Contributions |
|
Numéro
|
Titre
|
Source
|
AI/Question
|
Date
|
|
[ 1190 ]
|
Proposed specification for ETH/ETH-eai_A and ETH/ETH-meai_A functions
|
Huawei
|
Q9/15
|
2011-01-31 |
|
[ 1189 ]
|
Proposed specification for ETH/ETH-ea_A and ETH/ETH-mea_A functions
|
Huawei
|
Q9/15
|
2011-01-31 |
|
[ 1188 ]
|
A simple model for the PDV introduced in a packet-switching NE
|
Anue Systems
|
Q13/15
|
2011-01-31 |
|
[ 1187 ]
|
Considerations about new functions on OTN equipment
|
China United Network Communications Group
|
Q9/15
|
2011-01-31 |
|
[ 1186 ]
|
Some Considerations about In-band OSNR Measurement
|
China United Network Communications Group
|
Q6/15
|
2011-01-31 |
|
[ 1185 ]
|
The requirements of time/phase synchronization over SDH interface
|
China Unicom
,
Huawei
|
Q13/15
|
2011-01-31 |
|
[ 1184 ]
|
Rate Change Considerations during BWR in G.hao
|
PMC-Sierra
|
Q11/15
|
2011-01-31 |
|
[ 1183 ]
|
Clarifications to G.hao
|
PMC-Sierra
|
Q11/15
|
2011-01-31 |
|
[ 1182 ]
|
Time of Day Interfaces
|
Zarlink Semiconductor
|
Q13/15
|
2011-01-31 |
|
[ 1181 ]
|
Equivalence of percentile-selection and time-selection [G.8260]
|
Zarlink Semiconductor
|
Q13/15
|
2011-01-31 |
|
[ 1180 ]
|
Usefulness of MTIE mask for PPS output from BC/PRTC
|
Zarlink Semiconductor
|
Q13/15
|
2011-01-31 |
|
[ 1179 ]
|
Packet Selected PDV metric for frequency transfer [G.8260]
|
Zarlink Semiconductor
|
Q13/15
|
2011-01-31 |
|
[ 1178 ]
|
How cluster selection metric may fulfill packet metrics requirements
|
Zarlink Semiconductor
|
Q13/15
|
2011-01-31 |
|
[ 1177 ]
|
Diagram for metric's model flow [G.8260]
|
Zarlink Semiconductor
|
Q13/15
|
2011-01-31 |
|
[ 1176 ]
|
Comparison of pkt selected MTIE and MATIE
|
Zarlink Semiconductor
|
Q13/15
|
2011-01-31 |
|
[ 1175 ]
|
Considerations on 100GE PCS BIP8 Transparency
|
Avalon Microelectronics
|
Q11/15
|
2011-01-31 |
|
[ 1174 ]
|
Evolution of G.8011 Ethernet Services
|
Ericsson Canada
|
Q12/15, Q10/15
|
2011-01-31 |
|
[ 1173 ]
|
G.8032 Appendix
|
Ericsson Canada
|
Q9/15
|
2011-01-31 |
|
[ 1172 ]
|
RingID for identifying R-APS
|
Ericsson Canada
|
Q9/15
|
2011-01-31 |
|
[ 1171 ]
|
Comments on G.8010 Amendment 2
|
Ericsson Canada
|
Q9/15, Q12/15
|
2011-01-31 |
|
[ 1170 ]
|
1:1 path protection capable of load sharing for G.8031
|
Ericsson Canada
|
Q9/15
|
2011-01-31 |
|
[ 1169 ]
|
Proposal to align G.8021 with IEEE 802.1Q ingress VID filtering
|
Ericsson Canada
|
Q9/15, Q12/15
|
2011-01-31 |
|
[ 1168 ]
|
G.ptneq consent
|
Canada
|
Q9/15
|
2011-01-31 |
|
[ 1167 ]
|
PBB model for G.8021 & G.8010
|
Ericsson Canada
|
Q9/15, Q14/15, Q12/15
|
2011-01-31 |
|
[ 1166 ]
|
Comparison of J.211 and Synchronous Ethernet/IEEE 1588
|
Zarlink Semiconductor
|
Q13/15
|
2011-01-31 |
|
[ 1165 ]
|
MPLS and Y.1731
|
Ericsson Canada
|
Q10/15
|
2011-01-31 |
|
[ 1164 ]
|
MAC Operations using Y.1731
|
Alcatel-Lucent USA
,
Verizon
|
Q9/15, Q14/15, Q10/15
|
2011-01-31 |
|
[ 1163 ]
|
Proposal for a structure for the Recommendation ITU-T G.8272
