Contributions |
|
Numéro
|
Titre
|
Source
|
AI/Question
|
Date
|
|
[ 346 ]
|
Consideration on time schedule on IMT-2020 candidate technology evaluation and development
|
China (People's Republic of)
|
|
2020-09-27 |
|
[ 345 ]
|
Consideration on IMT-2020 evaluation process extension
|
China (People's Republic of)
|
|
2020-09-27 |
|
[ 344 ]
|
Views on Recommendation ITU-R M.2012 revision process and schedule aligned with the PDNR ITU-R M.[IMT-2020.SPECS] process
|
China (People's Republic of)
|
|
2020-09-27 |
|
[ 343 ]
|
Proposal for developments of Addendum 8 to Circular Letter 5/LCCE/59 and updated workplan for Circular Letter
|
China (People's Republic of)
,
Korea (Republic of)
|
|
2020-09-27 |
|
[ 342 ]
|
Proposal on the preliminary draft new Report ITU-R M.[IMT.FUTURE TECHNOLOGY TRENDS]
|
China (People's Republic of)
|
|
2020-09-27 |
|
[ 341 ]
|
Proposal on working document towards a preliminary draft new Report ITU-R M.[IMT.C-V2X]
|
China (People's Republic of)
|
|
2020-09-27 |
|
[ 340 ]
|
Proposal on the drafting working document towards a preliminary draft new Report ITU-R M.[IMT-2020.TDD.SYNCHRONIZATION]
|
China (People's Republic of)
|
|
2020-09-27 |
|
[ 339 ]
|
Proposal on the preliminary simulation results for the evaluation part of Report ITU-R M.[IMT-2020.TDD.SYNCHRONIZATION]
|
China (People's Republic of)
|
|
2020-09-27 |
|
[ 338 ]
|
Basic principles and suggestions to promote discussion on AAS antenna pattern modelling
|
China (People's Republic of)
|
|
2020-09-27 |
|
[ 337 ]
|
Proposal on draft revision of Recommendation ITU-R M.1036-6
|
China (People's Republic of)
|
|
2020-09-27 |
|
[ 336 ]
|
Proposed draft working document for sharing and compatibility studies of IMT systems in the frequency band 3 3000-3 800 MHz
|
China (People's Republic of)
|
|
2020-09-27 |
|
[ 335 ]
|
Proposed modification to the working document on characteristics of terrestrial component of IMT for sharing and compatibility studies in preparation for WRC-23
|
China (People's Republic of)
|
|
2020-09-27 |
|
[ 334 ]
|
Preliminary draft new Recommendation ITU-R M.[IMT-2020.SPECS] - Detailed specifications of the terrestrial radio interfaces of International Mobile Telecommunications-2020 (IMT-2020)
|
Director, BR
|
|
2020-10-01 |
|
[ 333 ]
|
Liaison statement from ITU-D Study Group 1 Question 5/1 to ITU-R Working Party 5D on comments and information on the draft final Report - ITU-D Study Group 1 Question 5/1 - Telecommunications/ICTs for rural and remote areas
|
ITU-D SG 1
|
|
2020-09-30 |
|
[ 332 ]
|
Liaison statement from ITU-D Study Group 1 Question 2/1 to ITU-R Working Party 5D on comments and information on the draft final Report - ITU-D Study Group 1 Question 2/1 - Strategies, policies, regulations and methods of migration and adoption of digital broadcasting and implementation of new services
|
ITU-D SG 1
|
|
2020-09-30 |
|
[ 331 ]
|
Liaison statement from ITU-D Study Group 1 Q1/1 to ITU-R Working Party 5D on comments and information on the draft final Report - ITU-D Study Group 1 Question 1/1: Strategies and policies for the deployment of broadband in developing countries
|
ITU-D SG 1
|
|
2020-09-30 |
|
[ 330 ]
|
Proposals for the preliminary draft new Report ITU-R M.[IMT.FUTURE TECHNOLOGY TRENDS]
|
Telefon AB - LM Ericsson
|
|
2020-09-28 |
|
[ 329 ]
|
Update on activities in Region 3
|
Region 3 Rapporteur
|
|
2020-09-30 |
|
[ 328 ]
|
IMT parameters for WRC-23 agenda item 1.2
|
EMEA Satellite Operators Association (ESOA)
|
AI1.2
|
2020-09-28 |
|
[ 327 ]
|
WRC-23 agenda item 1.2
|
EMEA Satellite Operators Association (ESOA)
|
AI1.2
|
2020-09-28 |
|
[ 326 ]
|
WRC-23 "Article 21" (WRC-19 Doc. 550)
|
EMEA Satellite Operators Association (ESOA)
|
|
2020-09-28 |
|
[ 325 ]
|
Correspondence received regarding the preliminary draft new Recommendation ITU-R M.[IMT-2020.SPECS] - ("Certification C")
|
Director, BR
|
|
2020-09-29 |
|
[ 324 ]
|
Answer to ITU-R Working Party 5D liaison statement on development of a draft new Report ITU-R M.[IMT.C-V2X] - Application of the terrestrial component of IMT for cellular - V2X
|
Director, BR
|
|
2020-09-29 |
|
[ 323 ]
|
Proposal towards the working document towards a preliminary draft new Report ITU-R M.[IMT TERRESTRIAL BROADBAND REMOTE COVERAGE]
|
Bharti Airtel Limited
|
|
2020-09-29 |
|
[ 322 ]
|
Proposal for the organization of Task Group 6/1
|
United Arab Emirates
|
|
2020-09-28 |
|
[ 321 ]
|
Proposal for revision of IMT parameters for sharing and compatibility studies
|
Egypt (Arab Republic of)
,
United Arab Emirates
|
|
2020-09-28 |
|
[ 320 ]
|
Proposal for further updating of working document towards a preliminary draft new Report ITU-R M.[IMT.AAS] - Modelling of Advanced Antenna Systems (AAS) in IMT-2020 systems for use in sharing studies
|
India (Republic of)
|
|
2020-09-28 |
|
[ 319 ]
|
Proposal for further updating of working document towards a preliminary draft new Report ITU-R M.[IMT.AAS] - Modelling of Advanced Antenna Systems (AAS) in IMT-2020 systems for use in sharing studies
|
India (Republic of)
|
|
2020-09-28 |
|
[ 318 ]
|
Update on antenna pattern measurements of commercial AAS base stations and their relationship with the ITU-R antenna pattern model used in sharing studies
|
Telefon AB - LM Ericsson
,
Huawei Technologies Sweden AB
,
Nokia Corporation
|
|
2020-09-28 |
|
[ 317 ]
|
A proposed liaison statement to External Organizations on the evolution of IMT-2020 and system beyond
|
Telefon AB - LM Ericsson
|
|
2020-09-28 |
|
[ 316 ]
|
Proposal towards the working document M.[IMT TERRESTRIAL BROADBAND REMOTE COVERAGE]
|
Telefon AB - LM Ericsson
|
|
2020-09-28 |
|
[ 315 ]
|
Proposal to amend the workplan for the working document M.[IMT TERRESTRIAL BROADBAND REMOTE COVERAGE]
|
Huawei Technologies Sweden AB
,
Nokia Corporation
,
Qualcomm, Inc.
