Unión Internacional de Telecomunicaciones   UIT
English  Français
 
Mapa Contáctenos Copia Imprimible
  Página principal : UIT-R : R23-WP6A Nuevo -  Busque los documentos de la reunión
   
UIT-R R23-WP6A Documentos de la reunión
  Número máximo de documentos/página:
Resultados: 91 documentos
Result Page:  1 - 2  - Siguiente
Número  Fecha Origen Título Cuestiones 
  Número  Puesta a disposición Tamaño    
 
[ 191 ]  2025-10-03 CCT   Liaison statement to ITU-R Working Parties 4B, 4C, 5A, 5D and 6A (copy to ITU-T Study Groups 5, 13 and 15 for information) - Request for feedback on the term "multiple-input and multiple-output (MIMO)" and its definition developed by ITU-R Working Party 5C and submitted to the CCT for validation     N/A (no se aplica)  
  [ 191 ]  - English -  Word 2025-10-03 [16:03]  40'720  octetos  
 
[ 189 ]  2025-09-11 Chair, WP 6A   Report of the meeting of Working Party 6A (Geneva, 2-10 September 2025)     N/A (no se aplica)  
  [ 189 ]  - English -  Word 2025-10-06 [11:04]  49'874  octetos Chair's Report of the meeting of Working Party 6A (2 - 10 September 2025)  
  [ 189 ] Chapter 5 - English -  Word 2025-09-30 [08:49]  51'350  octetos Meeting Report from Sub-Working Group 6A-5 (Other issues)  
  [ 189 ] Chapter 4 - English -  Word 2025-09-30 [08:44]  56'365  octetos Meeting Report from Sub-Working Group 6A-3 (Protection)  
  [ 189 ] Chapter 3 - English -  Word 2025-09-30 [08:34]  55'433  octetos Meeting Report from Sub-Working Group 6A-3 (WRC-27 agenda items and sharing)  
  [ 189 ] Chapter 2 - English -  Word 2025-09-30 [08:29]  52'579  octetos Meeting Report from Sub-Working Group 6A-2 (Sound and Multimedia)  
  [ 189 ] Chapter 1 - English -  Word 2025-09-30 [08:19]  75'538  octetos Meeting Report from Sub-Working Group 6A-1 (Television)  
  [ 189 ] Chapter 1 - Annex 3 - English -  Word 2025-09-24 [08:09]  30'119'794  octetos Preliminary draft revision of Report ITU-R BT.2140-14 - Transition from analogue to digital terrestrial television broadcasting  
  [ 189 ] Chapter 1 - Annex 2 - English -  Word 2025-09-23 [16:48]  876'888  octetos Preliminary draft revision of Report ITU-R BT.2485-3 - Advanced network planning and transmission methods for enhancements of digital terrestrial television broadcasting  
  [ 189 ] Chapter 3 - Annex 17 - English -  Word 2025-09-23 [16:35]  42'169  octetos Note to the Director, Radiocommunication Bureau - Information on the frequency assignments to stations of terrestrial services other than broadcasting, recorded in the MIFR or in the process of being recorded, in the frequency bands between 470 MHz and 960 MHz  
  [ 189 ] Chapter 5 Annex 18 Part 1 - English -  Excel 2007 2025-09-23 [16:31]  102'113  octetos  
  [ 189 ] Chapter 5 - Annex 18 - English -  Word 2025-09-23 [16:31]  142'612  octetos Note from Working Party 6A to Radiocommunication Bureau (BR) - ITU ENG/PMSE database  
  [ 189 ] Chapter 1 - Annex 7 - English -  Word 2025-09-23 [16:09]  53'269  octetos Working document towards a preliminary draft revision of Recommendation ITU-R BT.1306-8 - Error correction, data framing, modulation and emission methods for digital terrestrial television broadcasting  
  [ 189 ] Chapter 2 - Annex 14 - English -  Word 2025-09-23 [15:57]  21'301'796  octetos Preliminary draft revision of Report ITU-R BS.2384 - Implementation considerations for the introduction and transition to digital terrestrial sound and multimedia broadcasting  
  [ 189 ] Chapter 1 - Annex 4 - English -  Word 2025-09-23 [15:41]  47'525  octetos Working document towards a preliminary draft revision of Recommendation ITU-R BT.1368-13 - Planning criteria, including protection ratios, for digital terrestrial television services in the VHF/UHF bands  
  [ 189 ] Chapter 3 - Annex 16 - English -  Word 2025-09-23 [15:32]  114'356  octetos WRC-23 Resolutions related to broadcasting services and other services - Updated information of Document 6A/181, from Radiocommunication Bureau  
  [ 189 ] Chapter 3 - Annex 15 - English -  Word 2025-09-23 [14:34]  47'138  octetos Annex to the Chair's Report - Continuation of Rapporteur Group to undertake WRC-27 studies related to Working Party 6A  
  [ 189 ] Chapter 2 - Annex 11 - Part 1 - English -  Word 2025-09-23 [14:18]  14'401'536  octetos  
  [ 189 ] Chapter 1 - Annex 9 - English -  Word 2025-09-23 [14:17]  43'563  octetos Proposed revision to the Terms of Reference for the Working Party 6A Rapporteur Group to review Study Group 6 documentation on digital terrestrial broadcasting systems  
  [ 189 ] Chapter 1 - Annex 8 - English -  Word 2025-09-23 [14:16]  47'928  octetos Working document towards a preliminary draft revision of Recommendation ITU-R BT.2016-4 - Error-correction, data framing, modulation and emission methods for terrestrial multimedia broadcasting for mobile reception using handheld receivers in VHF/UHF bands  
  [ 189 ] Chapter 2 - Annex 11 - English -  Word 2025-09-23 [14:16]  12'533'805  octetos Working document towards a preliminary draft revision of ITU-R Handbook - HF broadcasting system design  
  [ 189 ] Chapter 1 - Annex 10 - English -  Word 2025-09-23 [14:14]  43'324  octetos Proposed continuation of the "Rapporteur Group on revision of ITU-R texts to include ATSC 3.0"  
  [ 189 ] Chapter 2 - Annex 13 - English -  Word 2025-09-23 [14:13]  61'246  octetos Working document towards a preliminary revision of Recommendation ITU-R BS.774-4 - Service requirements for digital sound broadcasting to vehicular, portable and fixed receivers using terrestrial transmitters in the VHF/UHF bands  
  [ 189 ] Chapter 2 - Annex 12 - English -  Word 2025-09-23 [13:46]  42'519  octetos Terms of Reference for Rapporteur Group on the revision of the Handbook "HF Broadcasting System Design"  
  [ 189 ] Chapter 1 - Annex 6 - English -  Word 2025-09-23 [13:22]  103'679  octetos Preliminary draft revision of Recommendation ITU-R BT.1877-3 - Error-correction, data framing, modulation and emission methods and selection guidance for second generation digital terrestrial television broadcasting systems  
  [ 189 ] Chapter 1 - Annex 5 - English -  Word 2025-09-23 [11:57]  1'855'643  octetos Preliminary draft revision of Report ITU-R BT.2343-10 - Collection of field trials of ultra high definition television over digital terrestrial television broadcasting networks  
  [ 189 ] Chapter 1 - Annex 1 - English -  Word 2025-09-23 [10:41]  47'782  octetos Preliminary draft revision of Report ITU-R BT.2386-5 - Digital terrestrial broadcasting: Design and implementation of single frequency networks (SFN)  
 
