Documents Temporaires
(GEN)
|
|
Numéro
|
Titre
|
Source
|
AI/Question
|
Date
|
|
[ 116-GEN ]
|
Ad hoc discussion on the future directions for SG 6
|
SG 6 Chairman a.i.
|
QALL/6
|
2005-12-16 |
|
[ 115-GEN ]
(Rev.1) |
Draft report of the second meeting of Study Group 6 "Outside Plant and related indoor installations" (Geneva, 12 - 16 December 2005)
|
Chairman SG 6 a.i.
|
QALL/6
|
2005-12-15 |
|
[ 114-GEN ]
+Corr.1 |
Liste final des participants - Final list of participants - Lista final de participantes
|
TSB
|
QALL/6
|
2005-12-16 |
|
[ 113-GEN ]
(Rev.1) |
Draft Report of Working Party 2/6 - Application of products
|
WP 2/6 Chairman
|
Q9/6, Q8/6, Q7/6, Q6/6, Q5/6
|
2005-12-15 |
|
[ 112-GEN ]
(Rev.1) |
Draft WP 1/6 Report - Infrastructures and Environment
|
WP 1/6 Chair
|
Q4/6, Q3/6, Q2/6, Q1/6
|
2005-12-15 |
|
[ 111-GEN ]
|
LS to IEC SC86B on Recommendation on mechanical and environmental requirements for PON splitters for Outside Plant Networks
|
IEC SC86B Liaison Officer and Q9/6 Rapporteur
|
Q9/6
|
2005-12-15 |
|
[ 110-GEN ]
|
LS reply on PON 1xN splitters
|
SG 15 Liaison Officer and Rapporteur Q9/6
|
Q9/6
|
2005-12-13 |
|
[ 109-GEN ]
|
Reply LS on inquiry for the development of G.650.3
|
SG 15 Liaison Officer
|
Q6/6, Q2/6
|
2005-12-13 |
|
[ 108-GEN ]
(Rev.1) |
LS to SG 15, Q6/15 and Q7/15 on information on catastrophic failure induced by high power
|
SG 15 Liaison Officer and Q6/6 Rapporteur
|
Q6/6
|
2005-12-13 |
|
[ 107-GEN ]
(Rev.1) |
LS to IEC SC86A/ WG1 on Information on catastrophic failure induced by high power
|
IEC 86A Liaison Officer and Q6/6 Rapporteur
|
Q6/6
|
2005-12-13 |
|
[ 106-GEN ]
(Rev.1) |
Draft revised text for ITU-T Rec. L.30 "Markers on Marinized Terrestrial Cables" (for discussion)
|
Editor L.30
|
Q7/6, Q2/6
|
2005-12-13 |
|
[ 105-GEN ]
+Add.1-2 |
Draft Agenda for the joint meeting of Study Group 5 and Study Group 6
|
TSB
|
QALL/6
|
2005-12-13 |
|
[ 104-GEN ]
+Add.1 |
Paper presented at the 54th International Wire and Cable Symposium - for information
|
Chairman SG 6
|
QALL/6
|
2005-12-12 |
|
[ 103-GEN ]
|
Revised Study Plan for Question 3/6 (Technical aspects related to the unbundling and sharing of outside plant elements in copper and optical networks)
|
Rapporteur Q3/6
|
Q3/6
|
2005-12-12 |
|
[ 102-GEN ]
|
Draft agenda and allocation of documents for WP 2/6
|
WP 2/6 Chairman a.i.
|
Q9/6, Q8/6, Q7/6, Q6/6, Q5/6
|
2005-12-09 |
|
[ 101-GEN ]
|
Draft agenda and allocation of documents for WP 1/6
|
WP 1/6 Chairman a.i.
|
Q4/6, Q3/6, Q2/6, Q1/6
|
2005-12-09 |
|
[ 100-GEN ]
|
New work on high optical power safety issues in TC76
|
IEC 86A Liaison Officer
|
Q8/6, Q7/6, Q6/6, Q2/6
|
2005-12-08 |
|
[ 99-GEN ]
|
IEC 86A: Highlights of October 2005 meetings
|
IEC 86A Liaison Officer
|
Q8/6, Q7/6, Q6/6, Q2/6
|
2005-12-08 |
|
[ 98-GEN ]
|
WSIS Highlights for ITU-T Study Group 6
|
TSB
|
QALL/6
|
2005-12-08 |
|
[ 97-GEN ]
|
Summary of responses to TSB Circular 27 (Questionnaire on passive optical components in outside plant networks)
|
Rapporteur Q9/6
|
Q9/6
|
2005-12-06 |
|
[ 96-GEN ]
|
Summary of responses to TSB Circular 26 (Questionnaire on active electronics in outside plant networks)
|
Rapporteur Q9/6
|
Q9/6
|
2005-12-06 |
|
[ 95-GEN ]
|
Draft new Recommendation L.SCFIA "Small count optical fibre cables for indoor applications"
|
Rapporteur Q7/6
|
Q7/6
|
2005-11-28 |
|
[ 94-GEN ]
|
Summary of replies to TSB Circular 34
|
Rapporteur Q7/6
|
Q7/6
|
2005-11-28 |
|
[ 93-GEN ]
|
Introduction to ITU-T's Technology Watch activity
|
TSB
|
QALL/6
|
2005-11-25 |
|
[ 92-GEN ]
|
Draft Report of TSB Director's Ad Hoc Group on Intellectual Property Rights (IPR), Geneva, 1-2 November 2005 (as of 7 November 2005)
|
TSB Director's Ad Hoc Group on IPR
|
QALL/6
|
2005-11-25 |
|
[ 91-GEN ]
|
