|
Number |
Date
|
Source
|
Title
|
| |
Number |
Posted |
Size
|
|
| |
|
[ TD 107 ]
|
2025-10-23 |
WP 4C
|
Note to Vocabulary Rapporteur for Study Group 4: Feedback on the term "multiple-input and multiple-output (MIMO)" and its definition developed by ITU-R Working Party 5C and submitted to the CCT for validation - [Draft] reply liaison statement to Coordination Committee for Terminology (copy to ITU-T Study Groups 5, 13 and 15 and Working Parties 4B, 5A, 5D, and 6A for information)
|
|
[ TD 107 ] - English - Word |
2025-10-24 [15:07]
|
35'928 bytes |
|
| |
|
[ ADM 47 ]
|
2025-10-24 |
Chair, WP 4C
|
Agenda for the closing Plenary meeting of Working Party 4C - Friday, 24 October 2025, from 1045 to 1700 hours (Geneva time) (Physical meeting with remote participation) (Room Popov, ITU Tower)
|
|
[ ADM 47 ] Revision 1 - English - Word |
2025-10-24 [13:54]
|
43'349 bytes |
|
| |
|
[ TD 102 ]
|
2025-10-23 |
Ad-Hoc Group on Handbook
|
Draft reply liaison statement to Working Party 4A - Comments for sections 5 and 6 regarding MSS and RDSS/RNSS of the draft working document for the Handbook on Satellite Communications and Technologies
|
|
[ TD 102 ] Revision 2 - English - Word |
2025-10-24 [13:51]
|
1'203'060 bytes |
|
|
[ TD 102 ] Part 2 - English - Word |
2025-10-24 [10:59]
|
43'069 bytes |
|
|
[ TD 102 ] Part 1 - English - Word |
2025-10-24 [10:59]
|
1'144'980 bytes |
|
| |
|
[ TD 138 ]
|
2025-10-24 |
WG 4C1
|
Working document towards a preliminary draft revision of Recommendation ITU-R M.1480 - Essential technical requirements of mobile earth stations of geostationary mobile-satellite systems that are implementing the global mobile personal communications by satellite (GMPCS) - memorandum of understanding arrangements in parts of the frequency band 1-3 GHz
|
|
[ TD 138 ] - English - Word |
2025-10-24 [13:55]
|
93'312 bytes |
|
| |
|
[ TD 137 ]
|
2025-10-24 |
WG 4C1
|
Work plan for WRC-23 agenda item 1.13
|
|
[ TD 137 ] - English - Word |
2025-10-24 [13:40]
|
41'579 bytes |
|
| |
|
[ TD 140 ]
|
2025-10-24 |
WG 4C1
|
Working document towards draft CPM text for WRC-27 agenda item 1.13
|
|
[ TD 140 ] - English - Word |
2025-10-24 [13:47]
|
37'640 bytes |
|
| |
|
[ TD 139 ]
|
2025-10-24 |
WG 4C1
|
Reply liaison statement to Working Party 7B - Studies on WRC-27 agenda item 1.13
|
|
[ TD 139 ] - English - Word |
2025-10-24 [13:56]
|
44'977 bytes |
|
| |
|
[ TD 136 ]
|
2025-10-24 |
WG 4C1
|
Reply liaison statement to Working Party 5D - Studies on WRC-27 agenda item 1.13
|
|
[ TD 136 ] - English - Word |
2025-10-24 [13:45]
|
35'141 bytes |
|
| |
|
[ TD 135 ]
|
2025-10-24 |
WG 4C1
|
Working document on the possible description and functionality of MSS systems for direct connectivity between space stations and IMT user equipment
|
|
[ TD 135 ] - English - Word |
2025-10-24 [13:40]
|
1'471'721 bytes |
|
| |
|
[ TD 134 ]
|
2025-10-24 |
WG 4C1
|
Working document on sharing and compatibility studies under WRC-27 agenda item 1.13
|
|
[ TD 134 ] Part 1 - English - Word |
2025-10-24 [15:49]
|
8'145'169 bytes |
|
|
[ TD 134 ] Part 9 - English - Word |
2025-10-24 [14:05]
|
286'364 bytes |
|
|
[ TD 134 ] Part 8 - English - Word |
2025-10-24 [14:04]
|
47'069 bytes |
|
|
[ TD 134 ] Part 7 - English - Word |
2025-10-24 [14:03]
|
1'520'070 bytes |
|
|
[ TD 134 ] - English - Word |
2025-10-24 [14:01]
|
3'020'876 bytes |
