International Telecommunication Union   ITU
Français  Espańol
 
Site map Contact Us Print version
  Home : ITU-R : WP-7D : Contributions  Recently posted -  Search Meeting Documents
   
ITU-R WP-7D  C 

ITU-R WP-7D

Radio Astronomy

Results:244 total items.
Result page:  Previous -  1 - 2 - 3 - 4 - 5
Contributions  Documents / Contributions
 
Number 
Title Source AI/Question
Date
[ 44 ]  
 
Liaison statement to Working Parties 1B, 5B, 5C and 7D - WRC-23 agenda item 1.1     WP 5D   AI1.1   2020-10-27
[ 43 ]  
 
Reply liaisons statement to Working Parties 3K and 3M (copy for information to Working Parties 5A, 5B, 5C, 5D, 6A and 7D) - Issues related to propagation for sharing studies in Task Group 6/1     TG 6-1   AI1.5   2020-10-26
[ 42 ]  
 
Liaison statement from Task Group 6/1 to contributing Working Parties 5A, 5B, 5C, 5D, 6A and 7D (copy to Working Parties 3K and 3M for information) - Preparations for WRC-23 agenda item 1.5 - Information for sharing and compatibility studies     TG 6-1   AI1.5   2020-10-26
[ 41 ]  
 
Liaison statement from Task Group 6/1 to contributing Working Parties 5A, 5B, 5C, 5D, 6A and 7D - Preparations of WRC-23 agenda item 1.5 - Information on spectrum use and spectrum needs of existing services within the frequency band 470-960 MHz in Region 1     TG 6-1     2020-10-26
[ 40 ]  
(Rev.1) 
List of assignments that the Administration of Iran (Islamic Republic of) had notified to the Bureau and that are within the frequency bands subject to WRC-23 agenda items     Iran (Islamic Republic of)     2020-10-21
[ 39 ]  
 
Response liaison statement on 3GPP's activities related to WRC-19 Resolutions     Director, BR     2020-10-26
[ 38 ]  
 
Liaison statement to Working Parties 4A, 4C, 5A, 5B, 5C, 6A, 7B, 7C and 7D (copy to Task Group 6/1 for information) - WRC-23 agenda item 1.4     WP 5D   AI1.4   2020-10-21
[ 37 ]  
 
Reply liaison statement to ITU-R Working Parties 3K and 3M (copy to Working Parties 1B, 3J, 4A, 4B, 4C, 5A, 5B, 5C, 7B, 7C, and 7D for information) - Preparations for WRC-23 agenda items 1.1 and 1.2     WP 5D   AI1.2, AI1.1   2020-10-21
[ 36 ]  
 
Liaison statement to Working Party 7C (copy to Working Parties 1B, 3J, 3K, 3L, 3M, 4A, 5A, 5B, 5C, 5D and 7D) - WRC-23 agenda item 9.1 topic a)     WP 6A   AI9.1 A)   2020-10-19
[ 35 ]  
 
Reply liaison statement to Working Party 5A (copy for information to Working Party 7D) - Working document towards a preliminary draft new Report ITU-R M.[100-GHZ.RSTT.EESS.COEXIST]     WP 7C     2020-10-06
[ 34 ]  
 
Liaison statement to Working Party 5B (copy to Working Parties 5A, 5C and 7D for information) - Questions on working documents towards preliminary draft new Reports ITU-R M.[FOD 92-100 GHz] and ITU-R M.[FOD_EESS_SHARE]     WP 7C     2020-10-06
[ 33 ]  
 
Reply liaison statement to Working Party 1A (copy to ITU-R Working Parties 1C, 4A, 4B, and 7D) - Protection of EESS (passive) remote sensors against interference caused by radiation from electrical or electronic equipment     WP 7C     2020-10-05
[ 32 ]  
 
Reply liaison statement to Working Party 7D - WRC-23 agenda item 1.14     WP 7C   AI1.14   2020-10-05
[ 31 ]  
 
