Number |
Date
|
Source
|
Title
|
Questions
|
|
Number |
Posted |
Size
|
|
|
|
[ 139 ]
|
2025-05-06 |
Chair, WP 4B
|
Report on the fifty-sixth meeting of Working Party 4B (Shanghai, China, 30 April - 6 May 2025)
|
N/A
|
|
[ 139 ] Annex 5 - English - Word |
2025-06-11 [14:25]
|
40'815 bytes |
Liaison statement to Working Party 5D - Status of draft new Recommendation ITU-R M.[IMT-2020-SAT.SPECS]
|
|
[ 139 ] Annex 11 - English - Word |
2025-05-28 [14:13]
|
17'252'072 bytes |
Proposed elements of a working document towards the ITU-R Handbook on Satellite Communications and Technologies
|
|
[ 139 ] Annex 9 - English - Word |
2025-05-28 [09:33]
|
976'220 bytes |
Working document towards a preliminary draft new Report ITU-R M.[SAT IOT] - Technical and operational aspects of satellite Internet of Things (IoT) applications
|
|
[ 139 ] Annex 10 - English - Word |
2025-05-28 [09:17]
|
38'073 bytes |
Liaison statement to 3GPP on draft new Recommendation ITU-R M.[IMT-2020-SAT.SPECS] - Detailed specifications of the satellite radio interfaces of International Mobile Telecommunications-2020 (IMT-2020)
|
|
[ 139 ] Annex 6 - English - Word |
2025-05-28 [08:52]
|
39'621 bytes |
Detailed work plan for working document towards a preliminary draft new Report ITU-R M.[EMG.MSS] - Development and technology of emergency communications in mobile-satellite service
|
|
[ 139 ] Annex 8 - English - Word |
2025-05-28 [08:43]
|
54'791 bytes |
Working document towards a preliminary draft new Report ITU-R M.[MSS_OBP] - Example/Survey of network architectures and their impacts on performance objectives for mobile-satellite service systems with on-board processing
|
|
[ 139 ] Annex 4 - English - Word |
2025-05-28 [08:37]
|
42'144 bytes |
[Working document towards a preliminary draft new ITU-R Report on a framework for satellite radio interface(s) of IMT-2030]
|
|
[ 139 ] Annex 7 - English - Word |
2025-05-28 [08:30]
|
38'503 bytes |
Working document towards a preliminary draft new Report ITU-R M.[EMG.MSS] - Development and technology of emergency communications
in mobile-satellite service
|
|
[ 139 ] Annex 1 - English - Word |
2025-05-27 [14:10]
|
34'750 bytes |
Work plan for the fifty-sixth meeting of Working Party 4B (Shanghai, 30 April - 6 May 2025)
|
|
[ 139 ] Annex 13 - English - Word |
2025-05-27 [13:55]
|
33'878 bytes |
List of documents issued and treated
|
|
[ 139 ] Annex 14 - English - Word |
2025-05-27 [13:55]
|
36'307 bytes |
Final list of participants
|
|
[ 139 ] Annex 12 - English - Word |
2025-05-27 [13:50]
|
37'011 bytes |
Liaison statement to Working Party 4A on material for the Handbook of satellite communications
|
|
[ 139 ] Annex 3 - English - Word |
2025-05-27 [13:40]
|
167'229 bytes |
Proposed work plan for the future development of satellite IMT-2030 - Work plan, timeline, process and deliverables for the future development of satellite IMT-2030
|
|
[ 139 ] Annex 2 - English - Word |
2025-05-27 [13:34]
|
189'647 bytes |
