Contributions |
|
Numéro
|
Titre
|
Source
|
AI/Question
|
Date
|
|
[ 1435 ]
|
G.8271.1 Network Limit
|
Calnex Solutions Limited (United Kingdom)
|
Q13/15
|
2019-06-18 |
|
[ 1434 ]
|
G.8271.1 Measurement Bandwidth for Relative Time Error Network Limit
|
Calnex Solutions Limited (United Kingdom)
|
Q13/15
|
2019-06-18 |
|
[ 1433 ]
|
Distributed ePRTC
|
ADVA Optical Networking (United Kingdom)
|
Q13/15
|
2019-06-18 |
|
[ 1432 ]
|
G.hn BPL - Resignation protocol
|
Integration Silicon Solution Israel ISSI
|
Q18/15
|
2019-06-18 |
|
[ 1431 ]
|
G.8271.1 Relative Time Error Network Limit for Categories 6A and 6B
|
Calnex Solutions Limited (United Kingdom)
|
Q13/15
|
2019-06-18 |
|
[ 1430 ]
|
G.hs: Considerations on P2MP handshake
|
Broadcom Corporation (United States)
|
Q4/15
|
2019-06-18 |
|
[ 1429 ]
|
EVM_RMS measurements using DP-16QAM format
|
Huawei Technologies Co., Ltd. (China)
|
Q6/15
|
2019-06-18 |
|
[ 1428 ]
|
G.mgfast: Updated LDPC code
|
Broadcom Corporation (United States)
|
Q4/15
|
2019-06-18 |
|
[ 1427 ]
|
G. fast: On the use of VCE sections in probe sequence for G.fastback.
|
Broadcom Corporation (United States)
|
Q4/15
|
2019-06-18 |
|
[ 1426 ]
|
G.fast: Proposal to exchange Tret information for DTA
|
Broadcom Corporation (United States)
|
Q4/15
|
2019-06-18 |
|
[ 1425 ]
|
Comments on G.8052.2 FC and LTP object classes
|
Huawei Technologies Co., Ltd. (China)
|
Q14/15
|
2019-06-18 |
|
[ 1424 ]
|
G.mgfast: Proposal for DOI using time and frequency intervals allocated to single line
|
Broadcom Corporation (United States)
|
Q4/15
|
2019-06-18 |
|
[ 1423 ]
|
Comments on G.8052.1 Termination Points
|
Huawei Technologies Co., Ltd. (China)
|
Q14/15
|
2019-06-18 |
|
[ 1422 ]
|
Proposed updates to BNM insert process description in G.8021
|
Huawei Technologies Co., Ltd. (China)
|
Q10/15
|
2019-06-18 |
|
[ 1421 ]
|
Proposed updates to BNM transmission description in G.8013
|
Huawei Technologies Co., Ltd. (China)
|
Q10/15
|
2019-06-18 |
|
[ 1420 ]
|
G.8272 Clarifications
|
Calnex Solutions Limited (United Kingdom)
|
Q13/15
|
2019-06-18 |
|
[ 1419 ]
|
G.8273.2 Appendix VI Typos
|
Calnex Solutions Limited (United Kingdom)
,
Huawei Technologies Co., Ltd. (China)
|
Q13/15
|
2019-06-18 |
|
[ 1418 ]
(Rev.1) |
Proposed characteristics for 25G and 50G OTN interfaces
|
China Information Communication Technologies Group
,
China Telecommunications Corporation
,
Intel Corporation (United States)
,
Microsemi Corporation (United States)
,
Viavi Solutions Deutschland GmbH (Germany)
,
ZTE Corporation (China)
|
Q11/15
|
2019-06-18 |
|
[ 1417 ]
|
Comments and proposed updates to draft revised G.808.2
|
Electronics and Telecommunications Research Institute (ETRI) (Korea (Rep. of))
|
Q11/15
|
2019-06-18 |
|
[ 1416 ]
|
Proposal to new appendix for in-home cable applications
|
China Information Communication Technologies Group
|
Q16/15
|
2019-06-18 |
|
[ 1415 ]
|
Power Penalty for Chirp Parameters in Negative Dispersion Region
|
Nokia USA (United States)
|
Q2/15
|
2019-06-18 |
|
[ 1414 ]
|
MTN path OAM requirements
|
ZTE Corporation (China)
|
Q11/15
|
2019-06-18 |
|
[ 1413 ]
|
Analysis of the potential deviation of the POH through multiple hops
|
ZTE Corporation (China)
|
Q11/15
|
2019-06-18 |
|
[ 1412 ]
|
TDEC considerations for 50G-PON
|
China Information Communication Technologies Group
|
Q2/15
|
2019-06-18 |
|
[ 1411 ]
|
Proposals about the 200G DWDM
|
ZTE Corporation (China)
|
Q6/15
|
2019-06-18 |
|
[ 1410 ]
|
Analysis of the POH mechanisms behave under bit error scenarios
|
ZTE Corporation (China)
|
Q11/15
|
2019-06-18 |
|
[ 1409 ]
|
New work item proposal for path layer protection in a metro transport networe
|
Electronics and Telecommunications Research Institute (ETRI) (Korea (Rep. of))
|
Q11/15
|
2019-06-18 |
|
[ 1408 ]
(Rev.1) |
information about the capabilities of TDCM devices
|
China Unicom
,
ZTE Corporation (China)
|
Q6/15
|
2019-06-18 |
|
[ 1407 ]
|
Proposal to issue an Implementers' Guide for G.8132
|
