Union Internationale des Télécommunications   UIT
English  Español
 
Plan du site Contactez-nous Copie Imprimable
  Page d'accueil : UIT-T : SG 11 : Réunion 2014-11-21 : Documents Temporaires  Ajoutés récemment -  Recherche de documents de réunion
   
UIT-T SG 11  TD (2014-11-21) 

UIT-T SG 11

Protocols and test specifications

Période d'études 2013

Réunion  du 2014-11-21 au 2014-11-21

Lieu : Suisse [Genève]

Autres réunions : 2016-06-27  2016-04-29  2016-03-24  2015-12-02  2015-04-22  [ 2014-11-21 ]  2014-07-09  2014-02-21  2013-11-14  2013-11-07  2013-06-21  2013-02-25 

Resultats:44 documents
Documents Temporaires  (GEN)   Documents / Contributions
 
Numéro 
Titre Source AI/Question
Date
[ 601-GEN ]  
 
Updated Work Programme of WP 3/11 (November 2014)     Chairman WP3/11   Q9/11, Q8/11, Q7/11   2014-11-21
[ 600-GEN ]  
(Rev.1) 
Draft Report for WP 3/11 meeting (Geneva, 21 November 2014)     Chairman WP 3/11   Q9/11, Q8/11, Q7/11   2014-11-21
[ 599-GEN ]  
(Rev.1) 
Report of Question 8/11 Rapporteurs meeting (19 - 21 November, 2014)     Rapporteur Q8/11   Q8/11   2014-11-21
[ 598-GEN ]  
 
Draft Agenda for WP 3/11 Closing meeting     Chairman WP3/11   Q9/11, Q8/11, Q7/11   2014-11-21
[ 597-GEN ]  
(Rev.1) 
Report for WP2/11 meeting "Software-Defined Networking (SDN) and resource control"     Chairman WP2/11   Q6/11, Q5/11, Q4/11   2014-11-21
[ 596-GEN ]  
(Rev.1) 
Draft Agenda: WP2 Plenary meeting (Geneva, 21 November 2014)     Chairman WP2/11   Q6/11, Q5/11, Q4/11   2014-11-21
[ 595-GEN ]  
(Rev.1) 
LS/o on the progress on the Technical Report on Counterfeit ICT Equipment [to CITEL]     ITU-T WP3/11   Q8/11   2014-11-21
[ 594-GEN ]  
 
Report of Question 9/11 meeting (Geneva, 19-20 November 2014)     Rapporteur Q9/11   Q9/11   2014-11-21
[ 593-GEN ]  
 
LS/o on collaboration with ISO/IEC JTC 1/SC 6 on managed peer-to-peer communications [to ISO/IEC JTC 1/SC 6]     Rapporteur Q9/11   Q9/11   2014-11-21
[ 592-GEN ]  
 
Output - Draft new Recommendation ITU-T X.mp2p-orcp "Managed P2P communications: Overlay Resource Control Protocol" (November 2014)     Editors   Q9/11   2014-11-21
[ 591-GEN ]  
 
Output - Draft new Recommendation ITU-T X.mp2p-arch "Managed P2P communications: Functional architecture" (November 2014)     Editors   Q9/11   2014-11-21
[ 590-GEN ]  
 
Output - Draft new Recommendation ITU-T X.mp2p-pamp "Managed P2P communications: Peer Activity Management Protocol" (November 2014)     Editors   Q9/11   2014-11-21
[ 589-GEN ]  
 
Report of SDN Joint meeting (Geneva, Switzerland, 13 November 2014)     Rapporteurs   Q4/11, Q2/13, Q14/13   2014-11-20
[ 588-GEN ]  
 
Report of Question 4/11 meeting     Rapporteur Q4/11   Q4/11   2014-11-20
[ 587-GEN ]  
 
Output - Draft new Recommendation ITU-T Q.BNG-Pool "Signalling requirements for BNG (Broadband Network Gateway) pool"     Editors   Q5/11   2014-11-21
[ 586-GEN ]  
 