Reply liaison statement to Working Party 7D - Modification to the list of radio telescopes capable of operating in the frequency band 10.6-1.7 GHz in Annex 2 to Recommendation ITU-R RS.2066     WP7C     2020-10-05
[ 30 ]  
 
Liaison statement to Working Parties 1B, 3J, 3K, 3L, 3M, 4A, 4C, 5A, 5B, 5C, 5D, 6A and 7D - Work to be conducted by Working Party 7C under WRC-23 agenda item 9.1, topic a)     WP 7C   AI19.1A)   2020-10-05
[ 29 ]  
 
Reply liaison statement to Working Parties 3M, 5A, 5B, 5C and 7D (copy to Working Party 7C for information) - WRC-23 agenda item 1.13 - Characteristics and protection criteria for systems operating in the fixed, mobile (including aeronautical mobile), and radio astronomy services in the frequency band 14.8-15.35 GHz or in adjacent bands     WP 7B   AI1.13   2020-09-28
[ 28 ]  
+Ann.1-5 
Report of the meeting of Working Party 7D (e-Meeting, 14-18 September 2020)     Chairman, WP 7D     2020-09-18
[ 27 ]  
 
Final list of participants - Working Party 7D (e-Meeting, 14-18 September 2020)     Director, BR     2020-09-18
[ 26 ]  
 
List of Documents issued (Documents 7D/1 - 7D/26)     BR Study Groups Department     2020-09-14
[ 25 ]  
 
Working document towards a draft revision of Report ITU-R RA.2259 - Characteristics of radio quiet zones     CG rwp7d-rqz     2020-09-07
[ 24 ]  
 
Proposal of draft reply liaison statement to Working Party 5D regarding WRC-23 agenda item 1.4     Brazil (Federative Republic of)   AI1.4   2020-09-07
[ 23 ]  
 
Revision of the title of Recommendation ITU-R RA.1031     IUCAF     2020-09-03
[ 22 ]  
 
Proposal for a draft new Question regarding the VLBI Global Observing System (VGOS)     Finland , Committee on Radio Astronomy Frequencies , France , Germany (Federal Republic of) , Norway , Spain , Switzerland (Confederation of)     2020-09-03
[ 21 ]  
 
Initial reply liaison statement to Working Party 5D (copied for information to Working Parties 1B, 4A, 4B, 4C, 5A, 5B, 5C, 7B, 7C and 7D) - WRC-23 agenda items 1.1 and 1.2     WPs 3K and 3M   AI1.2, AI1.1   2020-08-28
[ 20 ]  
 
Initial reply liaison statement to Working Party 7B (copy to Working Parties 5A, 5C, 7C and 7D for information) - WRC-23 agenda item 1.13     WP 3M   AI1.13   2020-08-28
[ 19 ]  
 
Reply liaison statement to Working Party 5B (copy to Working Parties 4A, 5A, 5C, 7C and 7D for information) - WRC-23 agenda item 1.10     WPs 3K and 3M   AI1.10   2020-08-25
[ 18 ]  
 
Liaison statement to Working Party 7C (copy to Working Parties 5A, 5C and 7D for information) - Updates to working documents towards a preliminary draft new Reports ITU-R M.[FOD 92-100 GHz] and ITU-R M.[FOD-EESS-SHARE]     WP 5B     2020-08-25
[ 17 ]  
 
Initial reply liaison statement to Working Party 5D (copied to Working Parties 4A, 4C, 5A, 5B, 5C, 6A, 7B, 7C and 7D for information) - WRC-23 agenda item 1.4     WPs 3J, 3K and 3M   AI1.4   2020-08-27
[ 16 ]  
 
Liaison statement to Working Parties 4A, 4B, 5A, 5C, 7D and 3M - Preparation for WRC-23 agenda item 1.8 - Resolution 155 (Rev.WRC-19)     WP 5B   AI1.8   2020-08-17
[ 15 ]  
 
Reply liaison statement to Working Party 5D (copied for information to Working Parties 4A, 4C, 5A, 5B, 6A, 7B, 7C and 7D) - WRC-23 agenda item 1.4     WP 5C   AI1.4   2020-08-07
[ 14 ]  
 
