Union Internationale des Télécommunications   UIT
English  Español
 
Plan du site Contactez-nous Copie Imprimable
  Page d'accueil : UIT-T : SG13 : Réunion 2006-01-16 : Contributions Tardives  Ajoutés récemment -  Recherche de documents de réunion
   
UIT-T SG13  D (2006-01-16) 

UIT-T SG13

Réseaux de prochaine génération

Période d'études 2005

Réunion  du 2006-01-16 au 2006-01-27

Lieu : Suisse [Genève]

Autres réunions : 2009-09-01  2009-01-12  2008-09-12  2008-05-22  2008-01-14  2007-09-21  2007-04-16  2006-11-03  2006-07-17  [ 2006-01-16 ]  2005-08-29  2005-04-25  2004-12-07 

Resultats:263 documents
Résultats :  Précédent -  1 - 2 - 3 - 4 - 5 - 6  - Suivant Next
Contributions Tardives  Documents / Contributions
 
Numéro 
Titre Source AI/Question
Date
[ 468 ]  
 
Gap Analysis about "Framework of IPv6 Multi-homing for NGN" between ITU-T and other SDOs     ETRI   Q9/13   2006-01-05
[ 467 ]  
 
Considerations for IPv6 Multi-homing in NGN Environments     ETRI   Q9/13   2006-01-05
[ 466 ]  
 
Enhancement of Living List #2 of Q.3/13 (NGN Architecture Framework for Streaming Services)     ETRI   Q3/13   2006-01-05
[ 465 ]  
 
Authoritative Directory Interoperability FAQ     VeriSign, Inc.   Q2/13   2006-01-05
[ 464 ]  
 
A proposal to initiate the study of FMC service scenario by using PSTN as the fixed access network for UMTS network     China Telecom   Q6/13   2006-01-05
[ 463 ]  
 
Proposal for the study on SIP based Real-time Conversational Voice Services     China Telecom   Q8/13, Q2/13   2006-01-05
[ 462 ]  
 
Some proposals to UPT Service Scenarios over NGN     China Telecom   Q8/13, Q6/13, Q2/13   2006-01-05
[ 461 ]  
 
Proposal for the study on Organization of NGN transport user profile data     China Telecom   Q3/13   2006-01-05
[ 460 ]  
 
Proposal for the study on Organization of NGN service user profile data     China Telecom   Q3/13   2006-01-05
[ 459 ]  
 
Proposal for adding FMC service requirements in "Y.FCM Req"     China Telecom   Q6/13   2006-01-05
[ 458 ]  
 
Proposal for adding basic call control scenario in call server based PES     China Telecom   Q7/13   2006-01-05
[ 457 ]  
 
Proposed changes for the mapping of functional entities to network elements     China Telecom   Q7/13   2006-01-05
[ 456 ]  
 
A proposal for revising the definition of Call Server     China Telecom   Q7/13   2006-01-05
[ 455 ]  
 
Proposed Text for Ub Reference Point in RACF     Lucent Technologies   Q4/13   2006-01-05
[ 454 ]  
 
Proposed Modification for Rq' Reference Point in RACF     Lucent Technologies   Q4/13   2006-01-05
[ 453 ]  
 
Proposed Modification for Go' Reference Point in RACF     Lucent Technologies   Q4/13   2006-01-05
[ 452 ]  
 
Proposed Clarification and Modification for ANF and ENF in RACF     Lucent Technologies   Q4/13   2006-01-05
[ 451 ]  
 
Initial draft Recommendation on NGN service requirements for ID-based applications (Y.idservreqs)     ETRI   Q2/13   2006-01-05
[ 450 ]  
 
Initial draft Recommendation on functional requirements and architecture of the NGN for ID-based applications and services (Y.idarch)     ETRI   Q3/13   2006-01-05
[ 449 ]  
 
Revised initial draft Recommendation Y.mpserv - "Multi-play service scenario deployment model"     Telekomunikacja Polska (Poland)   Q8/13, Q2/13   2006-01-05
[ 448 ]  
 
Proposal to request SG 11 to begin work on signalling aspects of flow aware technology for the timely support of emerging requirements     BT Group   Q4/13, Q3/13   2006-01-05
[ 447 ]  
 
IP QoS Signaling Concepts and Requirements for Flow Aware Services     BT Group   Q4/13, Q3/13   2006-01-05
[ 446 ]  
 
Editorial proposal on TR-RACF     Fujitsu   Q4/13   2006-01-05
[ 445 ]  
 
Proposal of updating Y.1711 for Transport MPLS     Fujitsu   Q5/13   2006-01-05
[ 444 ]  
 
