International Telecommunication Union   ITU
Français  Español
 
Site map Contact Us Print version
  Home : ITU-T : SG5RG-AP Recently posted -  Search Meeting Documents
   
ITU-T SG5RG-AP Meeting Documents
  Max # of documents displayed/page:
Results: 40 total items.
Number  Date Source Title Questions 
  Number  Posted Size    
 
[ R 3 ]  2021-10-22 Chairman SG5RG-AP   Report of the third meeting of ITU-T SG5RG-AP, (Virtual, 19-20 October 2021)     QALL/5  
  [ R 3 ]  - English -  Word 2021-10-22 [14:50]  73'112  bytes  
 
[ TD 61-PLEN ]  2021-10-07 TSB   List of Participants     QALL/5  
  [ TD 61-PLEN ]  - English -  PDF (acrobat) 2021-10-20 [12:54]  497'046  bytes  
 
[ TD 82-PLEN ]  2021-10-20 Chairman SG5RG-AP   Draft Report of the third meeting of ITU-T SG5RG-AP, (Virtual, 19-20 October 2021)     QALL/5  
  [ TD 82-PLEN ]  - English -  Word 2021-10-20 [12:50]  73'184  bytes  
 
[ TD 81-PLEN ]  2021-10-20 TSB   Highlights of Contributions of Member States and Sector Members of the Asian and the Pacific region to ITU-T SG5, (Virtual, 19-20 October 2021)     QALL/5  
  [ TD 81-PLEN ]  - English -  Zip (Document) 2021-10-20 [11:38]  425'976  bytes  
  [ TD 81-PLEN ]  - English -  Word 2021-10-20 [11:38]  46'548  bytes  
 
[ TD 80-PLEN ]  2021-10-18 Chairman SG5RG-AP   Information on ITU-T SG5RG-AP priorities     QALL/5  
  [ TD 80-PLEN ] Revision 1 - English -  Word 2021-10-20 [11:18]  45'049  bytes  
  [ TD 80-PLEN ]  - English -  Word 2021-10-18 [11:58]  43'969  bytes  
 
[ C 20 ]  2021-10-06 Nippon Telegraph and Telephone Corporation (NTT) (Japan)   Discussion on exemption conditions included in K.21, K.20, K.45 "Resistibility of telecommunication equipment installed in customer premises, telecommunication centre, access and trunk networks to over voltages and over currents"     Q2/5  
  [ C 20 ]  - English -  Word 2021-10-06 [17:32]  451'154  bytes  
 
[ C 19 ]  2021-10-06 Ministry of Industry and Information Technology (MIIT) (China)   Proposed new work item on "Net Zero Assessment and best practices in Smart Cities"     Q11/5  
  [ C 19 ]  - English -  Word 2021-10-06 [17:18]  59'394  bytes  
 
[ C 18 ]  2021-10-06 Ministry of Industry and Information Technology (MIIT) (China)   Proposed new work item on " Net Zero Assessment and best practices in Industrial Park"     Q11/5  
  [ C 18 ]  - English -  Word 2021-10-06 [17:15]  59'765  bytes  
 
[ C 17 ]  2021-10-06 Ministry of Industry and Information Technology (MIIT) (China)   Proposed new work item on "Net Zero Assessment and best practices in Base Station"     Q11/5  
  [ C 17 ]  - English -  Word 2021-10-06 [17:13]  60'078  bytes  
 
[ C 16 ]  2021-10-06 Ministry of Industry and Information Technology (MIIT) (China)   Proposed new work item on "Net Zero Assessment and best practices in data center/ telecommunication room"     Q11/5  
  [ C 16 ]  - English -  Word 2021-10-06 [17:07]  60'023  bytes  
 
[ C 15 ]  2021-10-06 Ministry of Industry and Information Technology (MIIT) (China)   Proposed new work item on "Methodologies for Measurement of GHG Emissions in Smart Cities"     Q9/5  
  [ C 15 ]  - English -  Word 2021-10-06 [17:04]  59'756  bytes  
 
