Documents Temporaires
(GEN)
|
|
Numéro
|
Titre
|
Source
|
AI/Question
|
Date
|
|
[ 1057-GEN ]
(Rev.1-6) |
New Draft of the ITU-T Recommendation K.guide
|
Rapporteur Q3/5
|
Q3/5
|
2012-03-30 |
|
[ 1056-GEN ]
(Rev.1-3) |
Proposal of revised text for the description of Question 18/5 for the next study period
|
Rapporteur Q18/5
|
Q18/5
|
2012-03-30 |
|
[ 1055-GEN ]
|
Survey results: What should we do next concerning ICT and adaptation to climate change?
|
Rapporteurs Q23/5
|
Q23/5, Q22/5
|
2012-03-30 |
|
[ 1054-GEN ]
(Rev.1-4) |
Draft recommendation L.m&m
|
Editors L.M&M
|
Q17/5
|
2012-03-30 |
|
[ 1053-GEN ]
|
The wave shape to be used for testing the protection module or circuit at RRU and inverter ports with DC power cable
|
Rapporteur Q6/5
|
Q6/5, Q5/5
|
2012-03-30 |
|
[ 1052-GEN ]
(Rev.1) |
Revision of the draft of new Recommendation K.dbs "Lightning protection of Distributed Base Station"
|
Rapporteur Q6/5
|
Q6/5, Q5/5
|
2012-03-30 |
|
[ 1051-GEN ]
|
Incoming LS: LS to ETSI ATTM-AT3 and ITU-T SG 5 on potential disturbance and interference between radio devices and cable television networks (20-22 March 2012, Boulder, USA)
|
ITU-T SG9
|
Q8/5
|
2012-03-30 |
|
[ 1050-GEN ]
(Rev.1) |
Suggested revision of Q23 description and mandate
|
Rapporteurs Q23/5
|
Q23/5
|
2012-03-27 |
|
[ 1049-GEN ]
|
Output of ITU-T Question 18/5 Rapporteur's meeting on ITU-T L.methodology ICT projects, "Methodology for environmental impacts assessment of ICT projects"
|
Editor
|
Q18/5
|
2012-03-27 |
|
[ 1048-GEN ]
(Rev.1) |
Draft text of K.injury
|
Rapporteur Q11/5
|
Q11/5
|
2012-03-27 |
|
[ 1047-GEN ]
(Rev.1) |
Summary of the HNSG
|
Chairman WP1/5
|
Q9/5, Q8/5, Q6/5, Q5/5, Q4/5, Q13/5, Q11/5, Q10/5
|
2012-03-26 |
|
[ 1046-GEN ]
|
Summary and Agenda for Q11
|
Rapporteur Q11/5
|
Q11/5
|
2012-03-26 |
|
[ 1045-GEN ]
(Rev.1) |
Resistibility Guide, 3rd draft with editorial corrections
|
Rapporteur Q4/5
|
Q4/5
|
2012-03-26 |
|
[ 1044-GEN ]
(Rev.1-2) |
Revised Draft Recommendation K.im_bb - "Immunity to Broadband disturbance for home network device" - for consent
|
Rapporteur Q8/5
|
Q8/5
|
2012-03-23 |
|
[ 1043-GEN ]
(Rev.1-2) |
Revision of Recommendation K.47 "Protection of telecommunication lines against direct lightning flashes"
|
Rapporteur Q5/5
|
Q5/5
|
2012-03-23 |
|
[ 1042-GEN ]
|
Report of Q21 Rapporteur Meeting held in Torino (2-3 February 2012)
|
Rapporteur Q21/5
|
Q21/5
|
2012-03-23 |
|
[ 1041-GEN ]
(Rev.1) |
Amendments to K.44
|
Chairman WP1/5
|
Q4/5
|
2012-03-20 |
|
[ 1040-GEN ]
|
Incoming LS: Smart Grid related issues (representative and deliverables)
|
JCA-SG HN
|
QALL/5
|
2012-03-20 |
|
[ 1039-GEN ]
|
Incoming LS: Letter regarding IEC 62700: DC Power Supply for Portable Personal Computer
|
IEC TC 100
|
Q21/5
|
2012-03-13 |
|
[ 1038-GEN ]
(Rev.1-2) |
Revision of Recommendation K.46 "Protection of telecommunication lines using metallic symmetric conductors against lightning induced surges"
|
Rapporteur Q5/5
|
Q5/5
|
2012-03-12 |
|
[ 1037-GEN ]
(Rev.1-3) |
Fifth draft Recommendation "Mutual-disturbance Test Method for Performance Degradation Evaluation of Converged Terminal Devices"
|
Rapporteur Q16/5
|
Q16/5
|
2012-03-09 |
|
[ 1036-GEN ]
(Rev.1-4) |
Draft work plan and room allocation
|
TSB
|
QALL/5
|
2012-03-05 |
|
[ 1035-GEN ]
(Rev.1-2) |
Draft new Recommendation K.henv "Conducted and Radiated electromagnetic environment in home networking" for consent
|
Associate Rapporteur Q8/5
|
Q8/5
|
2012-02-28 |
|
[ 1034-GEN ]
|
Incoming LS: Liaison statement to ITU-T Study Group 5
|
ITU-D Q24/1
|
Q21/5
|
2012-02-27 |
|
[ 1033-GEN ]
|
Incoming LS: Liaison statement on draft Recommendation Y.energyMRM "Energy Measurement Reference Model"
|
WP2/13
|
Q17/5
|
2012-02-27 |
|
[ 1032-GEN ]
|
Incoming LS: Invitation to nominate a representative
|
JCA-Cloud
|
QALL/5
|
2012-02-16 |
|
[ 1031-GEN ]
|