[ INF 2 ]  2024-07-05 Interim Chair, SG 6   Functions of the Study Group 6 Vice-Chairs and Working Parties Chairs     N/A (no se aplica)  
  [ INF 2 ] Revision 4 - English -  Word 2025-09-26 [11:22]  60'164  octetos  
 
[ 190 ]  2025-09-25 WP 6B   Reply liaison statement to Working Party 6A - Review of DTB documentation within the remit of Working Party 6B     N/A (no se aplica)  
  [ 190 ]  - English -  Word 2025-09-26 [11:26]  46'383  octetos  
 
[ ADM 29 ]  2025-09-10 SG 6 & Wps 6A, 6B & 6C   Provisional schedules of 2026/2027 meetings of Study Group 6 and its Working Parties     N/A (no se aplica)  
  [ ADM 29 ] Revision 1 - English -  Word 2025-09-11 [10:55]  34'364  octetos  
 
[ 188 ]  2025-09-11 Director, BR   Final list of participants - Working Party 6A (Geneva, 2-10 September 2025)     N/A (no se aplica)  
  [ 188 ]  - English -  PDF (acrobat) 2025-09-11 [08:16]  150'648  octetos  
 
[ ADM 30 ]  2025-09-10 Chair, WP 6A   Draft agenda for the closing Plenary meeting of Working Party 6A - Wednesday, 10 September 2025, from 1400 to 1515 and from 1545 to1700 hours (Geneva time) (Physical meeting with remote participation) (Room Popov, Tower)     N/A (no se aplica)  
  [ ADM 30 ] Revision 1 - English -  Word 2025-09-10 [13:23]  42'042  octetos  
 
[ ADM 28 ]  2025-09-09 Chair, WP 6A   Draft Agenda for the Third Plenary Meeting of Working Party 6A - Tuesday, 9 September 2025, from 1545 to1700 hours (Geneva time) (Physical meeting with remote participation) (Room Popov, Tower)     N/A (no se aplica)  
  [ ADM 28 ]  - English -  Word 2025-09-09 [13:43]  39'542  octetos  
 