|
IDT
|
Q13/15
|
2011-01-31 |
|
[ 1162 ]
|
Proposal for the scope of the Recommendation ITU-T G.8273
|
IDT
|
Q13/15
|
2011-01-31 |
|
[ 1161 ]
|
MAC Operations using Y.1731 Motivation and Rationale
|
Alcatel-Lucent USA
,
Verizon
|
Q9/15, Q14/15, Q10/15
|
2011-01-31 |
|
[ 1160 ]
|
Roles and Layers for G.ptneq
|
NSN
|
Q9/15
|
2011-01-31 |
|
[ 1159 ]
|
Future revision to Recommendation ITU-T G.657 (bend insensitive SMF)
|
Corning
|
Q5/15
|
2011-01-31 |
|
[ 1158 ]
|
Future revision to Recommendation ITU-T G.654
|
Corning
|
Q8/15, Q5/15
|
2011-01-31 |
|
[ 1157 ]
|
G.ploam: Proposed Text for Upstream Xlog Test Parameter
|
ASSIA
,
AT&T
|
Q4/15
|
2011-01-31 |
|
[ 1156 ]
|
G.vector: Proposal for Upstream Xlog Test Parameter for G.vector
|
ASSIA
,
AT&T
|
Q4/15
|
2011-01-31 |
|
[ 1155 ]
|
G.hnem: G.hnem management
|
ASSIA
,
AT&T
,
Aware
,
Maxim Integrated Product
,
Texas Instruments
|
Q4/15
|
2011-01-31 |
|
[ 1154 ]
|
G.Gen, G.hx, G.cx: G.hn and G.cx management
|
ASSIA
,
AT&T
,
Aware
,
Marvell Semiconductor
|
Q4/15
|
2011-01-31 |
|
[ 1153 ]
|
G.hn: Time-Varying Broadband Powerline (BPL) Interference into VDSL2
|
ASSIA
,
AT&T
|
Q4/15
|
2011-01-31 |
|
[ 1152 ]
|
G.hn: Broadband Powerline (BPL) Interference into VDSL2 on Drop Lines: Measurements and Analyses
|
ASSIA
,
AT&T
|
Q4/15
|
2011-01-31 |
|
[ 1151 ]
|
Wavelength Proposal on TEE to HEE direction in G.sdapp
|
ZTE
|
Q6/15
|
2011-01-31 |
|
[ 1150 ]
|
G.inp: Update to G.inp working text on OLR transition time with VDSL2
|
Ikanos
|
Q4/15
|
2011-01-30 |
|
[ 1149 ]
|
G.INP: Proposed messages for SRA in ADSL mode
|
Broadcom
,
Ikanos
|
Q4/15
|
2011-01-30 |
|
[ 1148 ]
|
A proposal to start a new Recommendation for "Narrow band, sub 1 GHz, wireless transceivers - PHY & MAC layer specifications"
|
AT&T
|
Q4/15
|
2011-01-30 |
|
[ 1147 ]
(Rev.1) |
G.vdsl: Framework for sending t1t4 timestamp messages in eoc for ToD phase synchronization
|
Ikanos
|
Q4/15
|
2011-01-30 |
|
[ 1146 ]
|
G.671 PON Splitter Amendment
|
BT
|
Q7/15
|
2011-01-28 |
|
[ 1145 ]
|
G.652E - Telecommunications fibres with improved performance inheriting their specification from G.657a1
|
BT
|
Q5/15
|
2011-01-28 |
|
[ 1144 ]
|
ITU-T G.652(E) & G.657 Telecommunications fibres - Enhanced Geometry Amendment
|
BT
|
Q5/15
|
2011-01-28 |
|
[ 1143 ]
(Rev.1) |
MPLS-TP Standards
|
United Kingdom
|
Q9/15, Q14/15, Q12/15, Q10/15
|
2011-01-28 |
|
[ 1142 ]
|
Multilane interface jitter specification
|
JDSU
|
Q15/15
|
2011-01-28 |
|
[ 1141 ]
|
Proposal for the OTN specific management entity of G.874.1
|
Fiberhome Technologies Group
|
Q14/15
|
2011-01-28 |
Resultats:2390 documents Résultats :
Précédent -
1 -
2 -
3 -
4 -
5 -
6 -
7 -
8 -
9 -
10 -
11 -
12 -
13 -
14 -
15 -
16 -
17 -
18 -
19 -
20 -
21 -
22 -
23 -
24 -
25 -
26 -
27 -
28 -
29 -
30 -
31 -
32 -
33 -
34 -
35 -
36 -
37 -
38 -
39 -
40 -
41 -
42 -
43 -
44 -
45 -
46 -
47 -
48
- Suivant
|
Téléchargement de multiples documents: Formats et langues à prendre en compte (si disponibles):