Electronics and Telecommunications Research Institute (ETRI) (Korea (Rep. of))
|
Q10/15
|
2019-06-18 |
|
[ 1406 ]
|
Considerations about the 25G C-band optical interface in support of 5G transport
|
ZTE Corporation (China)
|
Q6/15
|
2019-06-18 |
|
[ 1405 ]
(Rev.1) |
Thoughts on evolution of OTN
|
ZTE Corporation (China)
|
Q11/15
|
2019-06-18 |
|
[ 1404 ]
|
Method of client switching for cell based OTN solution
|
ZTE Corporation (China)
|
Q11/15
|
2019-06-18 |
|
[ 1403 ]
(Rev.1) |
Considerations on 25G/50G OTN interface
|
China Information Communication Technologies Group
,
China Telecommunications Corporation
,
ZTE Corporation (China)
|
Q11/15
|
2019-06-18 |
|
[ 1402 ]
|
Requirement of device in co-fiber transmission system of QKD and WDM
|
China Telecommunications Corporation
,
China Unicom
,
Ministry of Industry and Information Technology (MIIT) (China)
,
QuantumCTek Co., Ltd. (China)
|
Q7/15
|
2019-06-18 |
|
[ 1401 ]
|
IWF Profile Translation [G.8275]
|
Microsemi Corporation (United States)
|
Q13/15
|
2019-06-18 |
|
[ 1400 ]
|
Proposal to standardize technical requirements of UHD video service over G.hn
|
China Unicom
,
Huawei Technologies Co., Ltd. (China)
,
ZTE Corporation (China)
|
Q18/15
|
2019-06-18 |
|
[ 1399 ]
(Rev.1) |
Estimation of protection switching time for MTN Path layer linear protection
|
China Information Communication Technologies Group
|
Q11/15
|
2019-06-18 |
|
[ 1398 ]
|
Considerations on MTN Path layer linear protection
|
China Information Communication Technologies Group
|
Q11/15
|
2019-06-18 |
|
[ 1397 ]
|
Synchronization performance of G.698.4
|
China Information Communication Technologies Group
,
China Unicom
|
Q6/15, Q13/15
|
2019-06-18 |
|
[ 1396 ]
|
Simplified version of GNSS common-view for monitoring
|
China Information Communication Technologies Group
,
China Unicom
|
Q13/15
|
2019-06-18 |
|
[ 1395 ]
|
Feasibility and test results of remotely tunable 25G NRZ interface
|
China Unicom
,
Telefon AB - LM Ericsson (Sweden)
|
Q6/15
|
2019-06-18 |
|
[ 1394 ]
|
Updated Parameter Values for Equipment Clock [G.8273.4]
|
Microsemi Corporation (United States)
|
Q13/15
|
2019-06-18 |
|
[ 1393 ]
|
Updates to Budgeting of Equipment Clock based on Network Limit [G.8273.4]
|
Microsemi Corporation (United States)
|
Q13/15
|
2019-06-18 |
|
[ 1392 ]
|
Holdover based on SyncE parameter 'a1' [G.8273.2]
|
Microsemi Corporation (United States)
|
Q13/15
|
2019-06-18 |
|
[ 1391 ]
|
MTN Section Layer frame format considerations
|
Broadcom Corporation (United States)
,
China Information Communication Technologies Group
,
Ciena Canada
,
Viavi Solutions Deutschland GmbH (Germany)
|
Q11/15
|
2019-06-18 |
|
[ 1390 ]
|
Dynamic noise high-pass filtered value [G.8273.4]
|
Microsemi Corporation (United States)
|
Q13/15
|
2019-06-18 |
|
[ 1389 ]
|
Note on measuring cTE under variable temperature [G.8273.2, G.8273.4]
|
Microsemi Corporation (United States)
|
Q13/15
|
2019-06-18 |
|
[ 1387 ]
|
Simplified version of GNSS common-view for monitoring
Not yet uploaded
|
China Unicom
|
Q13/15
|
2019-06-18 |
|
[ 1386 ]
|
Proposal to add 25G application in Q6 Recommendations
|
ADVA Optical Networking (United Kingdom)
,
China Information Communication Technologies Group
,
China Telecommunications Corporation
,
China Unicom
,
Deutsche Telekom AG (Germany)
,
Huawei Technologies Co., Ltd. (China)
,
KDDI Corporation (Japan)
,
Telecom Italia S.p.A. (Italy)
,
Telefon AB - LM Ericsson (Sweden)
,
ZTE Corporation (China)
|
Q6/15
|
2019-06-18 |
|
[ 1385 ]
|
The general features of 25G/50G OTN interfaces
|
China Information Communication Technologies Group
,
China Telecommunications Corporation
,
Huawei Technologies Co., Ltd. (China)
,
KDDI Corporation (Japan)
,
Ministry of Industry and Information Technology (MIIT) (China)
,
Telecom Italia S.p.A. (Italy)
,
ZTE Corporation (China)
|
Q11/15
|
2019-06-18 |
Resultats:380 documents Résultats :
Précédent -
1 -
2 -
3 -
4 -
5 -
6 -
7 -
8
- Suivant
|
Téléchargement de multiples documents: Formats et langues à prendre en compte (si disponibles):