Parties 1B, 3M, 4B, 4C, 5A, 5B, 5C, 5D, 7B, 7C and 7D for information) - WRC-27 agenda item 1.6     WP 6A   AI1.6   2024-03-18
[ 10 ]  
 
Liaison statement to Working Party 5C (copy to Working Parties 1A, 3J, 3M, 4A, 4B, 4C, 5A, 5B, 7C and 7D for information) - WRC-27 agenda item 1.10     WP 6A   AI1.10   2024-03-18
[ 9 ]  
 
Liaison statement to Working Party 4C (copy to Working Parties 3L, 3M, 4A, 4B, 5A, 5B, 5C, 5D, 7B, 7C and 7D) - WRC-27 agenda item 1.13     WP 6A   AI1.13   2024-03-18
[ 8 ]  
 
Liaison statement to CPM Management Team (copy to Working Parties 3L, 3M, 4A, 4B, 4C, 5A, 5B, 5C, 5D, 7B, 7C and 7D) - WRC-27 agenda item 1.11     WP 6A   AI1.11   2024-03-18
[ 7 ]  
 
Text from WRC-23 Plenary for the attention of the ITU-R Working Parties that are either responsible for or contributing to studies relevant to items of the WRC-27 agenda or the WRC-31 preliminary agenda     Director, BR     2024-01-30
[ 6 ]  
+Ann.1-4 
Report on the fifty-third-bis meeting of Working Party 4B (Virtual Meeting, 23 January 2024)     Chair, WP 4B     2024-01-24
[ 5 ]  
 
Final list of participants - Working Party 4B (e-Meeting, 23 January 2024)     Director, BR     2024-01-24
[ 4 ]  
 
3GPP technology submission of 3GPP 5G NTN solutions for the satellite component of IMT-2020     Alliance for Telecommunications Industry Solutions     2023-12-19
[ 3 ]  
 
Liasion statement on the consent of draft new Recommendation ITU-T Y.3205 (ex Y.FMSC-IUSU-req) - Fixed, mobile and satellite convergence - Requirements of integrated user centric service units     ITU-T SG13     2023-12-19
[ 2 ]  
 
Liaison statement on the consent of draft new Recommendation ITU-T Y.3206 (ex Y.FMSC-CE) - Fixed, mobile and satellite convergence - Capability exposure for IMT-2020 networks and beyond     ITU-T SG13     2023-12-19
[ 1 ]  
 
Documents to be carried over from the 2019-2023 Study Period     WP 4B     2023-11-29
Results:45 total items.
 
Multiple Document Download: Check the boxes of the selected documents, then click "Zip and download"
   
 
User preferences: 
Multiple Document Download: Formats and Languages to be included (when available):
HTML Navigation Pages  
Formats  + Other formats
Languages (maximum 2)  + Multilingual 
(E: English - F: French - S: Spanish - A: Arabic - C: Chinese - R: Russian)

Top -  Feedback -  Contact Us -  Copyright © ITU 2008 All Rights Reserved
Contact for this page :  ITU-R Web coordinator
Updated : 2024-07-15