Consent - Draft new ITU-T Q.3315 "Signalling requirements for flexible network service combination on Broadband Network Gateway"     Editors   Q5/11   2014-11-21
[ 585-GEN ]  
 
Report of Question 5/11 interim rapporteur meeting (Geneva,18-21 November 2014)     Rapporteur Q5/11   Q5/11   2014-11-21
[ 584-GEN ]  
 
Output - Draft new Supplement Q.Supplement-SDN "Framework of signalling for SDN"     Editors   Q4/11   2014-11-20
[ 583-GEN ]  
(Rev.1) 
List of participants     TSB   QALL/11   2014-11-21
[ 582-GEN ]  
 
Q6/13 & Q4/11 Joint Meeting Report     Rapporteurs Q6/13 & Q4/11   Q6/13, Q4/11   2014-11-20
[ 581-GEN ]  
 
Report of Question 3/11 meeting (Geneva, 13-14 November 2014)  
This TD has been reposted as TD 630 for the April 2015 SG11 meeting
 
Rapporteur Q3/11   Q3/11   2014-11-17
[ 580-GEN ]  
 
Initial baseline text for the Technical Report on "ETS Interoperability limitations"  
This TD has been reposted as TD 629 for the April 2015 SG11 meeting
 
Editor   Q3/11   2014-11-17
[ 579-GEN ]  
 
Report of Question 2/11 meeting (Geneva, 13-14 November 2014)  
This TD has been reposted as TD 628 for the April 2015 SG11 meeting
 
Rapporteur Q2/11   Q2/11   2014-11-17
[ 578-GEN ]  
 
Output - draft Recommendation ITU-T Q.DSNSA "Signalling Architecture for the Control Plane of Distributed Service Networking"  
This TD has been reposted as TD 627 for the April 2015 SG11 meeting
 
Editors   Q1/11   2014-11-17
[ 577-GEN ]  
 
Report of Question 1/11 meeting "Signalling and protocol architectures in emerging telecommunication environments"  
This TD has been reposted as TD 626 for the April 2015 SG11 meeting
 
Acting Rapporteur Q1/11   Q1/11   2014-11-14
[ 576-GEN ]  
 
Draft Q6/13 & Q4/11 Interim e-Meeting Report (e-meeting, 23 September 2014)     Rapporteur for Q6/13 & Q4/11   Q4/11   2014-11-13
[ 575-GEN ]  
 
ITU PP14 relevant outcomes  
This TD has been reposted as TD 647 for the April 2015 SG11 meeting
 
SG11 Vice-Chairman   Q8/11, Q11/11   2014-11-11
[ 574-GEN ]  
(Rev.1-2) 
Approval - Draft Technical Report on Counterfeit ICT Equipment     Editor   Q8/11   2014-11-06
[ 573-GEN ]  
 
Report of Question 8/11 e-meeting (e-meeting, 22 October 2014)     Rapporteur Q8/11   Q8/11   2014-11-06
[ 572-GEN ]  
 
Report of Question 8/11 e-meeting (e-meeting, 30 September 2014)     Rapporteur Q8/11   Q8/11   2014-11-06
[ 571-GEN ]  
 
Report of Question 8/11 e-meeting (e-meeting, 28 August 2014)     Rapporteur Q8/11   Q8/11   2014-11-06
[ 570-GEN ]  
 
LS/i/r on to ITU-T SG 11 for Collaboration on managed P2P communications (from ISO/IEC JTC 1/SC 6/WG 7)     ISO/IEC JTC 1/SC 6/WG 7   Q9/11   2014-10-31
[ 569-GEN ]  
 
LS/r on FG M2M output and the progress of SG11 on M2M (SG11-LS-48) to ITU-T SG11 (from ITU-T Q28/16)  
This TD has been reposted as TD 646 for the April 2015 SG11 meeting
 
ITU-T Q28/16   QALL/11   2014-10-27
[ 568-GEN ]  
 