Working document towards a preliminary draft new Report on development and technology trends for the satellite component of IMT towards 2030 and beyond
|
|
[ 148 ]
|
2025-06-10 |
WP 3M
|
Liaison statement to Working Party 4A (copy to Working Parties 4B, 5A, 5B, 5C and 7C for information) - Update on propagation modelling for WRC-27 agenda item 1.4
|
AI1.4
|
|
[ 148 ] - English - Word |
2025-06-10 [12:41]
|
38'009 bytes |
|
|
[ 147 ]
|
2025-06-10 |
WP 3M
|
Liaison statement to Working Party 5C (copy to Working Parties 4A, 4B, 4C, 5A, 5B, 6A, 7C and 7D for information) - Update on propagation modelling for WRC-27 agenda item 1.10
|
AI1.10
|
|
[ 147 ] - English - Word |
2025-06-10 [11:38]
|
38'335 bytes |
|
|
[ 146 ]
|
2025-06-10 |
WP 3M
|
Liaison statement to Working Party 4C (copy to Working Parties 4A, 4B, 5A, 5B, 5C, 5D, 6A, 7B, 7C and 7D for information) - Update on propagation modelling for WRC-27 agenda items 1.11, 1.12, 1.13 and 1.14
|
AI1.11, AI1.12, AI1.13, AI1.14
|
|
[ 146 ] - English - Word |
2025-06-10 [10:18]
|
41'445 bytes |
|
|
[ 145 ]
|
2025-05-23 |
Director, BR
|
Additional information on the summary of conclusions of the 32nd meeting of the Radiocommunication Advisory Group for the attention of all ITU-R Study Groups and Working Parties
|
N/A
|
|
[ 145 ] - English - Word |
2025-05-23 [11:03]
|
38'026 bytes |
|
|
[ TD 31 ]
|
2025-05-05 |
Chair, WP 4B
|
Liaison statement to 3GPP
on
new Recommendation ITU-R M.[IMT-2020-SAT.SPECS] - Detailed specifications of the satellite radio interfaces of International Mobile Telecommunications-2020 (IMT-2020)
|
N/A
|
|
[ TD 31 ] - English - Word |
2025-05-20 [14:39]
|
43'270 bytes |
|
|
[ 144 ]
|
2025-05-20 |
WP 4A
|
Reply liaison statement to Working Parties 4B, 4C and 5A (copy for information to Study Groups 1, 5 and 7)
|
N/A
|
|
[ 144 ] - English - Word |
2025-05-20 [12:27]
|
35'688 bytes |
|
|
[ 143 ]
|
2025-05-16 |
ITU-D SG2
|
Liaison statement from ITU-D Study Group 2 Question 2/2 to ITU-T Study Groups, ITU-R Working Parties and related organizations on final Report of Question 2/2 - ITU-D Study Group 2 Question 2/2: Enabling technologies for e-services and applications, including e-health and e-education
|
N/A
|
|
[ 143 ] Part 1 - English - PDF (acrobat) |
2025-05-16 [11:13]
|
1'670'282 bytes |
|
|
[ 143 ] - English - Word |
2025-05-16 [11:13]
|
1'643'090 bytes |
|
|
[ 142 ]
|
2025-05-16 |
ITU-D SG1
|
Liaison statement from ITU-D Study Group 1 Question 3/1 to ITU-T Study Groups, ITU-R Working Parties, APT ASTAP and ETSI on use of telecommunications/ICTs for disaster risk reduction and management - ITU-D Study Group 1 Question 3/1: The use of telecommunications/ICTs for disaster risk reduction and management
|
N/A
|
|
[ 142 ] - English - Word |
2025-05-16 [11:05]
|
38'271 bytes |
|
|
[ 141 ]
|
2025-05-12 |
WP 4C
|
Liaison statement to Working Parties 3L, 3M, 4A, 4B, 5A, 5B, 5C, 5D, 7B, 7C, and 7D regarding progress of work on WRC-27 agenda item 1.11
|
AI1.11
|
|
[ 141 ] - English - Word |
2025-06-16 [09:32]
|
38'471 bytes |
|
|
[ 140 ]
|
2025-05-07 |
ITU-T SG17
|
