Union Internationale des Télécommunications   UIT
English  Español
 
Plan du site Contactez-nous Copie Imprimable
  Page d'accueil : UIT-R : WP3M : Contributions  Ajoutés récemment -  Recherche de documents de réunion
   
UIT-R WP3M  C 

UIT-R WP3M

Propagation point-à-point et Terre-espace

Resultats:419 documents
Résultats :  Précédent -  1 - 2 - 3 - 4 - 5 - 6 - 7 - 8 - 9  - Suivant Next
Contributions  Documents / Contributions
 
Numéro 
Titre Source AI/Question
Date
[ 319 ]  
 
Supporting information for rain attenuation modeling - Considering wet antenna effect     China (People's Republic of)     2018-06-12
[ 318 ]  
 
Proposed preliminary revision to Recommendation ITU-R P.618-13 - A new rain attenuation model considering wet antenna effect     China (People's Republic of)     2018-06-12
[ 317 ]  
 
Proposed preliminary modification to Report ITU-R P.2346-2 - Building entry loss measurements in an urban environment at 27.5 and 39.5 GHz     China (People's Republic of)     2018-06-12
[ 316 ]  
 
Mathworks MATLAB implementation of Recommendation ITU-R P.2001-2     Switzerland (Confederation of) , LS telcom AG     2018-06-12
[ 315 ]  
 
Information document - Measurement and analysis of clutter loss by using drone     Japan   Q211/3   2018-06-12
[ 314 ]  
 
Fixed link long term measurements     United Kingdom of Great Britain and Northern Ireland     2018-06-11
[ 313 ]  
 
Independent and joint statistics of clutter loss and building entry loss - Initial measurements     United Kingdom of Great Britain and Northern Ireland     2018-06-11
[ 312 ]  
 
Building entry loss - New measurements of domestic buildings     United Kingdom of Great Britain and Northern Ireland     2018-06-11
[ 311 ]  
 
Recommendation ITU-R P.452-16 performance evaluation     United Kingdom of Great Britain and Northern Ireland     2018-06-11
[ 310 ]  
 
UK mobile measurement data preparation and benchmarking method     United Kingdom of Great Britain and Northern Ireland     2018-06-11
[ 309 ]  
 
On measurement methodologies: Conditions for comparability of measurements data     Telefon AB - LM Ericsson , Electronics and Telecommunications Research Institute (ETRI)     2018-06-12
[ 308 ]  
 
Proposed revision to Recommendation ITU-R P.452-16 - Additional measurements for modification of the height-gain model     Korea (Republic of)     2018-06-11
[ 307 ]  
 
Satellite measurement data at 20 GHz from high North Latitudes     Telenor ASA     2018-06-11
[ 306 ]  
 
Proposed revision of Recommendation ITU-R P.2109-0 - Effect of Antenna Beamwidth on Building Entry Loss     Korea (Republic of)     2018-06-11
[ 305 ]  
(Rev.1) 
Information document to Recommendation ITU-R P.452-16 - Anomalous propagation measurements in South Coast of Korea     Korea (Republic of)     2018-06-11
[ 304 ]  
 
Building entry loss (BEL) measurement databank     ORANGE POLSKA S.A.     2018-06-07
[ 303 ]  
 
Liaison statement to Working Party 6A (copied for information to Working Parties 3K, 3M, 5B and 5C) - Updated on work towards WRC-19 agenda item1.1     WP 5A     2018-06-06
[ 302 ]  
 
Proposed revision of Study Group 3 data banks formatted Table VII-7     United States of America     2018-06-05
[ 301 ]  
 
Proposed revision to VBA implementation of Recommendation ITU-R P.452-16     United States of America     2018-06-05
[ 300 ]  
 
Proposed draft revision to Recommendation ITU-R P.452-16 - Prediction procedure for the evaluation of interference between stations on the surface of the Earth at frequencies above about 0.1 GHz     United States of America     2018-06-05
[ 299 ]  
 
Working document towards a preliminary draft revision of Recommendation ITU-R P.619-3 - Propagation data required for the evaluation of interference between stations in space and those on the surface of the Earth     United States of America     2018-06-05
[ 298 ]  
 
Draft revision of Recommendation ITU-R P.1144-9 guide to the application of the propagation methods of Rediocommunication Study Group 3     United States of America     2018-06-05
[ 297 ]  
 
Working document towards a preliminary draft revision of Recommendation ITU-R P.618-13     United States of America     2018-06-05
[ 296 ]  
 
Draft new fascicle FAS/3M/X - Fascicle on Hydrometeor Scatter Interference     United States of America     2018-06-05
[ 295 ]  
 
Working document towards a preliminary draft revision of Recommendation ITU-R P.452, Section 5     United States of America     2018-06-05
[ 294 ]  
 
Study Group 3 data banks contribution - Wide-band statistics of aeronautical mobile-ground links in the 5030-5091 MHz frequency range     United States of America     2018-06-05
[ 293 ]  
 
Working document towards a preliminary draft modification of Recommendation ITU-R P.618-13 - Modifying the upper probability limit of the rain attenuation prediction method     Luxembourg , Italy     2018-06-05
[ 292 ]  
 
Reply liaison statement to Working Party 4A (copy for information to Working Parties 3M, 4C, 5A, 5D, 7B, 7C and 7D) - Clarification of HAPS characteristics and studies     WP 5C     2018-06-05
[ 291 ]  
 