[ C 14 ]  2021-10-06 Ministry of Industry and Information Technology (MIIT) (China)   Proposed new work item on "Methodologies for Measurement of GHG emissions in Industrial Park"     Q9/5  
  [ C 14 ]  - English -  Word 2021-10-06 [16:53]  59'863  bytes  
 
[ C 13 ]  2021-10-06 Ministry of Industry and Information Technology (MIIT) (China)   Proposed new work item on "Methodologies for Measurement of GHG emissions in Communication Base Station"     Q9/5  
  [ C 13 ]  - English -  Word 2021-10-06 [16:49]  59'690  bytes  
 
[ C 12 ]  2021-10-06 Ministry of Industry and Information Technology (MIIT) (China)   Proposed new work item on "Methodologies for Measurement of GHG emissions in data center/ telecommunication room"     Q9/5  
  [ C 12 ]  - English -  Word 2021-10-06 [16:45]  62'125  bytes  
 
[ TD 77-PLEN ]  2021-10-07 TSB   Report of the second meeting of SG5RG-AP, (Virtual, 15-16 April 2021)     QALL/5  
  [ TD 77-PLEN ]  - English -  Word 2021-10-07 [11:48]  66'882  bytes  
 
[ TD 60-PLEN ]  2021-09-09 TSB   Draft agenda for the ITU-T SG5 Regional Group for Asia and the Pacific (SG5RG AP) virtual meeting, 19-20 Ocotber 2021     QALL/5  
  [ TD 60-PLEN ] Revision 1 - English -  Word 2021-10-18 [12:58]  64'013  bytes  
  [ TD 60-PLEN ]  - English -  Word 2021-09-09 [10:46]  59'650  bytes  
 
[ TD 79-PLEN ]  2021-10-07 TSB   Information on ITU-T SG5 and ITU-T SG5RG-AP mailing lists     QALL/5  
  [ TD 79-PLEN ]  - English -  Word 2021-10-07 [12:14]  47'329  bytes  
 
[ TD 78-PLEN ]  2021-10-07 TSB   Introductory presentation of ITU-T Study Group 5: Environment, climate change and circular economy     QALL/5  
  [ TD 78-PLEN ]  - English -  Zip (Document) 2021-10-07 [11:52]  21'232'769  bytes  
 
[ TD 76-PLEN ]  2021-10-07 TSB   LS/i on WTSA-20 preparations [from TSAG]     QALL/5  
  [ TD 76-PLEN ]  - English -  Zip (Document) 2021-10-07 [11:47]  153'197  bytes  
 
[ TD 75-PLEN ]  2021-10-07 TSB   List of SG5RG-AP Member States     QALL/5  
  [ TD 75-PLEN ]  - English -  Word 2021-10-07 [11:46]  53'423  bytes  
 
[ TD 74-PLEN ]  2021-10-07 TSB   Terms of Reference of SG5RG-AP     QALL/5  
  [ TD 74-PLEN ]  - English -  Word 2021-10-07 [11:45]  58'211  bytes  
 
[ TD 73-PLEN ]  2021-10-07 TSB   Management team of SG5RG-AP     QALL/5  
  [ TD 73-PLEN ]  - English -  Word 2021-10-07 [11:45]  53'292  bytes  
 
[ TD 72-PLEN ]  2021-10-07 TSB   ITU-T Study Group 5 mandate, Lead role (extract from Resolution 2 (Hammamet, 2016) and ITU-T Study Group 5 structure     QALL/5  
  [ TD 72-PLEN ]  - English -  Word 2021-10-07 [11:44]  58'299  bytes  
 
[ TD 71-PLEN ]  2021-10-07 TSB   List of Study Group 5 Management team, Rapporteurs and Associate Rapporteurs     QALL/5  
  [ TD 71-PLEN ]  - English -  Word 2021-10-07 [11:43]  58'405  bytes  
 
[ TD 70-PLEN ]  2021-10-07 TSB   WTSA Resolutions concerning ITU-T SG5 Resolutions 72 and 73 (Rev. Hammamet, 2016) and Resolution 79 (Dubai, 2012)     QALL/5  
  [ TD 70-PLEN ]  - English -  Zip (Document) 2021-10-07 [11:41]  525'112  bytes  
 