|
|
[ TD 134 ] Part 6 - English - Word |
2025-10-24 [14:01]
|
13'095'394 bytes |
|
|
[ TD 134 ] Part 5 - English - Word |
2025-10-24 [14:00]
|
4'756'393 bytes |
|
|
[ TD 134 ] Part 4 - English - Word |
2025-10-24 [13:57]
|
24'367'634 bytes |
|
|
[ TD 134 ] Part 3 - English - Word |
2025-10-24 [13:56]
|
6'039'576 bytes |
|
|
[ TD 134 ] Part 2 - English - Word |
2025-10-24 [13:47]
|
7'944'998 bytes |
|
| |
|
[ TD 133 ]
|
2025-10-24 |
WG 4C1
|
Draft work plan for WRC-27 agenda item 1.12
|
|
[ TD 133 ] - English - Word |
2025-10-24 [13:32]
|
47'303 bytes |
|
| |
|
[ TD 132 ]
|
2025-10-24 |
WG 4C1
|
Working document towards draft CPM text for WRC-27 agenda item 1.12
|
|
[ TD 132 ] - English - Word |
2025-10-24 [13:33]
|
48'958 bytes |
|
| |
|
[ TD 131 ]
|
2025-10-24 |
WG 4C1
|
Liaison statement to Working Party 5B - Characteristics for MSS (Earth-to-space) in the band 1 645.5-1 646.5 MHz
|
|
[ TD 131 ] - English - Word |
2025-10-24 [13:29]
|
36'615 bytes |
|
| |
|
[ TD 130 ]
|
2025-10-24 |
WG 4C1
|
Working document regarding WRC-27 agenda item 1.12 - Studies on low-data-rate non-GSO mobile-satellite systems in the mobile-satellite service
|
|
[ TD 130 ] Part 06 - English - Zip (Document) |
2025-10-24 [13:55]
|
183'840 bytes |
|
|
[ TD 130 ] Part 05 - English - Word |
2025-10-24 [13:54]
|
59'219 bytes |
|
|
[ TD 130 ] Part 04 - English - Word |
2025-10-24 [13:53]
|
6'305'820 bytes |
|
|
[ TD 130 ] Part 03 - English - Word |
2025-10-24 [13:53]
|
1'553'414 bytes |
|
|
[ TD 130 ] Part 02 - English - Word |
2025-10-24 [13:52]
|
111'083 bytes |
|
|
[ TD 130 ] Part 01 - English - Word |
2025-10-24 [13:51]
|
2'602'831 bytes |
|
|
[ TD 130 ] - English - Word |
2025-10-24 [13:48]
|
18'685'346 bytes |
|
| |
|
[ TD 129 ]
|
2025-10-24 |
WG 4C1
|
Working document relating to CPM text for WRC-27 agenda item 1.14 - New frequency allocations to the mobile-satellite service in the frequency bands 2 010-2 025 MHz (Earth-to-space) and 2 160-2 170 MHz (space-to-Earth) in Regions 1 and 3 and 2 120-2 160 MHz (space-to-Earth) in all Regions
|
|
[ TD 129 ] - English - Word |
2025-10-24 [13:24]
|
47'065 bytes |
|
| |
|
[ TD 128 ]
|
2025-10-24 |
WG 4C1
|
Detailed work plan for WRC-27 agenda item 1.14
|
|
[ TD 128 ] - English - Word |
2025-10-24 [13:25]
|
37'431 bytes |
|
| |
|
[ TD 127 ]
|
2025-10-24 |
WG 4C1
|
Working document on sharing and compatibility studies of possible new allocations to the MSS on WRC-27 agenda item 1.14
|
|
[ TD 127 ] Part 1 - English - Excel 2007 |
2025-10-24 [13:29]
|
36'261 bytes |
|
|
[ TD 127 ] - English - Word |
2025-10-24 [13:29]
|
16'047'138 bytes |
|
| |
|
[ TD 126 ]
|
2025-10-24 |
WG 4C1
|
Work plan for the revision of Recommendation ITU-R M.1184-3
|
|
[ TD 126 ] - English - Word |
2025-10-24 [13:18]
|
42'559 bytes |
|
| |
|
[ TD 125 ]
|
2025-10-24 |
WG 4C1
|
Preliminary draft revision of Recommendation ITU-R M.1184-3 - Technical characteristics of mobile satellite systems in the frequency bands below 3 GHz for use in developing criteria for sharing between the mobile-satellite service (MSS) and other services
|
|
[ TD 125 ] - English - Word |
2025-10-24 [13:21]
|
201'431 bytes |
|
| |
|
[ ADM 46 ]
|
2025-10-23 |
Chair, WG 4C1
|
Draft agenda for the third and fourth meetings of Working Group 4C1 - Thursday, 23 October 2025, from 1645 to 1800 Friday, 24 October 2025, from 0900 to 1015 (Physical meeting with remote participation) (Room Popov, ITU Tower)