Reply liaison statement to Working Party 5D (copy for information to Working Parties 3M, 4A, 4C, 5A, 7B, 7C and 7D) - Information on Adaptive Transmit Power Control (ATPC)     WP 5C   AI1.14   2018-06-05
[ 290 ]  
 
Liaison statement to ITU-R Working Parties 4A, 4C, 5A, 5D, 7B, 7C, 7D and Task Group 5/1 (copy for information to Working Parties 3M and 5B) - Progress on WRC-19 agenda item 1.14     WP 5C   AI1.14   2018-06-05
[ 289 ]  
 
Correspondence Group 3J-3M-13 validation examples Report of Activities (2017 - 2018)     Chairman, 3J-3M-13     2018-06-04
[ 288 ]  
 
Multi-year trans-horizon radio propagation measurements at 3.5 GHz     Netherlands (Kingdom of the)     2018-06-04
[ 287 ]  
 
Information document: Engineered surfaces research at the Communications Research Centre Canada for engineering the wireless radio environment     Canada     2018-06-01
[ 286 ]  
 
Proposed draft new ITU-R Question on the impact of engineered surfaces on electromagnetic wave propagation and service coexistence     Canada     2018-06-01
[ 285 ]  
 
Reply liaison statement to ITU-R Working Party 5C (copy for information to Working Parties 3M, 4A, 4C, 5B, 5D, 7B, 7C, 7D and Task Group 5/1) - WRC-19 agenda item 1.14     WP 5A   AI1.14   2018-05-25
[ 284 ]  
 
Correspondence Group 3M-4 Activity Report 2017 - 2018     Chairman, CG 3M-4     2018-05-24
[ 283 ]  
 
Liaison statement to Working Parties 3J and 3M - Analysis of RFI caused to EESS (passive) in the 18.6-18.8 GHz band     WP 7C     2018-05-22
[ 282 ]  
 
Chairman's Report     CG 3K-3M-12     2018-05-21
[ 281 ]  
 
Report on activities of the Correspondence Group - Building entry loss     CG 3J-3K-3M-8     2018-05-18
[ 280 ]  
 
Liaison statement to Working Party 5A - Copied for information to Working Parties 3K, 3M, 5B and 5C - WRC-19 agenda item.1.1 sharing and compatibility studies     WP 6A   AI1.1   2018-05-11
[ 279 ]  
 
Liaison statement to Working Party 7B (copied for information to Working Parties 3M, 5A and 5D) - WRC-19 agenda item 1.3     WP 6A   AI1.3   2018-05-10
[ 278 ]  
 
Liaison statement to Working Party 3K (copy for information to Working Party 3J and Working Party 3M) - Use of Modulation Error Ratio (MER) to assess ducting     WP 6A     2018-05-10
[ 277 ]  
 
Reply liaison statement to Working Party 5C (copy for information to Working Parties 3M, 4C, 5A, 5D, 7B, 7C and 7D) - WRC-19 agenda item 1.14     WP 4A   AI1.14   2018-03-21
[ 276 ]  
 
Liaison statement to Working Party 5B (copy for information to Working Parties 4B, 4C, 5A, 5C, 5D, 6A, 7B, 7C, 7D and 3M) - Draft documents including draft CPM text related to WRC-19 agenda item 1.10, Resolution 426 (WRC-15)     WP 4A   AI1.10   2018-03-21
[ 275 ]  
 
Liaison statement on ITU inter-Sector coordination     ITU-T (TSAG)     2018-03-05
[ 274 ]  
 
Liaison statement reply to ITU-R Working Party 5C (copied for information to Working Parties 3M, 4A, 4C, 5A, 7B, 7C and 7D) - WRC-19 agenda item 1.14     WP 5D     2018-02-12
[ 273 ]  
 
Liaison statement to Working Parties 3K, 3M, 5B, 5C and 6A - Progress report on WRC-19 agenda item 1.1 sharing and compatibility studies     WP 5A     2017-11-22
[ 272 ]  
 
Liaison statement to ITU-R Working Parties 4A, 4C, 5A, 5D, 7B, 7C, 7D and Task Group 5/1 (and copy to Working Parties 3M and 5B for information) - WRC-19 agenda item 1.14     WP 5C     2017-11-22
[ 271 ]  
 
Liaison statement to Working Parties 4A, 4B, 4C, 5A, 5C, 5D, 6A, 7C, 7B, 7D and 3M - Draft documents including draft CPM text related to WRC-19 agenda item 1.10, Resolution 426 (WRC-15)     WP 5B   AI1.10   2017-11-20
[ 270 ]  
 
Liaison statement to Working Party 3K (copy for information to Working Parties 3J and 3M) - Use of Modulation Error Ratio (MER) to assess ducting     WP 6A     2017-10-23
Resultats:419 documents
Résultats :  Précédent -  1 - 2 - 3 - 4 - 5 - 6 - 7 - 8 - 9  - Suivant Next
 
Téléchargement de multiples documents: Cocher les cases correspondant aux documents sélectionnés, puis appuyer sur "Télécharger"
   
 
Préférences utilisateur: 
Téléchargement de multiples documents: Formats et langues à prendre en compte (si disponibles):
Pages de navigation HTML  
Formats  + Autres formats
Langues (maximum 2)  + Multilingue 
(E: Anglais - F: Français - S: Espagnol - A: Arabe - C: Chinois - R: Russe)

Début de page -  Commentaires -  Contactez-nous -  Droits d'auteur © UIT 2008 Tous droits réservés
Contact pour cette page :  Coordinateur du Web UIT-R
Mis à jour le : 2019-08-23