Reply liaison statement to Working Parties 7C and 7D (copy for information to Working Party 5C) - Working document towards a preliminary draft new Report ITU-R M.[100-GHZ.RSTT.EESS.COEXIST]     WP 5A     2020-08-06
[ 13 ]  
 
Reply liaison statement to Working Party 7B (copy to Working Parties 3M, 5A, 7C and 7D for information) - WRC-23 agenda item 1.13     WP 5C   AI1.13   2020-08-06
[ 12 ]  
 
Liaison statement to Working Party 7C (copy to Working Parties 1A, 3J, 3K, 3M, 5A, 7B and 7D for information) - Technical and operational characteristics and applications of the point-to-point fixed service applications operating in the frequency range 275-450 GHz     WP 5C     2020-08-06
[ 11 ]  
 
Liaison statement to Working Parties 3K, 3M, 4A, 5A, 5C, 7C and 7D - WRC-23 agenda item 1.10 - New allocations to the aeronautical mobile service for the use of non-safety applications     WP 5B   AI1.10   2020-08-06
[ 10 ]  
 
Liaison statement to Working Party 7C (copy for information to Working Parties 1A, 3J, 3K, 3M, 5C, and 7D) - Technical and operational characteristics of land-mobile service applications in the frequency range 275-450 GHz     WP 5A     2020-08-06
[ 9 ]  
 
Liaison statement to Working Party 7B (copied to Working Parties 3M, 5B, 5C, 7C and 7D for information) - Preparations for studies under WRC-23 agenda item 1.13     WP 5A   AI1.13   2020-08-05
[ 8 ]  
 
Liaison statement to Radiocommunication Study Groups and Working Parties (copy for information to ITU-T and ITU-D Study Groups)     Chairman, CCV     2020-07-14
[ 7 ]  
 
Outcome of the sixteenth meeting of the Chairmen and Vice-Chairmen of the Radiocommunication Study Groups, Working Parties and other Subordinate Groups     Director, BR     2020-06-25
[ 6 ]  
 
Liaison statement to Working Parties 3M, 5A, 5C, 7C and 7D requesting characteristics for use in sharing studies under WRC-23 agenda item 1.13 (Working Party 5B for information and action if appropriate)     WP 7B   AI1.13   2020-04-28
[ 5 ]  
 
Contribution to Working Parties 7A, 7B, 7C and 7D on relevant agenda item of WRC-23     Iran (Islamic Republic of)     2020-03-23
[ 4 ]  
 
Liaison statement to Working Parties 1B, 5B, 5C and 7D - ITU-R Preparations for WRC-23 agenda item 1.1     WP 5D   AI1.1   2020-03-06
[ 3 ]  
 
Liaison statement to Working Parties 3K and 3M (for information to Working Parties 1B, 3J, 4A, 4B, 4C, 5A, 5B, 5C, 7B, 7C and 7D - Preparations for WRC-23 agenda items 1.1 and 1.2     WP 5D   AI1.2, AI1.1   2020-03-06
[ 2 ]  
 
Liaison statement to Working Parties 4A, 4C, 5A, 5B, 5C, 6A, 7B, 7C, and 7D - Information for studies on WRC-23 agenda item 1.4     WP 5D   AI1.4   2020-03-06
[ 1 ]  
 
Documents to be carried over from the 2015-2019 study period     WP 7D     2019-10-31
Results:244 total items.
Result page:  Previous -  1 - 2 - 3 - 4 - 5  
Multiple Document Download: Check the boxes of the selected documents, then click "Zip and download"
   
 
User preferences: 
Multiple Document Download: Formats and Languages to be included (when available):
HTML Navigation Pages  
Formats  + Other formats
Languages (maximum 2)  + Multilingual 
(E: English - F: French - S: Spanish - A: Arabic - C: Chinese - R: Russian)

Top -  Feedback -  Contact Us -  Copyright © ITU 2008 All Rights Reserved
Contact for this page :  ITU-R Web coordinator
Updated : 2023-11-12