International Telecommunication Union   ITU
Français  Español
 
Site map Contact Us Print version
  Home : ITU-T : SG05 : Meeting 2009-05-25 : Contributions  Recently posted -  Search Meeting Documents
   
ITU-T SG05  C (2009-05-25) 

ITU-T SG05

ICT and climate change

Study Period 2009

Meeting  from 2009-05-25 to 2009-05-29

held in Switzerland [Geneva]

Other Meetings : 2012-10-08  2012-04-11  2011-09-20  2011-04-27  2010-11-23  2010-10-01  2010-04-12  2010-01-19  2009-10-12  2008-11-24 

Results:22 total items.
Contributions  Documents / Contributions
 
Number 
Title Source AI/Question
Date
[ 39 ]  
 
Comments and suggestions for an automatic long term EMF measurement system     Swisscom Ltd.   Q3/5   2009-05-19
[ 38 ]  
 
Draft Revision of Rec. K.30rev/K.ocp     Bourns Inc.   Q13/5   2009-05-19
[ 37 ]  
 
Proposed new question and their related Study Groups on 'Energy Saving Requirements for ICTs over the lifecycle'     BT , FT , Telecom Italia   QALL/5   2009-05-15
[ 36 ]  
 
Proposed new question and their related Study Groups on 'ICTs for GHG abatement in buildings'     BT   QALL/5   2009-05-15
[ 35 ]  
 
Proposed new question and their related Study Groups on 'ICTs for GHG reduction by travel substitution'     BT   QALL/5   2009-05-15
[ 34 ]  
 
Proposed new question and related Study Groups on 'Technologies for Carbon Labelling over the Lifecycle"     BT , NSN Germany   QALL/5   2009-05-15
[ 33 ]  
 
Determination of Relevant Measurement Points     ANATEL, Brazil   Q3/5   2009-05-15
[ 32 ]  
 
Inputs from Brazil to K.Guide     ANATEL, Brazil   Q3/5   2009-05-15
[ 31 ]  
 
Working document toward draft new Recommendation K.guide     Telekomunikacja Polska, Poland   Q3/5   2009-05-14
[ 30 ]  
 
Editorial errors in ITU-T Recommendation K.52     Telekomunikacja Polska, Poland   Q3/5   2009-05-14
[ 29 ]  
 
Comparison between measurement and calculations of the EMF     Telekomunikacja Polska, Poland   Q3/5   2009-05-14
[ 28 ]  
 
A proposal on the structure of a new WP for climate change issues     Republic of Korea   QALL/5   2009-05-14
[ 27 ]  
 
Field experiments to confirm the error rate by deviated potential probe positioning in the fall-of-potential earth resistance measurement method     Republic of Korea   Q6/5   2009-05-14
[ 26 ]  
 
Test results on conductive coupling effects when measure induced voltage on telecommunication line near a.c. traction line with AT feeding system in Korea     KT, Korea   Q9/5   2009-05-14
[ 25 ]  
 
Proposal of measurement time reduction for exposure assessment     Republic of Korea   Q3/5   2009-05-14
[ 24 ]  
 
Proposed new questions and their related Study Groups on ICT and Climate Change     NTT , BT , FT , Fujitsu   QALL/5   2009-05-14
[ 23 ]  
 
Proposed test condition for PTN immunity test     ZTE Corporation   Q12/5   2009-05-14
[ 22 ]  
 
Proposal for Recommendation K.guide: Calculation and measurements for exposure assessment of adaptive antennas     China Mobile Communications Corp.   Q3/5   2009-05-14
[ 21 ]  
 
Conducted electromagnetic environment research in home networking     MIIT, China   Q8/5   2009-05-14
[ 20 ]  
 
Test results of "Broadband impulsive conducted disturbances"     CIAJ   Q8/5   2009-05-14
[ 19 ]  
 
Measurement time for EMF exposure assessment     Thailand   Q3/5   2009-05-14
[ 18 ]  
 
Automatic Long Term EMF Measurement System     Germany   Q3/5   2009-04-08
Results:22 total items.
 
Multiple Document Download: Check the boxes of the selected documents, then click "Zip and download"
   
 
User preferences: 
Multiple Document Download: Formats and Languages to be included (when available):
HTML Navigation Pages  
Formats  + Other formats
Languages (maximum 2)  + Multilingual 
(E: English - F: French - S: Spanish - A: Arabic - C: Chinese - R: Russian)

Test ITU Translate for automated document translation
Top -  Feedback -  Contact Us -  Copyright © ITU 2008 All Rights Reserved
Contact for this page :  TSB EDH
Updated : 2024-11-19