Report of the TSB Director's ad hoc Group on Intellectual Property Rights (IPR) - Geneva, 11-12 Mar 2005)
|
TSB Director's Ad Hoc group on IPR
|
QALL/6
|
2005-11-25 |
|
[ 90-GEN ]
|
Work Programme for Study Group 6
|
TSB
|
QALL/6
|
2005-11-29 |
|
[ 89-GEN ]
|
List of Temporary Documents for Study Group 6 Meeting (Geneva, 12-16 December 2005)
|
TSB
|
QALL/6
|
2005-12-09 |
|
[ 88-GEN ]
|
List of Reports, White and Delayed Contributions for Study Group 6 Meeting (Geneva, 12 - 16 December 2005)
|
TSB
|
QALL/6
|
2005-12-02 |
|
[ 87-GEN ]
(Rev.1) |
Information for the Study Group 6 Meeting (Geneva, 12-16 December 2005)
|
TSB
|
QALL/6
|
2005-12-09 |
|
[ 86-GEN ]
|
Draft Agenda and Work Planf for Study Group 6 Meeting (Geneva, 12-16 December 2005)
|
TSB
|
QALL/6
|
2005-12-09 |
|
[ 85-GEN ]
|
LS on Request for registration and dissemination of ITU-T Technology Watch function
|
TSAG (Geneva, 7-11 November 2005)
|
QALL/6
|
2005-11-22 |
|
[ 84-GEN ]
|
LS on Archiving of Rapporteur Group Meeting Documents
|
TSAG (Geneva, 7-11 November 2005)
|
QALL/6
|
2005-11-22 |
|
[ 83-GEN ]
|
LS on SG 17 guidance to TSAG and Study Groups on how ITU-T could strengthen its role in conformance and interoperability testing
|
ITU-T SG 17
|
QALL/6
|
2005-11-22 |
|
[ 82-GEN ]
|
LS on Work on Telecommunications for Disaster Relief and Early Warning and an Action Plan (TDR/EW)
|
ITU-T SG 17
|
QALL/6
|
2005-11-22 |
|
[ 81-GEN ]
|
LS on Status of Action Plan to address WTSA-04 Resolution 50 - Cybersecurity obligations
|
ITU-T SG 17
|
QALL/6
|
2005-11-22 |
|
[ 80-GEN ]
|
LS on SG 17 Action Plan for developing countries and countries with economies in transition (DC-CET)
|
ITU-T SG 17
|
QALL/6
|
2005-11-22 |
|
[ 79-GEN ]
|
Summary of replies received to the Questionnaire on "RFID technology for telecommunication network maintenance support" (TSB Circular 31)
|
Rapporteur Q4/6
|
Q4/6
|
2005-10-28 |
|
[ 78-GEN ]
|
LS on official contacts in ITU-T SG 9
|
ITU-T SG 9
|
QALL/6
|
2005-10-28 |
|
[ 77-GEN ]
|
Liaison reply to TSAG (LS01-TSAG) on Work on Telecommunications for Disaster Relief and Early Warning and an Action Plan
|
ITU-T SG 9
|
QALL/6
|
2005-10-28 |
|
[ 76-GEN ]
|
LS on Work on Telecommunications for Disaster Relief and Early Warning and an Action Plan (TDR/EW)
|
ITU-T SG 17
|
QALL/6
|
2005-10-27 |
|
[ 75-GEN ]
|
LS on Status of Action Plan to address WTSA-04 Resolution 50 - Cybersecurity obligations
|
ITU-T SG 17
|
Q9/6, Q8/6, Q6/6, Q5/6, Q4/6, Q3/6, Q2/6
|
2005-10-27 |
|
[ 74-GEN ]
|
LS on Study Group 17 Action Plan for developing countries and countries with economies in transition (DC-CET)
|
ITU-T SG 17
|
QALL/6
|
2005-10-27 |
|
[ 73-GEN ]
|
LS on SG 17 guidance to TSAG and Study Groups on how ITU-T could strengthen its role in conformance and interoperability testing
|
ITU-T SG 17
|
QALL/6
|
2005-10-27 |
|
[ 72-GEN ]
+Add.1 |
LS on NGN Management Focus Group
|
ITU-T SG 4
|
QALL/6
|
2005-10-13 |
|
[ 71-GEN ]
|
Reply to LS from TSAG on Work on Telecommunications for Disaster Relief and Early Warning and an Action Plan
|
ITU-T SG 19
|
QALL/6
|
2005-09-14 |
|
[ 70-GEN ]
|
LS on Study Group 11 action plan for developing countries and countries with economies in transition
|
ITU-T SG 11
|
QALL/6
|
2005-09-14 |
|
[ 69-GEN ]
|
Reply to LS on Work on Telecommunications for Disaster Relief and Early Warning and an Action Plan
|
ITU-T SG 16
|
QALL/6
|
2005-08-17 |
|
[ 68-GEN ]
|
LS on Promotion of the participation of research and academic experts in the SG work
|
ITU-T SG 16 (Q20/16)
|
QALL/6
|
2005-08-17 |
|
[ 67-GEN ]
|
Response to LS on Relationship and liaison between ITU-T SG 6 (Q9/6) and SG 15 (Q7/15)
|
ITU-T SG 15
|
Q9/6
|
2005-06-08 |
Resultats:62 documents Résultats :
1 -
2
- Suivant
|
Téléchargement de multiples documents: Formats et langues à prendre en compte (si disponibles):