[ ADM 23 ]  2025-08-28 SG 6, WPs 6A, 6B & 6C   Tentative schedule for Working Parties 6A, 6B and 6C, and Study Group 6     N/A (no se aplica)  
  [ ADM 23 ] Revision 4 - English -  Word 2025-09-08 [10:36]  47'499  octetos  
 
[ ADM 25 ]  2025-08-29 Chair, WP 6A   Work structure and assignment of documents     N/A (no se aplica)  
  [ ADM 25 ] Revision 3 - English -  Word 2025-09-05 [12:00]  37'064  octetos  
 
[ ADM 27 ]  2025-09-05 Chair, WP 6A   Draft agenda for the second Plenary meeting of Working Party 6A Friday, 5 September 2025, 1045-1110 hours (Geneva time) (Room H, Montbrillant)     N/A (no se aplica)  
  [ ADM 27 ]  - English -  Word 2025-09-05 [10:00]  33'765  octetos  
 
[ 187 ]  2025-09-01 BR, Study Groups Department   List of documents issued (Documents 6A/140 - 6A/187)     N/A (no se aplica)  
  [ 187 ]  - English -  Word 2025-09-01 [09:04]  43'691  octetos  
 
[ 186 ]  2025-09-01 RG on SAB/SAP Issues   Report for Working Party 6A block meeting of September 2025     N/A (no se aplica)  
  [ 186 ] Part 1 - English -  Excel 2007 2025-09-01 [09:08]  102'076  octetos  
  [ 186 ]  - English -  Word 2025-09-01 [09:08]  139'734  octetos  
 
[ ADM 26 ]  2025-08-29 Chair, WP 6A   Draft agenda for the first Plenary meeting of Working Party 6A - Tuesday, 2 September 2025, 0930 to 1045 hours (Geneva time) (Physical meeting with remote participation) (Room H, Montbrillant)     N/A (no se aplica)  
  [ ADM 26 ] Revision 1 - English -  Word 2025-09-01 [08:52]  40'766  octetos  
 
[ ADM 24 ]  2025-08-29 Interim Chair, SG 6   Proposed treatment of contributions submitted to multiple Working Parties     N/A (no se aplica)  
  [ ADM 24 ]  - English -  Word 2025-08-29 [15:41]  37'664  octetos  
 
[ 185 ]  2025-08-29 Interim Chair, SG 6   Compiled Reports of the Study Group 6 Liaison Rapporteurs     N/A (no se aplica)  
  [ 185 ] Part 4 - English -  Word 2025-08-29 [10:49]  58'418  octetos  
  [ 185 ] Part 3 - English -  Word 2025-08-29 [10:49]  48'600  octetos  
  [ 185 ] Part 2 - English -  Word 2025-08-29 [10:48]  45'075  octetos  
  [ 185 ] Part 1 - English -  Word 2025-08-29 [10:48]  469'977  octetos  
  [ 185 ]  - English -  Word 2025-08-29 [10:48]  655'615  octetos  
 
[ INF 6 ]  2025-08-26 BR, Study Groups Department   Guidelines on the management of fully virtual meetings and physical meetings with remote participation     N/A (no se aplica)  
  [ INF 6 ]  - English -  Word 2025-08-27 [09:36]  43'683  octetos  
 
[ INF 5 ]  2025-08-26 BR Study Groups Department   Meetings of Working Parties 6A, 6B and 6C, and Study Group 6 (Geneva, 1-12 September 2025)     N/A (no se aplica)  
  [ INF 5 ] Part 1 - English -  PowerPoint 2007 2025-08-26 [16:05]  4'450'148  octetos  
  [ INF 5 ]  - English -  Word 2025-08-26 [16:05]  5'178'714  octetos  
 
[ 184 ]  2025-08-25 RG-FOB   Rapporteur Group - Future of Broadcasting Progress Report March to August 2025 (copy to Working Parties 6A, 6B and 6C)     N/A (no se aplica)  
  [ 184 ]  - English -  Word 2025-08-25 [17:07]  39'582  octetos  
Resultados: 91 documentos
Result Page:  1 - 2  - Siguiente
 
Telecarga de múltiples documentos: Marcar las casillas correspondientes a los documentos seleccionados, a continuación pulsar "Telecargar"
   
 
Preferencias del usuario: 
Telecarga de múltiples documentos: Formatos e idiomas que hay que tener en cuenta (si están disponibles):
Páginas de navegación HTML Si  
Formatos doc pdf zip  + Otros formatos
Idiomas (máximo 2) E F S A C R  + Multilingüe  
(E: inglés - F: francés - S: español - A: árabe - C: chino - R: ruso)

Comienzo de la página -  Comentarios -  Contáctenos -  Copyright © UIT 2008 Reservados todos los derechos
Contacto público :  Coordenador de Web UIT-R
Actualizado el : 2025-10-06