LS on JCA-Res178 requests your further input (from JCA Res178)  
This TD has been reposted as TD 638 for the April 2015 SG11 meeting
 
JCA-Res178   QALL/11   2014-10-27
[ 567-GEN ]  
 
LS/i/r on request to all SGs to follow up on the Council 2013 C&I Action Items for implementation by ITU-T SGs (reply to SG11 - LS 56) [from ITU-T SG9]  
This TD has been reposted as TD 640 for the April 2015 SG11 meeting
 
ITU-T SG9   Q11/11   2014-10-09
[ 566-GEN ]  
 
LS/i/r on request to all SGs to follow up on the Council 2013 C&I Action Items for implementation by ITU-T SGs (reply to COM 11 LS 44r1, LS 41 & LS 55 (COM 17 TDs 1200 Rev.1, 1201, 1261)) [from ITU-T SG17]  
This TD has been reposted as TD 641 for the April 2015 SG11 meeting
 
ITU-T SG17   Q11/11   2014-10-03
[ 565-GEN ]  
 
Brazilian Report on the CITEL CCPI XXV Meeting regarding the Counterfeited and Substandard ICT Equipment topic     Associate Rapporteur Q8/11   Q8/11   2014-09-29
[ 564-GEN ]  
 
LS/i/r on pilot project on the Recommendation ITU-T P.381 (reply to COM 11 LS 45) [from ITU-T SG12]  
This TD has been reposted as TD 642 for the April 2015 SG11 meeting
 
ITU-T SG12   Q11/11   2014-09-29
[ 563-GEN ]  
 
LS/i on revision of G.1000 and move towards a QoE framework [from ITU-T SG12]  
This TD has been reposted as TD 645 for the April 2015 SG11 meeting
 
ITU-T SG12   Q10/11   2014-09-29
[ 562-GEN ]  
 
LS/i on JCA-Res178 requests your input [from JCA-Res178]  
This TD has been reposted as TD 639 for the April 2015 SG11 meeting
 
Co-convenors of JCA on PP-10 Resolution 178   QALL/11   2014-09-05
[ 561-GEN ]  
 
LS/i/r on progress on e-health standardization and future work (reply to SG16-LS117R1) [from ITU-T SG13]  
This TD has been reposted as TD 644 for the April 2015 SG11 meeting
 
ITU-T SG13   Q9/11, Q8/11, Q7/11, Q1/11   2014-09-05
[ 560-GEN ]  
 
LS/i on collaboration between ITU-T and testing laboratories for ITU C&I programme [from ITU-T SG16]  
This TD has been reposted as TD 643 for the April 2015 SG11 meeting
 
ITU-T SG16   Q11/11   2014-09-05
[ 559-GEN ]  
(Rev.1-11) 
Draft WP2 and 3/11 meeting plan (time schedule), including interim meetings and other relevant meetings     TSB   QALL/11   2014-09-02
[ 558-GEN ]  
 
Draft Agenda: WPs 2 and 3/11 Plenary meetings (Geneva, 21 November 2014)  
An updated version of the Agenda of WP2 has been posted as TD 596 (GEN/11) An updated version of the Agenda of WP3 has been posted as TD 598 (GEN/11)
 
TSB   Q9/11, Q8/11, Q7/11, Q6/11, Q5/11, Q4/11   2014-09-02
Resultats:44 documents
 
Téléchargement de multiples documents: Cocher les cases correspondant aux documents sélectionnés, puis appuyer sur "Télécharger"
   
 
Préférences utilisateur: 
Téléchargement de multiples documents: Formats et langues à prendre en compte (si disponibles):
Pages de navigation HTML  
Formats  + Autres formats
Langues (maximum 2)  + Multilingue 
(E: Anglais - F: Français - S: Espagnol - A: Arabe - C: Chinois - R: Russe)

Testez ITU Translate pour la traduction automatique de documents
Début de page -  Commentaires -  Contactez-nous -  Droits d'auteur © UIT 2008 Tous droits réservés
Contact pour cette page :  TSB EDH
Mis à jour le : 2014-12-18