Union Internationale des Télécommunications   UIT
English  Español
 
Plan du site Contactez-nous Copie Imprimable
  Page d'accueil : UIT-T : SG05 : Réunion 2012-04-11 : Documents Temporaires  Ajoutés récemment -  Recherche de documents de réunion
   
UIT-T SG05  TD-GEN (2012-04-11) 

UIT-T SG05

ICT and climate change

Période d'études 2009

Réunion  du 2012-04-11 au 2012-04-19

Lieu : Suisse [Genève]

Autres réunions : 2012-10-08  [ 2012-04-11 ]  2011-09-20  2011-04-27  2010-11-23  2010-10-01  2010-04-12  2010-01-19  2009-10-12  2009-05-25  2008-11-24 

Resultats:204 documents
Résultats :  Précédent -  1 - 2 - 3 - 4 - 5  - Suivant Next
Documents Temporaires  (GEN)   Documents / Contributions
 
Numéro 
Titre Source AI/Question
Date
[ 1057-GEN ]  
(Rev.1-6) 
New Draft of the ITU-T Recommendation K.guide     Rapporteur Q3/5   Q3/5   2012-03-30
[ 1056-GEN ]  
(Rev.1-3) 
Proposal of revised text for the description of Question 18/5 for the next study period     Rapporteur Q18/5   Q18/5   2012-03-30
[ 1055-GEN ]  
 
Survey results: What should we do next concerning ICT and adaptation to climate change?     Rapporteurs Q23/5   Q23/5, Q22/5   2012-03-30
[ 1054-GEN ]  
(Rev.1-4) 
Draft recommendation L.m&m     Editors L.M&M   Q17/5   2012-03-30
[ 1053-GEN ]  
 
The wave shape to be used for testing the protection module or circuit at RRU and inverter ports with DC power cable     Rapporteur Q6/5   Q6/5, Q5/5   2012-03-30
[ 1052-GEN ]  
(Rev.1) 
Revision of the draft of new Recommendation K.dbs "Lightning protection of Distributed Base Station"     Rapporteur Q6/5   Q6/5, Q5/5   2012-03-30
[ 1051-GEN ]  
 
Incoming LS: LS to ETSI ATTM-AT3 and ITU-T SG 5 on potential disturbance and interference between radio devices and cable television networks (20-22 March 2012, Boulder, USA)     ITU-T SG9   Q8/5   2012-03-30
[ 1050-GEN ]  
(Rev.1) 
Suggested revision of Q23 description and mandate     Rapporteurs Q23/5   Q23/5   2012-03-27
[ 1049-GEN ]  
 
Output of ITU-T Question 18/5 Rapporteur's meeting on ITU-T L.methodology ICT projects, "Methodology for environmental impacts assessment of ICT projects"     Editor   Q18/5   2012-03-27
[ 1048-GEN ]  
(Rev.1) 
Draft text of K.injury     Rapporteur Q11/5   Q11/5   2012-03-27
[ 1047-GEN ]  
(Rev.1) 
Summary of the HNSG     Chairman WP1/5   Q9/5, Q8/5, Q6/5, Q5/5, Q4/5, Q13/5, Q11/5, Q10/5   2012-03-26
[ 1046-GEN ]  
 
Summary and Agenda for Q11     Rapporteur Q11/5   Q11/5   2012-03-26
[ 1045-GEN ]  
(Rev.1) 
Resistibility Guide, 3rd draft with editorial corrections     Rapporteur Q4/5   Q4/5   2012-03-26
[ 1044-GEN ]  
(Rev.1-2) 
Revised Draft Recommendation K.im_bb - "Immunity to Broadband disturbance for home network device" - for consent     Rapporteur Q8/5   Q8/5   2012-03-23
[ 1043-GEN ]  
(Rev.1-2) 
Revision of Recommendation K.47 "Protection of telecommunication lines against direct lightning flashes"     Rapporteur Q5/5   Q5/5   2012-03-23
[ 1042-GEN ]  
 
