Contributions |
|
Numéro
|
Titre
|
Source
|
AI/Question
|
Date
|
|
[ 338 ]
|
G.8032 SF and FS
|
Alcatel-Lucent, AimValley BV
|
Q9/15
|
2008-11-28 |
|
[ 337 ]
|
G.lt: Update to SELT-PMD draft text
|
Alcatel-Lucent Bell N.V.
|
Q4/15
|
2008-11-28 |
|
[ 336 ]
|
G.984.4 Implementer's Guide
|
Huawei Technologies Co.,Ltd.
|
Q2/15
|
2008-11-26 |
|
[ 335 ]
|
Signal Degrade (SD) triggered protection switching
|
Huawei Technologies Co., Ltd.
|
Q9/15
|
2008-11-26 |
|
[ 334 ]
|
Proposal on the link recovery in case of multiple failures in G.8032
|
Huawei Technologies Co., Ltd.
|
Q9/15
|
2008-11-26 |
|
[ 333 ]
|
Proposal on the ring node initialization in G.8032
|
Huawei Technologies Co., Ltd.
|
Q9/15
|
2008-11-26 |
|
[ 332 ]
|
Proposal on flush optimization support in G.8032
|
Huawei Technologies Co., Ltd.
|
Q9/15
|
2008-11-26 |
|
[ 331 ]
|
Proposal on non-revertive mode in G.80323
|
Huawei Technologies Co., Ltd.
|
Q9/15
|
2008-11-26 |
|
[ 330 ]
|
Parameters in G.lcasub
|
Huawei Technologies Co., Ltd.
|
Q8/15
|
2008-11-26 |
|
[ 329 ]
|
Supplement on repeaterless optical fibre submarine cable system (G.973)
|
Huawei Technologies Co., Ltd
|
Q8/15
|
2008-11-26 |
|
[ 328 ]
|
The influence of COTDR to optical signals
|
Huawei Technologies Co., Ltd
|
Q8/15
|
2008-11-26 |
|
[ 327 ]
|
Comments on P-DPSK according to the test data
|
Huawei Technologies Co., Ltd.
|
Q6/15
|
2008-11-26 |
|
[ 326 ]
|
Proposal for Optical Interface Diagnostic Monitoring for Optical Transmission System
|
Huawei Technologies Co., Ltd.
|
Q6/15
|
2008-11-26 |
|
[ 325 ]
|
Optically identified wavelength in performance monitoring
|
Huawei Technologies Co., Ltd.
|
Q6/15
|
2008-11-26 |
|
[ 324 ]
|
About P-DPSK receiver performance dependence on optical filter characteristics
|
Huawei Technologies Co., Ltd.
|
Q6/15
|
2008-11-26 |
|
[ 323 ]
|
DCC and GCC usage for DCN
|
Huawei Technologies Co., Ltd.
|
Q14/15
|
2008-11-26 |
|
[ 322 ]
|
DCC and GCC usage for DCN (different version)
|
Huawei Technologies Co., Ltd.
|
Q14/15
|
2008-11-26 |
|
[ 321 ]
|
Additional Call attributes for VCAT/LCAS
|
Huawei Technologies Co., Ltd., China
|
Q14/15
|
2008-11-26 |
|
[ 320 ]
|
G.800 Terminology and Backward Compatibility with G.805
|
Huawei Technologies Co.,Ltd.
|
Q12/15
|
2008-11-26 |
|
[ 319 ]
|
G.800 Description of Media Networks
|
Huawei Technologies Co.,Ltd.
|
Q12/15
|
2008-11-26 |
|
[ 318 ]
|
G.800 Interconnect Entities
|
Huawei Technologies Co.,Ltd.
|
Q12/15
|
2008-11-26 |
|
[ 317 ]
|
Proposal to extend G.8012
|
Huawei Technologies Co., Ltd.
