Union Internationale des Télécommunications   UIT
English  Español
 
Plan du site Contactez-nous Copie Imprimable
  Page d'accueil : UIT-T : SG06 : Réunion 2005-12-12 : Documents Temporaires  Ajoutés récemment -  Recherche de documents de réunion
   
UIT-T SG06  TD-GEN (2005-12-12) 

UIT-T SG06

Installations extérieures et installations intérieures connexes

Période d'études 2005

Réunion  du 2005-12-12 au 2005-12-16

Lieu : Suisse [Genève]

Autres réunions : 2009-10-12  2008-12-01  2008-04-14  2007-11-19  2007-05-14  2006-09-19  [ 2005-12-12 ]  2005-01-31 

Resultats:62 documents
Résultats :  1 - 2  - Suivant Next
Documents Temporaires  (GEN)   Documents / Contributions
 
Numéro 
Titre Source AI/Question
Date
[ 116-GEN ]  
 
Ad hoc discussion on the future directions for SG 6     SG 6 Chairman a.i.   QALL/6   2005-12-16
[ 115-GEN ]  
(Rev.1) 
Draft report of the second meeting of Study Group 6 "Outside Plant and related indoor installations" (Geneva, 12 - 16 December 2005)     Chairman SG 6 a.i.   QALL/6   2005-12-15
[ 114-GEN ]  
+Corr.1 
Liste final des participants - Final list of participants - Lista final de participantes     TSB   QALL/6   2005-12-16
[ 113-GEN ]  
(Rev.1) 
Draft Report of Working Party 2/6 - Application of products     WP 2/6 Chairman   Q9/6, Q8/6, Q7/6, Q6/6, Q5/6   2005-12-15
[ 112-GEN ]  
(Rev.1) 
Draft WP 1/6 Report - Infrastructures and Environment     WP 1/6 Chair   Q4/6, Q3/6, Q2/6, Q1/6   2005-12-15
[ 111-GEN ]  
 
LS to IEC SC86B on Recommendation on mechanical and environmental requirements for PON splitters for Outside Plant Networks     IEC SC86B Liaison Officer and Q9/6 Rapporteur   Q9/6   2005-12-15
[ 110-GEN ]  
 
LS reply on PON 1xN splitters     SG 15 Liaison Officer and Rapporteur Q9/6   Q9/6   2005-12-13
[ 109-GEN ]  
 
Reply LS on inquiry for the development of G.650.3     SG 15 Liaison Officer   Q6/6, Q2/6   2005-12-13
[ 108-GEN ]  
(Rev.1) 
LS to SG 15, Q6/15 and Q7/15 on information on catastrophic failure induced by high power     SG 15 Liaison Officer and Q6/6 Rapporteur   Q6/6   2005-12-13
[ 107-GEN ]  
(Rev.1) 
LS to IEC SC86A/ WG1 on Information on catastrophic failure induced by high power     IEC 86A Liaison Officer and Q6/6 Rapporteur   Q6/6   2005-12-13
[ 106-GEN ]  
(Rev.1) 
Draft revised text for ITU-T Rec. L.30 "Markers on Marinized Terrestrial Cables" (for discussion)     Editor L.30   Q7/6, Q2/6   2005-12-13
[ 105-GEN ]  
+Add.1-2 
Draft Agenda for the joint meeting of Study Group 5 and Study Group 6     TSB   QALL/6   2005-12-13
[ 104-GEN ]  
+Add.1 
Paper presented at the 54th International Wire and Cable Symposium - for information     Chairman SG 6   QALL/6   2005-12-12
[ 103-GEN ]  
 
Revised Study Plan for Question 3/6 (Technical aspects related to the unbundling and sharing of outside plant elements in copper and optical networks)     Rapporteur Q3/6   Q3/6   2005-12-12
[ 102-GEN ]  
 
Draft agenda and allocation of documents for WP 2/6     WP 2/6 Chairman a.i.   Q9/6, Q8/6, Q7/6, Q6/6, Q5/6   2005-12-09
[ 101-GEN ]  
 
Draft agenda and allocation of documents for WP 1/6     WP 1/6 Chairman a.i.   Q4/6, Q3/6, Q2/6, Q1/6   2005-12-09
[ 100-GEN ]  
 
New work on high optical power safety issues in TC76     IEC 86A Liaison Officer   Q8/6, Q7/6, Q6/6, Q2/6   2005-12-08
[ 99-GEN ]  
 
IEC 86A: Highlights of October 2005 meetings     IEC 86A Liaison Officer   Q8/6, Q7/6, Q6/6, Q2/6   2005-12-08
[ 98-GEN ]  
 
WSIS Highlights for ITU-T Study Group 6     TSB   QALL/6   2005-12-08
[ 97-GEN ]  
 
Summary of responses to TSB Circular 27 (Questionnaire on passive optical components in outside plant networks)     Rapporteur Q9/6   Q9/6   2005-12-06
[ 96-GEN ]  
 
Summary of responses to TSB Circular 26 (Questionnaire on active electronics in outside plant networks)     Rapporteur Q9/6   Q9/6   2005-12-06
[ 95-GEN ]  
 
Draft new Recommendation L.SCFIA "Small count optical fibre cables for indoor applications"     Rapporteur Q7/6   Q7/6   2005-11-28
[ 94-GEN ]  
 
Summary of replies to TSB Circular 34     Rapporteur Q7/6   Q7/6   2005-11-28
[ 93-GEN ]  
 
Introduction to ITU-T's Technology Watch activity     TSB   QALL/6   2005-11-25
[ 92-GEN ]  
 
