Contributions |
|
Numéro
|
Titre
|
Source
|
AI/Question
|
Date
|
|
[ 309 ]
(Rev.1) |
Review of IEC 62368-1 varistor requirements for possible inclusion in K.77
|
Bourns Limited
|
Q2/5
|
2018-07-29 |
|
[ 308 ]
(Rev.1) |
Draft ITU-T Recommendation L.SIB "Sustainable and intelligent building services"
|
Secretaría de Estado para la Sociedad de la Información y la Agenda Digital (Spain)
|
Q6/5
|
2018-07-26 |
|
[ 307 ]
|
LTspice simulation of metal oxide varistors, MOVs, and the definition of an MOV
|
Bourns Limited
|
Q2/5
|
2018-07-23 |
|
[ 306 ]
(Rev.1) |
The impact of ICTs in national adaptation and mitigation plans for climate change and the environment
|
Autorité Nationale de Régulation des Technologies de l'Information et de la Communication (ANRTIC) (Comoros)
|
Q9/5
|
2018-07-18 |
|
[ 305 ]
|
Clauses applicable to external circuits in IEC 62368-1 Edition 3
|
Bourns Limited
|
Q2/5
|
2018-07-17 |
|
[ 304 ]
|
EMF Measurement in Sudan
|
Telecommunications and Post Regulatory Authority (Sudan)
|
Q3/5
|
2018-07-17 |
|
[ 303 ]
|
DC power interface surge analysis - tests 7.8 and 7.9 of K.20 and K.21
|
Bourns Limited
|
Q2/5
|
2018-07-13 |
|
[ 302 ]
(Rev.1) |
Re-review of C261 (K.21 contribution)
|
Bourns Limited
|
Q2/5
|
2018-07-06 |
|
[ 301 ]
(Rev.1) |
Re-review of C244 (K.20 contribution)
|
Bourns Limited
|
Q2/5
|
2018-07-06 |
|
[ 300 ]
|
Re-review of C243 (K.44 contribution)
|
Bourns Limited
|
Q2/5
|
2018-07-06 |
|
[ 299 ]
|
Testing equipment-powering ports that are not connected to the AC mains supply - Part 9: Proposal consolidation of C291 to C298
|
Bourns Limited
|
Q2/5
|
2018-07-05 |
|
[ 298 ]
|
Testing equipment-powering ports that are not connected to the AC mains supply - Part 8: Updating K.44 for 400 V d.c. powering
|
Bourns Limited
|
Q2/5
|
2018-07-04 |
|
[ 297 ]
|
Testing equipment-powering ports that are not connected to the AC mains supply - Part 7: Test circuit figure to replace K.44 Figure A.6.6-2, Figure A.6.6-1a and Figure A.6.6-1b.
|
Bourns Limited
|
Q2/5
|
2018-07-03 |
|
[ 296 ]
|
Testing equipment-powering ports that are not connected to the AC mains supply - Part 6: Review of 7.8 and 7.9 test entries (K.20 and K.21)
|
Bourns Limited
|
Q2/5
|
2018-07-03 |
|
[ 295 ]
|
Testing equipment-powering ports that are not connected to the AC mains supply - Part 5: Review of DC power feed surge test figures of Table 1b (K.20, K.21 and K.45)
|
Bourns Limited
|
Q2/5
|
2018-07-02 |
|
[ 294 ]
|
Testing equipment-powering ports that are not connected to the AC mains supply - Part 4: DC power feed tests of Tables 1a and 1b (K.20, K.21 and K.45)
|
Bourns Limited
|
Q2/5
|
2018-07-01 |
|
[ 293 ]
|
Testing equipment-powering ports that are not connected to the AC mains supply - Part 3: Powering supply configurations
|
Bourns Limited
|
Q2/5
|
2018-06-30 |
|
[ 292 ]
|
Testing equipment-powering ports that are not connected to the AC mains supply - Part 2: Grid terms review
|
Bourns Limited
|
Q2/5
|
2018-06-30 |
|
[ 291 ]
|
Testing equipment-powering ports that are not connected to the AC mains supply - Part1 Background
|
Bourns Limited
|
Q2/5
|
2018-06-29 |
|
[ 290 ]
|
Proposed new work item on Opportunities of the Circular Economy of E-waste management
|
Rwanda
,
Senegal
|
Q7/5
|
2018-06-28 |
|
[ 289 ]
(Rev.1) |
Proposed new work item on Adequate Assessment and Sensitization on the Impact of Counterfeit Electronics Products on the environment in Africa
|
Kenya
,
Rwanda
,
Tanzania
,
Uganda
|
Q7/5
|
2018-06-28 |
|
[ 288 ]
|
Regional e-waste management strategy for the East African Region
|
Kenya
,
Rwanda
,
Uganda
|
Q7/5
|
2018-06-28 |
|
[ 287 ]
|
End of life Management (EoL) management of communications equipment and products
|
Uganda Communications Commission (UCC)
|
Q7/5
|
2018-06-28 |
|
[ 286 ]
|
Social aspects in the management of e-waste
|
Ministry of Communications and Information Technology (MCIT) (Egypt)
|
Q7/5
|
2018-06-28 |
|
[ 285 ]
|
The Role of Policy, Regulations, Standards in E-Waste Management (Case Study Rwanda)
|
Rwanda
|
Q7/5
|
2018-06-28 |
|
[ 284 ]
|
Extended producer responsibility in developing countries and countries with economies in transition
|
Uganda Communications Commission (UCC)
|
Q7/5
|
2018-06-28 |
|
[ 283 ]
|
Smart Technology for Smart & Sustainable Agriculture in the Arab Region
|
Arab Information and Communication Technology Organization (AICTO)
|
Q9/5
|
2018-06-27 |
|
[ 282 ]
|
Comparison of accreditation standards for e-waste recyclers
|
Ministry of Communications and Information Technology (MCIT) (Egypt)
,
Palestine Technical University Kadoorie (State of Palestine)
,
Sudan
|
Q7/5
|
2018-06-27 |
|
[ 281 ]
|
Proposed new work item on Sustainable management of batteries resulting from ICT equipment Sustainable management of batteries resulting from ICT equipment
|
Kenya
,
Ministry of Communications and Information Technology (MCIT) (Egypt)
,
Palestine Technical University Kadoorie (State of Palestine)
,
Sudan
,
Uganda Communications Commission (UCC)
|
Q7/5
|
2018-06-27 |
|
[ 280 ]
|
Experimental Pilot Plant on e-Waste for Smart Cities based on the circular economy
|
Argentina
|
Q7/5
|
2018-06-26 |
|
[ 279 ]
|
Electromagnetic field measurements to assess human exposure for 5G (IMT 2020) base station
|
Agencia Nacional del Espectro (ANE) (Colombia)
|
Q3/5
|
2018-06-26 |
|
[ 278 ]
|
Integration of K-series ITU T Recommendations for the regulation of compliance with electromagnetic field exposure levels in the Republic of Colombia
|
Agencia Nacional del Espectro (ANE) (Colombia)
|
Q3/5
|
2018-06-26 |
Resultats:132 documents Résultats :
Précédent -
1 -
2 -
3
|
Téléchargement de multiples documents: Formats et langues à prendre en compte (si disponibles):