Liaison statement on establishment of a new work item technical report ITU-T TR.FMSC-IMT2030 - Security technologies of fixed, mobile and satellite convergence for IMT-2030 networks
|
N/A
|
|
[ 140 ] - English - Word |
2025-05-07 [09:26]
|
35'289 bytes |
|
|
[ 138 ]
|
2025-05-06 |
Director, BR
|
Final list of participants Working Party 4B (Shanghai, China, 30 April - 6 May 2025)
|
N/A
|
|
[ 138 ] - English - PDF (acrobat) |
2025-05-08 [10:33]
|
172'921 bytes |
|
|
[ TD 38 ]
|
2025-05-05 |
SWG 4B3
|
[Draft] liaison statement to Working Party 4A on material for satellite Handbook
|
N/A
|
|
[ TD 38 ] - English - Word |
2025-05-06 [03:08]
|
37'066 bytes |
|
|
[ TD 36 ]
|
2025-05-05 |
WP 4B
|
[Draft] Reply liaison statement to Working Party 5D - Status of draft Recommendation ITU-R M.[IMT-2020-SAT.SPECS]
|
N/A
|
|
[ TD 36 ] - English - Word |
2025-05-06 [02:57]
|
41'732 bytes |
|
|
[ TD 35 ]
|
2025-05-05 |
SWG 4B1
|
[Working document towards a preliminary draft new ITU-R Report on a framework for satellite radio interface(s) of IMT-2030]
|
N/A
|
|
[ TD 35 ] - English - Word |
2025-05-06 [02:44]
|
41'740 bytes |
|
|
[ TD 34 ]
|
2025-05-05 |
SWG 4B3
|
Proposed elements of a working document towards the ITU-R Handbook on Satellite Communications
|
N/A
|
|
[ TD 34 ] - English - Word |
2025-05-07 [05:13]
|
17'261'423 bytes |
|
|
[ TD 33 ]
|
2025-05-05 |
SWG 4B1
|
Proposed work plan for the future development of satellite IMT-2030 - Work plan, timeline, process and deliverables for the future development of satellite IMT-2030
|
N/A
|
|
[ TD 33 ] - English - Word |
2025-05-06 [02:32]
|
166'261 bytes |
|
|
[ TD 32 ]
|
2025-05-05 |
SWG 4B1
|
Working document towards a preliminary draft new Report on development and technology trends for the satellite component of IMT towards 2030 and beyond
|
N/A
|
|
[ TD 32 ] - English - Word |
2025-05-06 [02:23]
|
189'723 bytes |
|
|
[ TD 30 ]
|
2025-05-04 |
SWG 4B2 (Other Topics)
|
Working document towards a preliminary draft new Report ITU-R M.[SAT IOT] - Technical and operational aspects of satellite Internet of Things (IoT) applications
|
N/A
|
|
[ TD 30 ] - English - Word |
2025-05-05 [09:04]
|
1'099'740 bytes |
|
|
[ TD 29 ]
|
2025-05-04 |
SWG 4B2 (Other Topics)
|
Working document towards a preliminary draft new Report ITU-R M.[MSS_OBP] - Example network architectures and their impacts on performance objectives for mobile-satellite service systems with on-board processing
|
N/A
|
|
[ TD 29 ] - English - Word |
2025-05-05 [09:00]
|
55'186 bytes |
|
|
[ ADM 10 ]
|
2025-04-28 |
Chair, WP 4B
|
Fifty-sixth meeting of Working Party 4B - Meeting schedule (Shanghai, 30 April - 6 May 2025)
|
N/A
|
|
[ ADM 10 ] Revision 4 - English - Word |
2025-05-05 [08:43]
|
33'877 bytes |
|
|
[ TD 28 ]
|
2025-05-04 |
SWG 4B2 (Other Topics)
|
Working document towards a preliminary draft new Report ITU-R M.[EMG.MSS] - Development and technology of emergency communications in mobile-satellite service
|
N/A
|
|
[ TD 28 ] - English - Word |
2025-05-05 [08:48]
|
38'632 bytes |
|
|
[ TD 27 ]
|