|
Q11/15
|
2008-11-26 |
|
[ 316 ]
|
G.inp: Updated Working Text for Physical-Layer Retransmission
|
MII, China, Huawei
|
Q4/15
|
2008-11-25 |
|
[ 315 ]
|
G.inp: Simulation Results for Evaluation of Retransmission Methods
|
MII, China, Huawei
|
Q4/15
|
2008-11-25 |
|
[ 314 ]
|
G.int: Proposal for Next-Generation LINK/PHY Interface
|
MII, China, Huawei, ZTE
|
Q4/15
|
2008-11-25 |
|
[ 313 ]
|
G.vector: Preventing Disruption of Existing Lines During Joining
|
MII, China, Huawei
|
Q4/15
|
2008-11-25 |
|
[ 312 ]
|
G.inp: More Simulation Results for Evaluation of Retransmission Methods
|
MII, China, Huawei
|
Q4/15
|
2008-11-25 |
|
[ 311 ]
|
G.vdsl: Improving the Performance of Upstream Power Back-off
|
MII, China, Huawei
|
Q4/15
|
2008-11-25 |
|
[ 310 ]
|
G.inp: Impact of Impulse Noise Sensor on Retransmission on Delta Interface
|
MII, China, Huawei
|
Q4/15
|
2008-11-25 |
|
[ 309 ]
|
G.int: Comments on LINK/PHY Interface
|
MII, China, Huawei, ZTE
|
Q4/15
|
2008-11-25 |
|
[ 308 ]
|
G.inp: An Updated Model for Retransmission between PMD and PMS-TC Sub-Layers
|
MII, China, Huawei
|
Q4/15
|
2008-11-25 |
|
[ 307 ]
|
G.8032 Flushing
|
Alcatel-Lucent
|
Q9/15
|
2008-11-25 |
|
[ 306 ]
|
G.8032 WTR and WTB comments
|
Alcatel-Lucent, AimValley BV
|
Q9/15
|
2008-11-25 |
|
[ 305 ]
|
G.8032 Statemachine
|
Alcatel-Lucent, AimValley BV
|
Q9/15
|
2008-11-25 |
|
[ 304 ]
|
G.8032 Priority Logic and Statemachine
|
Alcatel-Lucent, AimValley BV
|
Q9/15
|
2008-11-25 |
|
[ 303 ]
|
G.8032 Hidden Transitions
|
Alcatel-Lucent, AimValley BV
|
Q9/15
|
2008-11-25 |
|
[ 302 ]
|
Comparison between synchronization metrics
|
Nokia Siemens Networks
|
Q13/15
|
2008-11-25 |
|
[ 301 ]
|
VDSL: Noise testing with fluctuating crosstalk
|
BT plc
|
Q4/15
|
2008-11-25 |
|
[ 300 ]
|
Retransmission management in the TPS-TC layer
|
Infineon Technologies AG
|
Q4/15
|
2008-11-23 |
|
[ 299 ]
|
Proposal on automatic discovery requirements in WDM network in G.7714.1
|
ZTE Corporation
|
Q14/15
|
2008-11-23 |
|
[ 298 ]
|
Clarifications on Key Management in GPON System
|
ZTE Corporation
|
Q2/15
|
2008-11-23 |
|
[ 297 ]
|
BMC and SSM in 1588v2 Telecom Profiles for time/phase sync
|
ZTE Corporation
|
Q13/15
|
2008-11-23 |
|
[ 296 ]
|
Considerations about 1588v2 Telecom Profiles classification for time sync in G.8265
|
ZTE Corporation, CATR MII
|
Q13/15
|
2008-11-23 |
|
[ 295 ]
(Rev.1) |
Proposal to consider node resource management in G.8080 for WSON
|
ZTE Corporation
|
Q12/15
|
2008-11-23 |
|
[ 294 ]
|
Includes pending state to support flushing FDB in non_revertive mechanism (G.8032)
|
ZTE Corporation, China
|
Q9/15
|
2008-11-23 |
|
[ 293 ]
|
Flushing behaviour in interconnected ring protection (G.8032)
|
ZTE Corporation, China
|
Q9/15
|
2008-11-23 |
|
[ 292 ]
|
FDB Flush Problem in non_revertive operation
|
ZTE Corporation, China
|
Q9/15
|
2008-11-23 |
|
[ 291 ]
|
Difference between sub-ring and single ring protection (G.8032)
|
ZTE Corporation, China
|
Q9/15
|
2008-11-23 |
|
[ 290 ]
|
Comparison between shared-link and sub-ring models (G.8032)
|
ZTE Corporation, China
|
Q9/15
|
2008-11-23 |
|
[ 289 ]
|
Text Proposals in Appendix I for G.696.1 on mixed 10G/40G transmission
|
ZTE Corporation
|
Q6/15
|
2008-11-23 |
Resultats:338 documents Résultats :
1 -
2 -
3 -
4 -
5 -
6 -
7
- Suivant
|
Téléchargement de multiples documents: Formats et langues à prendre en compte (si disponibles):