Modifications to Security Requirements for NGN Release 1     France Telecom   Q15/13   2006-01-05
[ 443 ]  
 
Principles for NGN security architecture design     France Telecom   Q15/13   2006-01-05
[ 442 ]  
 
NAPT control and NAT traversal description enhancement of TR-RACF     Oki Electric Industry Co., Ltd.   Q4/13   2006-01-05
[ 441 ]  
 
Clarification of TR-RACF open issues for release 1     OKI Electric Industry Co., Ltd.   Q4/13   2006-01-05
[ 440 ]  
 
Resource reservation and modification request at Rq' in TR-RACF     OKI   Q4/13   2006-01-05
[ 439 ]  
 
Proposed modification of the unified document structure of service scenarios and deployment models     OKI   Q8/13   2006-01-05
[ 438 ]  
 
Editorial Proposals for TR-RACF open issues     OKI   Q4/13   2006-01-05
[ 437 ]  
 
RACF Functional Architecture     France Telecom   Q4/13   2006-01-05
[ 436 ]  
 
RACF architecture - Re reference point     France Telecom   Q4/13   2006-01-05
[ 435 ]  
 
RACF and Signalling protocols     France Telecom   Q4/13   2006-01-05
[ 434 ]  
 
Terminology in TR-RACF and FRA     France Telecom   Q4/13   2006-01-05
[ 433 ]  
 
Use of Mobile IPv6 in NGN environment     Huawei Technologies Co., Ltd.   Q9/13   2006-01-05
[ 432 ]  
 
Updated proposal for Ranged Allocation Example in G.FEPO     Huawei Technologies Co., Ltd.   Q4/13   2006-01-05
[ 431 ]  
 
Resource modification procedure in TR-123.qos     Huawei Technologies Co., Ltd.   Q4/13   2006-01-05
[ 430 ]  
 
Proposed revisions to TR-123.qos     Huawei Technologies Co., Ltd.   Q4/13   2006-01-05
[ 429 ]  
 
Proposed Modification for Rq Reference Point in RACF     Huawei Technologies Co., Ltd.   Q4/13   2006-01-05
[ 428 ]  
 
Proposed Modification for Rp Reference Point in RACF     Huawei Technologies Co., Ltd.   Q4/13   2006-01-05
[ 427 ]  
 
Propose new function of CS-based PSTN/ISDN Emulation Component     Huawei Technologies Co., Ltd.   Q7/13   2006-01-05
[ 426 ]  
 
Proposals for MPLS based Network QoS negotiation procedures     Huawei Technologies Co., Ltd.   Q2/13   2006-01-05
[ 425 ]  
 
Proposals for MPLS based Network Fast Handover mechanism     Huawei Technologies Co., Ltd.   Q2/13   2006-01-04
[ 424 ]  
 
Proposals for harmonizing the style of definitions for hose and pipe     Huawei Technologies Co., Ltd.   Q2/13   2006-01-04
[ 423 ]  
 
Proposal of addition of network adapter to "Draft FGNGN-CSF Version 2" document     Huawei Technologies Co., Ltd.   Q8/13   2006-01-05
[ 422 ]  
 
Proposal for section 7.2.4 of Y.csem     Huawei Technologies Co., Ltd.   Q7/13   2006-01-05
[ 421 ]  
 
Proposal for Sections 7.2.2 & 7.2.4 in Y.NGN-PIEA     Huawei Technologies Co., Ltd.   Q3/13   2006-01-05
[ 420 ]  
 
Proposal for point to multi-points performance metrics     Huawei Technologies Co., Ltd.   Q5/13   2006-01-05
[ 419 ]  
 
Proposal for Objectives of FMC Y.FMC_Req     MII, China   Q6/13   2006-01-05
Resultats:263 documents
Résultats :  Précédent -  1 - 2 - 3 - 4 - 5 - 6  - Suivant Next
 
Téléchargement de multiples documents: Cocher les cases correspondant aux documents sélectionnés, puis appuyer sur "Télécharger"
   
 
Préférences utilisateur: 
Téléchargement de multiples documents: Formats et langues à prendre en compte (si disponibles):
Pages de navigation HTML  
Formats  + Autres formats
Langues (maximum 2)  + Multilingue 
(E: Anglais - F: Français - S: Espagnol - A: Arabe - C: Chinois - R: Russe)

Testez ITU Translate pour la traduction automatique de documents
Début de page -  Commentaires -  Contactez-nous -  Droits d'auteur © UIT 2008 Tous droits réservés
Contact pour cette page :  TSB EDH
Mis à jour le : 2005-11-23