2025-05-04 |
SWG 4B2 (Other Topics)
|
Detailed work plan for working document towards a preliminary draft new Report ITU-R M.[EMG.MSS] - Development and technology of emergency communications in mobile-satellite service
|
N/A
|
|
[ TD 27 ] - English - Word |
2025-05-05 [08:42]
|
40'036 bytes |
|
|
[ 137 ]
|
2025-05-03 |
WP 4C
|
Liaison statement to Working Party 4A (copy to Study Group 4 and Working Party 4B) - Handbook on Satellite Communications
|
N/A
|
|
[ 137 ] Part 1 - English - Word |
2025-05-04 [03:41]
|
42'786 bytes |
|
|
[ 137 ] - English - Word |
2025-05-04 [03:41]
|
75'367 bytes |
|
|
[ TD 26 ]
|
2025-05-03 |
SWG 4B1
|
[Preliminary] draft new Recommendation ITU-R M.[IMT 2020-SAT.SPECS] - Detailed specifications of the satellite radio interfaces of International Mobile Telecommunications-2020 (IMT-2020)
|
N/A
|
|
[ TD 26 ] - English - Word |
2025-05-04 [03:16]
|
758'434 bytes |
|
|
[ 136 ]
|
2025-05-01 |
ITU-T SG3
|
Liaison statement on the provisional approval of a new work item on cost models for provisioning satellite internet connectivity services
|
N/A
|
|
[ 136 ] Part 1 - English - Word |
2025-05-02 [09:41]
|
49'027 bytes |
|
|
[ 136 ] - English - Word |
2025-05-02 [09:41]
|
81'561 bytes |
|
|
[ 103 ]
|
2025-03-24 |
Alliance for Telecommunications Industry Solutions (ATIS)
|
Liaison statement from Alliance for Telecommunications Industry Solutions (ATIS) to ITU-R Working Party 4B (for information to ITU-R Working Party 5D) - 3GPP "5G-NTN" material for Recommendation ITU-R M.[IMT-2020-SAT.SPECS] - SRIT
|
N/A
|
|
[ 103 ] Revision 1 Part 2 - English - Zip (Document) |
2025-05-01 [05:31]
|
116'553 bytes |
|
|
[ 103 ] Revision 1 Part 1 - English - Zip (Document) |
2025-05-01 [05:28]
|
468'040 bytes |
|
|
[ 103 ] Revision 1 - English - Word |
2025-05-01 [05:26]
|
628'299 bytes |
|
|
[ ADM 8 ]
|
2025-04-28 |
Chair, WP 4B
|
Agenda for the fifty-sixth meeting of Working Party 4B - Shanghai, 30 April - 6 May 2025 (Physical meeting with remote participation)
|
N/A
|
|
[ ADM 8 ] - English - Word |
2025-04-29 [10:54]
|
32'422 bytes |
|
|
[ ADM 9 ]
|
2025-04-28 |
Chair, WP 4B
|
Work plan for the fifty-sixth meeting of Working Party 4B (Shanghai, 30 April - 6 May 2025)
|
N/A
|
|
[ ADM 9 ] - English - Word |
2025-04-29 [11:11]
|
34'167 bytes |
|
|
[ 135 ]
|
2025-04-28 |
BR, Study Groups Department
|
List of documents issued (Documents 4B/92 - 4B/135)
|
N/A
|
|
[ 135 ] - English - Word |
2025-04-29 [10:37]
|
41'168 bytes |
|
|
[ 134 ]
|
2025-04-17 |
Thales SA
|
Proposed modifications to working document towards a preliminary draft new Report on development and technology trends for the satellite component of IMT towards 2030 and beyond
|
N/A
|
|
[ 134 ] - English - Word |
2025-04-22 [04:23]
|
202'399 bytes |
|
|
[ 133 ]
|
2025-04-18 |
Globalstar, Inc.
|
On availability
|
N/A
|
|
[ 133 ] - English - Word |
2025-04-21 [13:15]
|
31'997 bytes |
|
Results: 79 total items.
Result Page:
1 -
2
- Next

|
Multiple Document Download: Formats and Languages to be included (when available):