Union Internationale des Télécommunications   UIT
English  Español
 
Plan du site Contactez-nous Copie Imprimable
  Page d'accueil : UIT-T : SG06 : Documents de réunion  Ajoutés récemment -  Recherche de documents de réunion
   
UIT-T SG06  ALL (2008-04-14) 

UIT-T SG06

Installations extérieures et installations intérieures connexes

Période d'études 2005

Réunion  du 2008-04-14 au 2008-04-18

Lieu : Chine [Wuhan]

Lettres Collectives  Documents / Contributions
 
Numéro 
Titre Source AI/Question
Date
[ 6 ]  
 
Réunion de la Commission d'études 6, Wuhan, Chine, 14-18 avril 2008     SG 6     2008-02-11
 

 
Contributions  Documents / Contributions
 
Numéro 
Titre Source AI/Question
Date
[ 54 ]  
 
Comments on a new recommendation L.teib "optical cabling systems in buildings"     NTT   Q2/6   2008-04-04
[ 53 ]  
 
Proposal for a New Question (Q10) in SG6 - "Structure Characteristics, Performances and Deployment Methods of Cables Used for FTTH"     Ministry of Information Industry of China   QALL/6   2008-04-03
[ 52 ]  
 
Proposal for development of a new Recommendation: "Requirements for passive optical nodes: Optical distribution assembled frames for central office environments"     Ministry of Information Industry of China   Q9/6   2008-04-03
[ 51 ]  
 
Proposal for a draft of new ITU-T Recommendation "Monitoring system using wireless sensor network (WSN) for outside plant facilities"     KT Corporation   Q2/6   2008-03-27
[ 50 ]  
 
Draft Revised text for : L.18 Sheath closures for terrestrial copper telecommunication cables     Tyco Electronics / Rapporteur Q9   Q9/6   2008-04-02
 

 
Documents Temporaires  Documents / Contributions
 
Numéro 
Titre Source AI/Question
Date
[ 388-GEN ]  
 
Reply LS to Q1/15 on update on access network activities in SG 6     SG6 Chairman   QALL/6   2008-05-06
[ 387-GEN ]  
 
Mandate for SG6 Study Period 2009 - 2012     Chairman SG6   QALL/6   2008-04-29
[ 386-GEN ]  
 
Draft Report of the sixth meeting of Study Group 6 "Outside plant and related indoor installations" (Wuhan, 14-18 April 2008)     ITU-T Study Group 6   QALL/6   2008-05-07
[ 385-GEN ]  
(Rev.1) 
SG6 restructuring discussions     Chairman SG6   QALL/6   2008-04-29
[ 384-GEN ]  
 
Draft new ITU-T Recommendation L.coloop "Copper loop requirements for a various technologies including indoor and structured cabling"     Rapporteur Q5/6   Q5/6   2008-04-18
Documents affichés : 5 sur un total de 66  relatifs à cette réunion (en voir plus...)  

 
Rapports  Documents / Contributions
 
Numéro 
Titre Source AI/Question
Date
[ 6 ]  
 
Report of the sixth meeting of Study Group 6 "Outside plant and related indoor installations" (Wuhan, China, 14-18 April 2008)     SG 6     2008-07-01
 

 
Téléchargement de multiples documents: Cocher les cases correspondant aux documents sélectionnés, puis appuyer sur "Télécharger"
   
 
Préférences utilisateur: 
Téléchargement de multiples documents: Formats et langues à prendre en compte (si disponibles):
Pages de navigation HTML  
Formats  + Autres formats
Langues (maximum 2)  + Multilingue 
(E: Anglais - F: Français - S: Espagnol - A: Arabe - C: Chinois - R: Russe)

Testez ITU Translate pour la traduction automatique de documents
Début de page -  Commentaires -  Contactez-nous -  Droits d'auteur © UIT 2008 Tous droits réservés
Contact pour cette page :  TSB EDH
Mis à jour le : 2024-7-12