Draft Report of TSB Director's Ad Hoc Group on Intellectual Property Rights (IPR), Geneva, 1-2 November 2005 (as of 7 November 2005)     TSB Director's Ad Hoc Group on IPR   QALL/6   2005-11-25
[ 91-GEN ]  
 
Report of the TSB Director's ad hoc Group on Intellectual Property Rights (IPR) - Geneva, 11-12 Mar 2005)     TSB Director's Ad Hoc group on IPR   QALL/6   2005-11-25
[ 90-GEN ]  
 
Work Programme for Study Group 6     TSB   QALL/6   2005-11-29
[ 89-GEN ]  
 
List of Temporary Documents for Study Group 6 Meeting (Geneva, 12-16 December 2005)     TSB   QALL/6   2005-12-09
[ 88-GEN ]  
 
List of Reports, White and Delayed Contributions for Study Group 6 Meeting (Geneva, 12 - 16 December 2005)     TSB   QALL/6   2005-12-02
[ 87-GEN ]  
(Rev.1) 
Information for the Study Group 6 Meeting (Geneva, 12-16 December 2005)     TSB   QALL/6   2005-12-09
[ 86-GEN ]  
 
Draft Agenda and Work Planf for Study Group 6 Meeting (Geneva, 12-16 December 2005)     TSB   QALL/6   2005-12-09
[ 85-GEN ]  
 
LS on Request for registration and dissemination of ITU-T Technology Watch function     TSAG (Geneva, 7-11 November 2005)   QALL/6   2005-11-22
[ 84-GEN ]  
 
LS on Archiving of Rapporteur Group Meeting Documents     TSAG (Geneva, 7-11 November 2005)   QALL/6   2005-11-22
[ 83-GEN ]  
 
LS on SG 17 guidance to TSAG and Study Groups on how ITU-T could strengthen its role in conformance and interoperability testing     ITU-T SG 17   QALL/6   2005-11-22
[ 82-GEN ]  
 
LS on Work on Telecommunications for Disaster Relief and Early Warning and an Action Plan (TDR/EW)     ITU-T SG 17   QALL/6   2005-11-22
[ 81-GEN ]  
 
LS on Status of Action Plan to address WTSA-04 Resolution 50 - Cybersecurity obligations     ITU-T SG 17   QALL/6   2005-11-22
[ 80-GEN ]  
 
LS on SG 17 Action Plan for developing countries and countries with economies in transition (DC-CET)     ITU-T SG 17   QALL/6   2005-11-22
[ 79-GEN ]  
 
Summary of replies received to the Questionnaire on "RFID technology for telecommunication network maintenance support" (TSB Circular 31)     Rapporteur Q4/6   Q4/6   2005-10-28
[ 78-GEN ]  
 
LS on official contacts in ITU-T SG 9     ITU-T SG 9   QALL/6   2005-10-28
[ 77-GEN ]  
 
Liaison reply to TSAG (LS01-TSAG) on Work on Telecommunications for Disaster Relief and Early Warning and an Action Plan     ITU-T SG 9   QALL/6   2005-10-28
[ 76-GEN ]  
 
LS on Work on Telecommunications for Disaster Relief and Early Warning and an Action Plan (TDR/EW)     ITU-T SG 17   QALL/6   2005-10-27
[ 75-GEN ]  
 
LS on Status of Action Plan to address WTSA-04 Resolution 50 - Cybersecurity obligations     ITU-T SG 17   Q9/6, Q8/6, Q6/6, Q5/6, Q4/6, Q3/6, Q2/6   2005-10-27
[ 74-GEN ]  
 
LS on Study Group 17 Action Plan for developing countries and countries with economies in transition (DC-CET)     ITU-T SG 17   QALL/6   2005-10-27
[ 73-GEN ]  
 
LS on SG 17 guidance to TSAG and Study Groups on how ITU-T could strengthen its role in conformance and interoperability testing     ITU-T SG 17   QALL/6   2005-10-27
[ 72-GEN ]  
+Add.1 
LS on NGN Management Focus Group     ITU-T SG 4   QALL/6   2005-10-13
[ 71-GEN ]  
 
Reply to LS from TSAG on Work on Telecommunications for Disaster Relief and Early Warning and an Action Plan     ITU-T SG 19   QALL/6   2005-09-14
[ 70-GEN ]  
 
LS on Study Group 11 action plan for developing countries and countries with economies in transition     ITU-T SG 11   QALL/6   2005-09-14
[ 69-GEN ]  
 
Reply to LS on Work on Telecommunications for Disaster Relief and Early Warning and an Action Plan     ITU-T SG 16   QALL/6   2005-08-17
[ 68-GEN ]  
 
LS on Promotion of the participation of research and academic experts in the SG work     ITU-T SG 16 (Q20/16)   QALL/6   2005-08-17
[ 67-GEN ]  
 
Response to LS on Relationship and liaison between ITU-T SG 6 (Q9/6) and SG 15 (Q7/15)     ITU-T SG 15   Q9/6   2005-06-08
Resultats:62 documents
Résultats :  1 - 2  - Suivant Next
 
Téléchargement de multiples documents: Cocher les cases correspondant aux documents sélectionnés, puis appuyer sur "Télécharger"
   
 
Préférences utilisateur: 
Téléchargement de multiples documents: Formats et langues à prendre en compte (si disponibles):
Pages de navigation HTML  
Formats  + Autres formats
Langues (maximum 2)  + Multilingue 
(E: Anglais - F: Français - S: Espagnol - A: Arabe - C: Chinois - R: Russe)

Testez ITU Translate pour la traduction automatique de documents
Début de page -  Commentaires -  Contactez-nous -  Droits d'auteur © UIT 2008 Tous droits réservés
Contact pour cette page :  TSB EDH
Mis à jour le : 2024-11-10