Contributions |
|
Numéro
|
Titre
|
Source
|
AI/Question
|
Date
|
|
[ 499 ]
|
Proposals for EEC Jitter Limits in G.paclock
|
Ericsson
|
Q13/15
|
2007-05-24 |
|
[ 498 ]
|
Proposals for Appendix IX in G.8261
|
Ericsson
|
Q13/15
|
2007-05-24 |
|
[ 497 ]
|
Proposals for Test Cases in appendix VI in G.8261
|
Ericsson
|
Q13/15
|
2007-05-24 |
|
[ 496 ]
|
Proposals for clause 8.1 in G.8261
|
Ericsson
|
Q13/15
|
2007-05-24 |
|
[ 495 ]
|
Proposals for models in Appendix V in G.8261
|
Ericsson
,
Cisco
|
Q13/15
|
2007-05-24 |
|
[ 494 ]
|
Proposal to include PMD limit of 40G system for several modulation formats in G.696.1
|
NTT
|
Q6/15
|
2007-05-24 |
|
[ 493 ]
|
Proposed modification for G.8131 Amendment
|
Fujitsu
|
Q9/15
|
2007-05-24 |
|
[ 492 ]
|
Consideration on T-MPLS connections and its server layer
|
Fujitsu
|
Q12/15
|
2007-05-24 |
|
[ 491 ]
|
Proposed update for G.8112
|
Fujitsu
|
Q12/15, Q11/15
|
2007-05-24 |
|
[ 490 ]
|
Consideration for GFP UPI in T-MPLS and MPLS
|
Fujitsu
|
Q11/15
|
2007-05-24 |
|
[ 489 ]
|
APS protocol for Ethernet Ring Protection (G.8032)
|
Fujitsu
|
Q9/15
|
2007-05-24 |
|
[ 488 ]
|
Comments and proposed modification for draft G.8132
|
Fujitsu
|
Q9/15
|
2007-05-24 |
|
[ 487 ]
|
Proposed work plan for Q9
|
Fujitsu
|
Q9/15
|
2007-05-24 |
|
[ 486 ]
|
Comments on APS MEG level in G.8032
|
Hitachi
|
Q9/15
|
2007-05-24 |
|
[ 485 ]
|
Proposal of text modification in G.8031
|
Hitachi
|
Q9/15
|
2007-05-24 |
|
[ 484 ]
|
Comment on Connectivity Monitoring in G.8011.4
|
Hitachi
|
Q11/15
|
2007-05-24 |
|
[ 483 ]
|
Proposed structure for G.pacmod
|
Nortel
|
Q13/15
|
2007-05-24 |
|
[ 482 ]
|
Clarification to sections in current draft of G.paclock
|
Nortel
|
Q13/15
|
2007-05-24 |
|
[ 481 ]
|
Additional considerations for specification of STM-256 jitter in G.783 and G.825
|
Nortel
|
Q13/15
|
2007-05-24 |
|
[ 480 ]
|
SSM processing time considerations
|
Nortel
|
Q13/15
|
2007-05-24 |
|
[ 479 ]
|
G.vdsl: VDSL2 FEXT Cancellation Performance Estimates in Remote Deployments
|
Actelis Networks
|
Q4/15
|
2007-05-24 |
|
[ 478 ]
|
Request for Home Nework study in SG15
|
Japan
|
Q1/15
|
2007-05-24 |
|
[ 477 ]
|
ADSL2plus Performance Impact Experiments with L2 Mode Fluctuating Crosstalk
|
BT
|
Q4/15
|
2007-05-24 |
|
[ 476 ]
|
Powerline Channel Data
|
Intel Corp.
,
Intellon Corp.
,
Gigle Semiconductor
,
Conexant Systems, Inc.
|
Q4/15
|
2007-05-24 |
|
[ 475 ]
|
G.hn System Requirements
|
Intel Corp.
