Contributions |
|
Numéro
|
Titre
|
Source
|
AI/Question
|
Date
|
|
[ 36 ]
(Rev.1) |
Liaison statement to Joint Task Group 4-5-6-7 (copy for information to the relevant Working Parties of Study Groups 1, 3, 4, 5, 6 and 7) - WRC-15 Agenda item 1.1 operating characteristics of AMT systems
|
WP 5B
|
|
2012-11-09 |
|
[ 35 ]
|
Liaison statement to Joint Task Group 4-5-6-7 WRC-15 Agenda item 1.1 (copy to Working Parties 1A, 3K, 3M, 4A, 4B, 4C, 5A, 5C, 5D and 7C for information)
|
WP 5B
|
|
2012-11-09 |
|
[ 34 ]
|
Liaison statement to Working Party 3K (copy to JTG 4-5-6-7, Working Parties 5A, 5C and 5D for information) on the correlation of short-term interfering signals
|
WP 6A
|
|
2012-11-02 |
|
[ 33 ]
|
Liaison statement to Joint Task Group 4-5-6-7 - Sharing parameters for WRC-15 Agenda item 1.2
|
WP 5D
|
|
2012-10-16 |
|
[ 32 ]
|
Liaison statement to Joint Task Group 4-5-6-7 - Initial information on spectrum requirements studies for WRC-15 Agenda item 1.1
|
WP 5D
|
|
2012-10-16 |
|
[ 31 ]
|
Liaison statement to Joint Task Group 4-5-6-7 on suitable frequency ranges under WRC-15 Agenda item 1.1
|
WP 5D
|
|
2012-10-16 |
|
[ 30 ]
|
Liaison statement to Working Party 3K - Method of the aggregate e.i.r.p. value assessment from multiple LTE user equipment operating simultaneously with the notified base station
|
WP 5D
|
|
2012-07-23 |
|
[ 29 ]
+Ann.1-10 |
Report on the meeting of Working Party 3K (Geneva, 18 - 27 June 2012)
|
Chairman, WP 3K
|
|
2012-07-04 |
|
[ 28 ]
|
Final List of Participants - Working Party 3K (Geneva, 18-27 June 2012)
|
Director, BR
|
|
2012-06-27 |
|
[ 27 ]
|
Liaison statement to Joint Task Group 4-5-6-7 - WRC-15 Agenda item 1.1 (Copy to Working Parties 1A, 3K, 3M, 4A, 4B, 4C, 5A, 5C, 5D and 7C for information)
|
WP 5B
|
|
2012-06-22 |
|
[ 26 ]
|
List of documents issued
|
BR Study Groups Department
|
|
2012-06-15 |
|
[ 25 ]
|
Proposed modification of Recommendation ITU-R P.1411-6 - Correction notes for typographical errors and ambiguity clarification
|
Korea (Republic of)
|
|
2012-06-11 |
|
[ 24 ]
|
Proposed revision of Recommendation ITU-R P.1411-6 - Modification of the structure for multipath models
|
Korea (Republic of)
|
211-5/3
|
2012-06-11 |
|
[ 23 ]
|
Proposed modification of Recommendation ITU-R P.1411-6 - Propagation data and prediction methods for the planning of short-range outdoor radiocommunication systems and radio local area networks in the frequency range 300 MHz to 100 GHz
|
Korea (Republic of)
|
|
2012-06-11 |
|
[ 22 ]
|
Proposed definition of "location probability" in terrestrial broadcasting
|
European Broadcasting Union
|
|
2012-06-11 |
|
[ 21 ]
|
Aeronautical and satellite link propagation method
|
Correspondence Group 3K-3
|
|
2012-06-11 |
|
[ 20 ]
|
Numerical treatment of short paths in Recommendation ITU-R P.1546
|
TELEKOMUNIKACJA POLSKA S.A.
|
203-5/3
|
2012-06-11 |
|
[ 19 ]
|
The use of GlobCover clutter data for prediction, according to Recommendation ITU-R P.1812
|
TELEKOMUNIKACJA POLSKA S.A.
|
203-5/3
|
2012-06-11 |
|
[ 18 ]
|
Supporting information for Recommendation ITU-R P.1238-7 Section 3 - Power loss coefficient and standard deviation for short-range indoor propagation environment only for LOS scenarios at 2.3-2.4 GHz and 1.7-1.8 GHz.