Report of Q21 Rapporteur Meeting held in Torino (2-3 February 2012)     Rapporteur Q21/5   Q21/5   2012-03-23
[ 1041-GEN ]  
(Rev.1) 
Amendments to K.44     Chairman WP1/5   Q4/5   2012-03-20
[ 1040-GEN ]  
 
Incoming LS: Smart Grid related issues (representative and deliverables)     JCA-SG HN   QALL/5   2012-03-20
[ 1039-GEN ]  
 
Incoming LS: Letter regarding IEC 62700: DC Power Supply for Portable Personal Computer     IEC TC 100   Q21/5   2012-03-13
[ 1038-GEN ]  
(Rev.1-2) 
Revision of Recommendation K.46 "Protection of telecommunication lines using metallic symmetric conductors against lightning induced surges"     Rapporteur Q5/5   Q5/5   2012-03-12
[ 1037-GEN ]  
(Rev.1-3) 
Fifth draft Recommendation "Mutual-disturbance Test Method for Performance Degradation Evaluation of Converged Terminal Devices"     Rapporteur Q16/5   Q16/5   2012-03-09
[ 1036-GEN ]  
(Rev.1-4) 
Draft work plan and room allocation     TSB   QALL/5   2012-03-05
[ 1035-GEN ]  
(Rev.1-2) 
Draft new Recommendation K.henv "Conducted and Radiated electromagnetic environment in home networking" for consent     Associate Rapporteur Q8/5   Q8/5   2012-02-28
[ 1034-GEN ]  
 
Incoming LS: Liaison statement to ITU-T Study Group 5     ITU-D Q24/1   Q21/5   2012-02-27
[ 1033-GEN ]  
 
Incoming LS: Liaison statement on draft Recommendation Y.energyMRM "Energy Measurement Reference Model"     WP2/13   Q17/5   2012-02-27
[ 1032-GEN ]  
 
Incoming LS: Invitation to nominate a representative     JCA-Cloud   QALL/5   2012-02-16
[ 1031-GEN ]  
 
Draft of L.adapter Phase2     Rapporteur Q21/5   Q21/5   2012-02-16
[ 1030-GEN ]  
 
Questions proposed for study during the next study period (2013-2016)     TSB   QALL/5   2012-02-10
[ 1029-GEN ]  
 
RESOLUTION ITU-R 60 - Reduction of energy consumption for environmental protection and mitigating climate change by use of ICT/radiocommunication technologies and systems     TSB   Q23/5, Q22/5, Q21/5, Q19/5, Q18/5, Q17/5   2012-02-06
[ 1028-GEN ]  
 
Incoming LS: Liaison letter to ITU-T SG5 on universal Li-ion battery solution     IEC TC 100   Q21/5   2012-01-20
[ 1027-GEN ]  
 
Incoming LS: Contributions by Study Groups to CWG-WCIT12     TSAG   QALL/5   2012-01-20
[ 1026-GEN ]  
 
Incoming LS: Liaison Statement on wireless hearing aid compatibility     JCA-AHF   QALL/5   2012-01-20
[ 1025-GEN ]  
 
Incoming LS: Reply to JCA-CIT (Ref: JCA-CIT-LS 4-E) on draft document on CIT needs     ITU-T SG15   QALL/5   2012-01-20
[ 1024-GEN ]  
 
Incoming LS: LS - ITU-T FG Cloud final output documents     ITU-T FG Cloud   QALL/5   2012-01-20
[ 1023-GEN ]  
 
Conclusions of the second ITU-T | JTC 1 joint leadership meeting, 6 November 2011     ITU-T Liaison Officer to JTC 1   QALL/5   2011-12-15
[ 1022-GEN ]  
 