|
|
[ ADM 46 ] Revision 1 - English - Word |
2025-10-24 [08:34]
|
44'257 bytes |
|
| |
|
[ TD 124 ]
|
2025-10-24 |
WG 4C1
|
Supporting material on the MSS protection criteria to be used in sharing and compatibility studies within the context of WRC-27 agenda items 1.12, 1.13, and 1.14
|
|
[ TD 124 ] - English - Word |
2025-10-24 [08:47]
|
43'916 bytes |
|
| |
|
[ TD 123 ]
|
2025-10-24 |
WG 4C1
|
Working document relating to common frequency bands - Text developed by Sub-Working Group 4C1a
|
|
[ TD 123 ] - English - Word |
2025-10-24 [08:45]
|
86'356 bytes |
|
| |
|
[ TD 122 ]
|
2025-10-24 |
WG 4C1
|
Suppression of Recommendation ITU-R M.632
|
|
[ TD 122 ] - English - Word |
2025-10-24 [08:39]
|
32'514 bytes |
|
| |
|
[ TD 121 ]
|
2025-10-24 |
WG 4C2
|
Work plan for WRC-27 agenda item 1.11
|
|
[ TD 121 ] - English - Word |
2025-10-24 [08:32]
|
46'918 bytes |
|
| |
|
[ TD 120 ]
|
2025-10-24 |
WG 4C2
|
Working document towards draft CPM text for WRC-27 agenda item 1.11
|
|
[ TD 120 ] - English - Word |
2025-10-24 [08:35]
|
51'764 bytes |
|
| |
|
[ TD 119 ]
|
2025-10-24 |
WG 4C2
|
Enabler table for system characteristics and sharing studies for WRC-27 agenda item 1.11
|
|
[ TD 119 ] Part 01 - English - Excel 2007 |
2025-10-24 [08:26]
|
42'869 bytes |
|
|
[ TD 119 ] - English - Word |
2025-10-24 [08:26]
|
88'454 bytes |
|
| |
|
[ TD 118 ]
|
2025-10-24 |
WG 4C2
|
Working document regarding WRC-27 agenda item 1.11 - Space-to-space links in the frequency bands 1 518-1 544 MHz, 1 545-1 559 MHz, 1 610-1 645.5 MHz, 1 646.5-1 660 MHz, 1 670-1 675 MHz and 2 483.5-2 500 MHz allocated to the mobile-satellite service (MSS)
|
|
[ TD 118 ] - English - Word |
2025-10-24 [08:29]
|
6'260'350 bytes |
|
| |
|
[ TD 117 ]
|
2025-10-23 |
WG 4C2
|
Draft reply liaison statement to Working Party 5B - Protection of RNSS receivers operating in 5 010-5 030 MHz from AM(R)S transmitters operating in 5 030-5 091 MHz
|
|
[ TD 117 ] - English - Word |
2025-10-23 [18:09]
|
40'501 bytes |
|
| |
|
[ TD 116 ]
|
2025-10-23 |
WG 4C2
|
Working document in support of WRC-31 preliminary agenda item 2.9 - Technical characteristics and operational objectives of emerging RNSS systems
|
|
[ TD 116 ] - English - Word |
2025-10-23 [17:55]
|
1'235'796 bytes |
|
| |
|
[ TD 115 ]
|
2025-10-23 |
WG 4C2
|
Working document towards a preliminary draft new Report ITU-R M.[RES.609] - Potential mitigation methods to ensure the aggregate equivalent power flux-density (epfd) limit on radionavigation-satellite service (RNSS) systems and networks operating in the 1 164-1 215 MHz band, from resolves 1 of Resolution 609 (Rev.WRC-07), is not exceeded
|
|
[ TD 115 ] - English - Word |
2025-10-23 [17:14]
|
396'451 bytes |
|
| |
|
[ TD 114 ]
|
2025-10-23 |
WG 4C2
|
Preliminary draft revision to Recommendation ITU-R M.1787-[6] - Description of systems and networks in the radionavigation-satellite service (space-to-Earth and space-to-space) and technical characteristics of transmitting space stations operating in the bands 1 164-1 215 MHz, 1 215-1 300 MHz and 1 559-1 610 MHz
|
|
[ TD 114 ] - English - Word |
2025-10-23 [17:34]
|
75'538 bytes |
|
Results: 61 total items.
Result Page:
1 -
2
- Next

|
Multiple Document Download: Formats and Languages to be included (when available):