Draft of L.adapter Phase2
|
Rapporteur Q21/5
|
Q21/5
|
2012-02-16 |
|
[ 1030-GEN ]
|
Questions proposed for study during the next study period (2013-2016)
|
TSB
|
QALL/5
|
2012-02-10 |
|
[ 1029-GEN ]
|
RESOLUTION ITU-R 60 - Reduction of energy consumption for environmental protection and mitigating climate change by use of ICT/radiocommunication technologies and systems
|
TSB
|
Q23/5, Q22/5, Q21/5, Q19/5, Q18/5, Q17/5
|
2012-02-06 |
|
[ 1028-GEN ]
|
Incoming LS: Liaison letter to ITU-T SG5 on universal Li-ion battery solution
|
IEC TC 100
|
Q21/5
|
2012-01-20 |
|
[ 1027-GEN ]
|
Incoming LS: Contributions by Study Groups to CWG-WCIT12
|
TSAG
|
QALL/5
|
2012-01-20 |
|
[ 1026-GEN ]
|
Incoming LS: Liaison Statement on wireless hearing aid compatibility
|
JCA-AHF
|
QALL/5
|
2012-01-20 |
|
[ 1025-GEN ]
|
Incoming LS: Reply to JCA-CIT (Ref: JCA-CIT-LS 4-E) on draft document on CIT needs
|
ITU-T SG15
|
QALL/5
|
2012-01-20 |
|
[ 1024-GEN ]
|
Incoming LS: LS - ITU-T FG Cloud final output documents
|
ITU-T FG Cloud
|
QALL/5
|
2012-01-20 |
|
[ 1023-GEN ]
|
Conclusions of the second ITU-T | JTC 1 joint leadership meeting, 6 November 2011
|
ITU-T Liaison Officer to JTC 1
|
QALL/5
|
2011-12-15 |
|
[ 1022-GEN ]
|
Incoming LS: LS to TSAG and ITU-T SGs on pre-defined form to document the establishment of work items towards new Recommendations
|
ITU-T SG16
|
QALL/5
|
2011-12-15 |
|
[ 1021-GEN ]
|
Incoming LS: Reply LS to TSAG, JCA-CIT and ITU-T SGs on draft document on Conformance and Interoperability Testing (CIT) needs for review and comment by the Study Groups (JCA-CIT-LS4)
|
ITU-T SG16
|
QALL/5
|
2011-12-15 |
|
[ 1020-GEN ]
|
Incoming LS: Reply LS on ITU-T work on possible disturbance/interference between radio devices and broadband cable and TV networks
|
ITU-T SG9
|
Q8/5
|
2011-12-15 |
|
[ 1019-GEN ]
|
Incoming LS: Techniques to mitigate disturbance/interference between radio devices and cable or equipment connected to broadband networks and TV networks
|
ITU-R WP5D
|
Q8/5
|
2011-12-15 |
|
[ 1018-GEN ]
|
Incoming LS: LS from JCA-AHF on Meeting report of Joint Coordination Activity on Accessibility and Human Factors (JCA-AHF)
|
JCA-AHF
|
QALL/5
|
2011-12-15 |
|
[ 1017-GEN ]
|
Incoming LS: Reply to JCA-CIT (Ref: JCA-CIT-LS 4-E) on draft document on CIT needs
|
ITU-T SG9
|
QALL/5
|
2011-12-15 |
|
[ 1016-GEN ]
|
Incoming LS: ETSI TC-EE Work Item on network level power
|
ETSI TC EE
|
Q17/5
|
2011-12-15 |
|
[ 1015-GEN ]
|
Incoming LS: Liaison to ITU-T SG5 on control/monitoring and telecom performance metric standard
|
ETSI TC EE
|
Q17/5
|
2011-12-15 |
|
[ 1014-GEN ]
|
Incoming LS: Draft Handbook on "Network performance testing and control monitoring for guarantee required QoS for NGN services"
|
ITU-T SG11
|
QALL/5
|
2011-12-15 |
|
[ 1013-GEN ]
|
Incoming LS: Reply to [JCA-CIT - LS 5 - E] regarding JCA-CIT draft document on Conformance and Interoperability Testing (CIT) needs
|
ITU-T SG11
|
QALL/5
|
2011-12-15 |
|
[ 1012-GEN ]
|
Incoming LS: Request for feedback on draft revision of Supplement 62 to ITU-T Q series Recommendations
|
ITU-T SG11
|
QALL/5
|
2011-12-15 |
|
[ 1011-GEN ]
|
Incoming LS: Approval of ETSI TS 103 199
|
ETSI TC EE
|
Q18/5
|
2011-12-15 |
|
[ 1010-GEN ]
|
Incoming LS: Reply LS on cooperation with Q17/5
|
ECMA TC 38
|
Q17/5
|
2011-12-13 |
|
[ 1009-GEN ]
|
Report of the ISO/IEC JTC 1 Plenary meeting, 7-12 November 2011
|
ITU-T Liaison officer to JTC 1
|
QALL/5
|
2011-12-13 |
|
[ 1008-GEN ]
|
Output of ITU-T Question 18/5 e-meeting, 11 October 2011, on draft Recommendation ITU-T L.methodology ICT projects, "Methodology for environmental impacts assessment of ICT projects"
|
Editor
|
Q18/5
|
2011-12-13 |
Resultats:204 documents Résultats :
Précédent -
1 -
2 -
3 -
4 -
5
- Suivant
|
Téléchargement de multiples documents: Formats et langues à prendre en compte (si disponibles):