,
Samsung Electronics Co., Ltd.
,
Telefon AB - LM Ericsson
,
ZTE Corporation
|
|
2020-09-28 |
|
[ 314 ]
|
Proposed modifications to work plan for WRC-23 agenda item 1.4
|
Egypt (Arab Republic of)
,
United Arab Emirates
|
AI1.4
|
2020-09-28 |
|
[ 313 ]
|
Proposed modifications to work plan for WRC-23 agenda item 1.2
|
Egypt (Arab Republic of)
,
United Arab Emirates
|
AI1.2
|
2020-09-28 |
|
[ 312 ]
|
Proposed modifications to Work Plan for WRC-23 agenda item 1.1
|
Egypt (Arab Republic of)
,
United Arab Emirates
|
AI1.1
|
2020-09-28 |
|
[ 311 ]
|
Applicability of RR No. 21.5 to AAS systems
|
Egypt (Arab Republic of)
,
United Arab Emirates
|
|
2020-09-28 |
|
[ 310 ]
|
Proposal for conducting sharing and compatibility studies in the 3 300-3 800 MHz frequency bands
|
Egypt (Arab Republic of)
,
United Arab Emirates
|
|
2020-09-28 |
|
[ 309 ]
|
Working document towards preliminary draft CPM text for WRC-23 agenda item 1.2
|
Egypt (Arab Republic of)
,
United Arab Emirates
|
AI1.2
|
2020-09-28 |
|
[ 308 ]
|
Comments on WRC-23 agenda item 1.1
|
Egypt (Arab Republic of)
,
United Arab Emirates
|
|
2020-09-28 |
|
[ 307 ]
|
Possible Correspondence Group activities between the October 2020 and February 2021 meetings of Working Party 5D
|
Chairman, WG Spectrum Aspects & WRC-23 Preparation
|
|
2020-09-28 |
|
[ 306 ]
|
Proposal for a liaison statement to External Organizations invitation to participate on the study towards development of new Report on "Future technology trends"
|
Nokia Corporation
,
Huawei Technologies Sweden AB
,
Samsung Electronics Co., Ltd.
|
|
2020-09-28 |
|
[ 305 ]
|
Compatibility measures between terrestrial IMT and satellite IMT in the bands 1 980-2 010 MHz and 2 170-2 200 MHz
|
Inmarsat Ltd.
|
|
2020-09-28 |
|
[ 304 ]
|
Elements related to the PDNR ITU-R SA.[IMT-EESS/SRS COORDINATION]
|
European Space Agency
,
European Organisation for the Exploitation of Meteorological Satellites
|
|
2020-09-28 |
|
[ 303 ]
|
IMT parameters for use in WRC-23 studies
|
France
|
|
2020-09-28 |
|
[ 302 ]
|
Spectrum needs and usage for WRC-23 agenda item 1.5
|
GSMA
|
|
2020-09-28 |
|
[ 301 ]
|
IMT parameters for use in WRC-23 studies
|
GSMA
|
|
2020-09-28 |
|
[ 300 ]
|
Elements for discussions of RR No. 21.5 and RR Table 21-2
|
GSMA
|
|
2020-09-28 |
|
[ 299 ]
|
Preliminary draft new Recommendation on "Generic unwanted emission characteristics of base stations using the terrestrial radio interfaces of IMT-2020"
|
Rohde & Schwarz
|
|
2020-09-28 |
|
[ 298 ]
|
Proposal for a new Report on technical characteristics, operational aspects and capabilities associated with specific industrial and enterprise applications of using IMT
|
Motorola Solutions Inc.
|
|
2020-09-28 |
|
[ 297 ]
|
Update on activities in ASMG
|
ASMG Rapporteur
|
|
2020-09-28 |
Resultats:1796 documents Résultats :
Précédent -
1 -
2 -
3 -
4 -
5 -
6 -
7 -
8 -
9 -
10 -
11 -
12 -
13 -
14 -
15 -
16 -
17 -
18 -
19 -
20 -
21 -
22 -
23 -
24 -
25 -
26 -
27 -
28 -
29 -
30 -
31 -
32 -
33 -
34 -
35 -
36
- Suivant
|
Téléchargement de multiples documents: Formats et langues à prendre en compte (si disponibles):