[ TD 69-PLEN ]  2021-10-07 TSB   Plenipotentiary Resolutions concerning ITU-T Study Group 5     QALL/5  
  [ TD 69-PLEN ]  - English -  Word 2021-10-07 [11:41]  81'001  bytes  
 
[ TD 68-PLEN ]  2021-10-07 TSB   ITU-T Study Group 5 Work programme     QALL/5  
  [ TD 68-PLEN ]  - English -  Word 2021-10-07 [11:39]  75'355  bytes  
 
[ TD 67-PLEN ]  2021-10-07 TSB   Report of the meeting of Study Group 5 (virtual meeting 11-20 May 2020)     QALL/5  
  [ TD 67-PLEN ]  - English -  Word 2021-10-07 [11:38]  129'745  bytes  
 
[ TD 66-PLEN ]  2021-10-07 TSB   Setting Environmental Requirements for 5G     QALL/5  
  [ TD 66-PLEN ]  - English -  Word 2021-10-07 [11:38]  56'088  bytes  
 
[ TD 65-PLEN ]  2021-10-07 TSB   United for Smart Sustainable Cities (U4SSC) initiative     QALL/5  
  [ TD 65-PLEN ]  - English -  Word 2021-10-07 [11:37]  49'544  bytes  
 
[ TD 64-PLEN ]  2021-10-07 TSB   Bridging the standardization gap and Regional Groups     QALL/5  
  [ TD 64-PLEN ]  - English -  Zip (Document) 2021-10-07 [11:35]  706'725  bytes  
 
[ TD 63-PLEN ]  2021-10-07 TSB   Guidelines for the preparation of Contributions to ITU-T: Relevant ITU A-series Recommendation     QALL/5  
  [ TD 63-PLEN ]  - English -  Word 2021-10-07 [11:12]  59'991  bytes  
 
[ TD 62-PLEN ]  2021-10-07 TSB   Remote participation guide for SG5RG-AP meeting (Virtual, 19-20 October 2021)     QALL/5  
  [ TD 62-PLEN ]  - English -  Word 2021-10-07 [11:10]  525'488  bytes  
 
[ C 22 ]  2021-10-06 Huawei Technologies Co., Ltd., China   Initial baseline text of draft Recommendation ITU T L.ICT_PROCURE "Public procurement of ICTs to mitigate the adverse effects of e-waste"     Q7/5  
  [ C 22 ]  - English -  Word 2021-10-06 [17:47]  53'787  bytes  
 
[ C 21 ]  2021-10-06 Huawei Technologies Co., Ltd., China   Proposed A.1 justification for draft Recommendation ITU T L.ICT_PROCURE "Public procurement of ICTs to mitigate the adverse effects of e-waste"     Q7/5  
  [ C 21 ]  - English -  Word 2021-10-06 [17:39]  55'188  bytes  
 
[ COL 4 ]  2021-09-09 TSB   Virtual meeting of ITU-T Study Group 5 Regional Group for Asia and the Pacific (SG5RG-AP), 19 - 20 October 2021     QALL/5  
  [ COL 4 ]  - Chinese -  Word 2021-09-22 [14:20]  59'130  bytes  
  [ COL 4 ]  - English -  Word 2021-09-09 [16:47]  69'006  bytes  
Results: 40 total items.
 
Multiple Document Download: Check the boxes of the selected documents, then click "Zip and download"
   
 
User preferences: 
Multiple Document Download: Formats and Languages to be included (when available):
HTML Navigation Pages Yes  
Formats doc pdf zip  + Other formats
Languages (maximum 2) E F S A C R  + Multilingual 
(E: English - F: French - S: Spanish - A: Arabic - C: Chinese - R: Russian)

Top -  Feedback -  Contact Us -  Copyright © ITU 2008 All Rights Reserved
Contact for this page :  TSB EDH
Updated : 2021-10-22