|
Q4/15
|
2007-05-24 |
|
[ 474 ]
|
A proposed modification to Signal Degrade in G.8031v2
|
ETRI
|
Q9/15
|
2007-05-24 |
|
[ 473 ]
|
G.hn: A Proposal to incorporate CCMP encryption for Network Security
|
Infineon Technologies AG
|
Q4/15
|
2007-05-24 |
|
[ 472 ]
|
Relations between interface types of Packet Transport Networks
|
Deutsche Telekom
|
Q11/15
|
2007-05-24 |
|
[ 471 ]
|
VS Technical Clarification
|
Huawei Technologies Co., Ltd
,
China Telecom Co., Ltd
|
Q12/15
|
2007-05-24 |
|
[ 470 ]
|
Trigger events for auditing process
|
Huawei Technologies Co., Ltd
|
Q14/15
|
2007-05-24 |
|
[ 469 ]
|
1+1/1:1 protection switching mechanism for RMPS
|
Huawei Technologies Co., Ltd
|
Q9/15
|
2007-05-24 |
|
[ 468 ]
|
Requirement of partial protection switching for RMPS
|
Huawei Technologies Co., Ltd
|
Q9/15
|
2007-05-24 |
|
[ 467 ]
|
Proposal for an over-clocked OTN structure (supplement) recommendation
|
Huawei Technologies Co., Ltd
|
Q11/15
|
2007-05-24 |
|
[ 466 ]
|
Proposals for multi-lane 100GE transport
|
Huawei
|
Q11/15
|
2007-05-24 |
|
[ 465 ]
|
Proposal on OAM model and Ring APS for Ethernet ring protection
|
Huawei
|
Q9/15
|
2007-05-24 |
|
[ 464 ]
|
Proposal on OAM Model for T-MPLS SPRing
|
Huawei Technologies Co., Ltd
|
Q9/15
|
2007-05-24 |
|
[ 463 ]
|
Proposal for Application Code and Parameter Values in G.dapp2
|
MII
,
China Telecom, China United Telecom
,
China Mobile
,
ZTE Corporation
,
P.R. China Huawei Technologies Co., Ltd
|
Q6/15
|
2007-05-24 |
|
[ 462 ]
|
Proposal for FC over T-MPLS
|
Huawei Technologies Co., Ltd
|
Q9/15
|
2007-05-24 |
|
[ 461 ]
|
Considerations in Sync Ethernet over OTN
|
Huawei Technologies Co., Ltd
|
Q13/15, Q11/15, Q9/15
|
2007-05-24 |
|
[ 460 ]
|
Consideration about the time requirement
|
Huawei Technologies Co., Ltd
|
Q13/15
|
2007-05-24 |
|
[ 459 ]
|
Connections between ring nodes on T-MPLS ring
|
Huawei Technologies Co., Ltd
|
Q9/15
|
2007-05-24 |
|
[ 458 ]
|
Proposals on a flexible multiplexing/mapping scheme
|
Huawei Technologies Co., Ltd
|
Q11/15
|
2007-05-24 |
|
[ 457 ]
|
Considerations on the evolution of OTN
|
Huawei Technologies Co., Ltd
|
Q11/15
|
2007-05-24 |
|
[ 456 ]
|
G.VDSL: Further information for the SOS proposal
|
Ministry of Information Industry of the P.R. China
,
Huawei Technologies Co., Ltd.
|
Q4/15
|
2007-05-24 |
|
[ 455 ]
|
G.vdsl: More Results on Performance of a Physical-Layer Retransmission Scheme
|
Huawei Technologies Co., Ltd.
,
Ministry of Information Industry of the P.R. China
|
Q4/15
|
2007-05-24 |
|
[ 454 ]
|
G.VDSL,Ploam: Modifications in G.993.2 and G.997.1 for SOS functionality
|
Ministry of Information Industry, P.R. China, Huaw
|
Q4/15
|
2007-05-24 |
|
[ 453 ]
|
G.vdsl: Proposal for New Recommendation on FEXT Cancellation for use with VDSL2 Transceivers
|
Huawei Technologies Co., Ltd
|
Q4/15
|
2007-05-24 |
|
[ 452 ]
|
G.vdsl: More Information about Bivariate Histogram for Impulse Noise Monitor
|
Huawei Technologies Co., Ltd, P.R. China
|
Q4/15
|
2007-05-24 |
|
[ 451 ]
|
OMCI for 802.1ad QoS support
|
Huawei Technologies (Ltd), China
|
Q2/15
|
2007-05-24 |
|
[ 450 ]
|
3GPP contributions addressing the need for a clarification of the synchronization requirement at the input of the base stations (for information)
|
France Telecom
|
Q13/15
|
2007-05-24 |
Resultats:332 documents Résultats :
Précédent -
1 -
2 -
3 -
4 -
5 -
6 -
7
- Suivant
|
Téléchargement de multiples documents: Formats et langues à prendre en compte (si disponibles):