|
China (People's Republic of)
|
|
2012-06-11 |
|
[ 17 ]
|
Preliminary proposal of modification of Recommendation ITU-R P.1238-7 - Multipath fading characteristics of MIMO communication channel in corridor environment at 2.53 GHz
|
China (People's Republic of)
|
|
2012-06-11 |
|
[ 16 ]
|
Proposed revision of Recommendation ITU-R P.1411-6 - Proposed modification of contents structure
|
Japan
|
211-5/3
|
2012-06-11 |
|
[ 15 ]
|
Proposed revision of Recommendation ITU-R P.1411-6 - Addition of new path categories
|
Japan
|
211-5/3
|
2012-06-11 |
|
[ 14 ]
|
Proposed revision to Recommendation ITU-R P.1411-6 - Propagation and prediction methods for the planning of short-range outdoor radiocommunication systems and radio local area networks in the frequency range 300 MHz to 100 GHz - rms delay spread in the 1.92-6 GHz band
|
United Kingdom of Great Britain and Northern Ireland
|
|
2012-06-08 |
|
[ 13 ]
|
Proposed revision to Recommendation ITU-R P.1238-7 - Propagation data and prediction methods for the planning of indoor radiocommunication systems and radio local area networks in the frequency range 900 MHz to 100 GHz
|
United Kingdom of Great Britain and Northern Ireland
|
|
2012-06-08 |
|
[ 12 ]
|
Propagation data required for the design of land-mobile to land-mobile telecommunication systems
|
Germany (Federal Republic of)
|
|
2012-06-08 |
|
[ 11 ]
|
Revision of Recommendation ITU-R P.1546-4
|
Hungary
|
|
2012-06-06 |
|
[ 10 ]
|
Proposed modification to Recommendation ITU-R P.1812-2
|
Iran (Islamic Republic of)
|
|
2012-06-07 |
|
[ 9 ]
|
Report on the Work of Correspondence Group 3K3
|
United States of America
|
|
2012-06-04 |
|
[ 8 ]
|
Preliminary draft new Opinion - ITU-R [XX]
|
United States of America
|
|
2012-06-04 |
|
[ 7 ]
|
Discussion document on Handbooks
|
United States of America
|
|
2012-06-04 |
|
[ 6 ]
|
Liaison statement to ITU-R WPs 3K, 3M, 4A, 4C, 5A, 5C, 5D, 6A, 7B, 7C, 7D and the International Maritime Organization (IMO) and International Association of Marine AIDS to Navigation and Lighthouse Authorities (IALA) - World Radiocommunication Conference (WRC-15) Agenda item 1.15
|
WP 5B
|
|
2012-06-06 |
|
[ 5 ]
|
Liaison statement to Joint Task Group 4-5-6-7 - WRC-15 Agenda item 1.1 (copy to Working Party 1A, Working Party 3K, Working Party 3M, Working Party 4A, Working Party 4B, Working Party 4C, Working Party 5A, Working Party 5C, Working Party 5D and Working Party 7C for information)
|
WP 5B
|
|
2012-06-01 |
|
[ 4 ]
|
Liaison statement to Working Party 3K - Impact of global warming on ITU-R Recommendations - Interference assessment over cold and warm sea paths
|
WP 6A
|
|
2012-05-14 |
|
[ 3 ]
|
Draft liaison statement to Study Group 3 and Working Party 3K - Draft new Report ITU-R BS.[DRM26LOCAL]- Digital Radio Mondiale (DRM) in the 26 MHz band (25 670 - 26 100 kHz)
|
WP 6A
|
|
2012-05-14 |
|
[ 2 ]
|
Question ITU-R 77-7/5 to be brought to the attention of Study Group 3
|
SG 5
|
|
2012-03-26 |
|
[ 1 ]
|
Agenda for the meeting of Working Party 3 K (Geneva, 18-27 June 2012) (opening at 10:45 hours on 18 June 2012)
|
WP 3K
|
|
2012-01-26 |
Resultats:161 documents Résultats :
Précédent -
1 -
2 -
3 -
4
-
|
Téléchargement de multiples documents: Formats et langues à prendre en compte (si disponibles):