Incoming LS: LS to TSAG and ITU-T SGs on pre-defined form to document the establishment of work items towards new Recommendations     ITU-T SG16   QALL/5   2011-12-15
[ 1021-GEN ]  
 
Incoming LS: Reply LS to TSAG, JCA-CIT and ITU-T SGs on draft document on Conformance and Interoperability Testing (CIT) needs for review and comment by the Study Groups (JCA-CIT-LS4)     ITU-T SG16   QALL/5   2011-12-15
[ 1020-GEN ]  
 
Incoming LS: Reply LS on ITU-T work on possible disturbance/interference between radio devices and broadband cable and TV networks     ITU-T SG9   Q8/5   2011-12-15
[ 1019-GEN ]  
 
Incoming LS: Techniques to mitigate disturbance/interference between radio devices and cable or equipment connected to broadband networks and TV networks     ITU-R WP5D   Q8/5   2011-12-15
[ 1018-GEN ]  
 
Incoming LS: LS from JCA-AHF on Meeting report of Joint Coordination Activity on Accessibility and Human Factors (JCA-AHF)     JCA-AHF   QALL/5   2011-12-15
[ 1017-GEN ]  
 
Incoming LS: Reply to JCA-CIT (Ref: JCA-CIT-LS 4-E) on draft document on CIT needs     ITU-T SG9   QALL/5   2011-12-15
[ 1016-GEN ]  
 
Incoming LS: ETSI TC-EE Work Item on network level power     ETSI TC EE   Q17/5   2011-12-15
[ 1015-GEN ]  
 
Incoming LS: Liaison to ITU-T SG5 on control/monitoring and telecom performance metric standard     ETSI TC EE   Q17/5   2011-12-15
[ 1014-GEN ]  
 
Incoming LS: Draft Handbook on "Network performance testing and control monitoring for guarantee required QoS for NGN services"     ITU-T SG11   QALL/5   2011-12-15
[ 1013-GEN ]  
 
Incoming LS: Reply to [JCA-CIT - LS 5 - E] regarding JCA-CIT draft document on Conformance and Interoperability Testing (CIT) needs     ITU-T SG11   QALL/5   2011-12-15
[ 1012-GEN ]  
 
Incoming LS: Request for feedback on draft revision of Supplement 62 to ITU-T Q series Recommendations     ITU-T SG11   QALL/5   2011-12-15
[ 1011-GEN ]  
 
Incoming LS: Approval of ETSI TS 103 199     ETSI TC EE   Q18/5   2011-12-15
[ 1010-GEN ]  
 
Incoming LS: Reply LS on cooperation with Q17/5     ECMA TC 38   Q17/5   2011-12-13
[ 1009-GEN ]  
 
Report of the ISO/IEC JTC 1 Plenary meeting, 7-12 November 2011     ITU-T Liaison officer to JTC 1   QALL/5   2011-12-13
[ 1008-GEN ]  
 
Output of ITU-T Question 18/5 e-meeting, 11 October 2011, on draft Recommendation ITU-T L.methodology ICT projects, "Methodology for environmental impacts assessment of ICT projects"     Editor   Q18/5   2011-12-13
Resultats:204 documents
Résultats :  Précédent -  1 - 2 - 3 - 4 - 5  - Suivant Next
 
Téléchargement de multiples documents: Cocher les cases correspondant aux documents sélectionnés, puis appuyer sur "Télécharger"
   
 
Préférences utilisateur: 
Téléchargement de multiples documents: Formats et langues à prendre en compte (si disponibles):
Pages de navigation HTML  
Formats  + Autres formats
Langues (maximum 2)  + Multilingue 
(E: Anglais - F: Français - S: Espagnol - A: Arabe - C: Chinois - R: Russe)

Testez ITU Translate pour la traduction automatique de documents
Début de page -  Commentaires -  Contactez-nous -  Droits d'auteur © UIT 2008 Tous droits réservés
Contact pour cette page :  TSB EDH
Mis à jour le : 2024-11-18