Contributions |
|
Numéro
|
Titre
|
Source
|
AI/Question
|
Date
|
|
[ 138 ]
|
ODU3ye/OTU3ye supplement supporting only 4 x ODU2e
|
NTT
|
Q11/15
|
2008-11-20 |
|
[ 137 ]
|
Bit rate of OTU3ye in G.supODU3ye
|
NTT
|
Q11/15
|
2008-11-20 |
|
[ 136 ]
|
Proposal for a draft of new ITU-T Recommendation "Non-destructive testing (NDT) for identifying the base condition of telecommunication pole"
|
Republic of Korea
|
Q16/15
|
2008-11-20 |
|
[ 135 ]
|
Proposal for a Revised draft of new ITU-T Recommendation "Monitoring system using wireless sensor network (WSN) for outside plant facilities" L.wsn
|
KT Corporation, Republic of Korea
|
Q16/15
|
2008-11-20 |
|
[ 134 ]
|
Solution of fast GPON switching in long-reach PON scenario
|
Huawei technologies
|
Q2/15
|
2008-11-20 |
|
[ 133 ]
|
Proposal to support phase synchronization in GPON system
|
Huawei technologies Co., LTD
|
Q2/15
|
2008-11-20 |
|
[ 132 ]
|
Proposal to support ONT survival time attribute in G.984.4
|
Huawei technologies Co., LTD
|
Q2/15
|
2008-11-20 |
|
[ 131 ]
|
Proposal on Continuous Mode of LR-PON
|
Huawei Technologies Co., Ltd. RAD Data communication Ltd.
|
Q2/15
|
2008-11-20 |
|
[ 130 ]
|
Proposal on align NNI attributes for Ethernet service between ITU and MEF
|
Alcatel Shanghai Bell
|
Q10/15
|
2008-11-20 |
|
[ 129 ]
|
Proposal for PON splitter specifications in G.671 revision
|
NTT
|
Q7/15, Q2/15
|
2008-11-20 |
|
[ 128 ]
|
G.ADSL2, G.ADSL2+, G.HS, G.VDSL2: Short CL, Short CLR behavior issue in multimode modems supported ADSL2x and VDSL2
|
Infineon Technologies AG
|
Q4/15
|
2008-11-20 |
|
[ 127 ]
|
Ethernet Ring Topology Proposal
|
ADTRAN
|
Q9/15, Q14/15, Q12/15
|
2008-11-20 |
|
[ 126 ]
|
Proposed modification for the interoperability of ETH-LT in Y.1731
|
Fujitsu
|
Q9/15, Q10/15
|
2008-11-20 |
|
[ 125 ]
|
Proposed re-structure G.sup43 for 4xODU2e/ODU3y
|
Fujitsu
|
Q11/15
|
2008-11-20 |
|
[ 124 ]
|
Proposed work plan and comments on G.709v2 draft
|
Fujitsu
|
Q11/15
|
2008-11-20 |
|
[ 123 ]
|
Consideration on interoperability of OTN and proposed multiplexing and mapping structure for G.709
|
Fujitsu
|
Q11/15
|
2008-11-20 |
|
[ 122 ]
|
Documentation of H-ODU3y and H-ODU2e in a Supplement
|
Deutsche Telekom
|
Q11/15
|
2008-11-20 |
|
[ 121 ]
|
H-ODU4 structure and ODUk VCAT versus flexible L-ODUs
|
Deutsche Telekom
|
Q11/15
|
2008-11-20 |
|
[ 120 ]
|
Illustration of the multiplex hierarchy in Recommendation G.709
|
Deutsche Telekom
|
Q11/15
|
2008-11-20 |
|
[ 119 ]
|
Proposal to withdraw G.ptnni
|
Deutsche Telekom
|
Q10/15
|
2008-11-20 |
|
[ 118 ]
|
Proposed standardisation plan for G.709 extensions
|
Deutsche Telekom
|
Q11/15
|
2008-11-20 |
|
[ 117 ]
|
Proposed new Recommendation for Ethernet CBR over OTN
|
Deutsche Telekom
|
Q11/15
|
2008-11-20 |
|
[ 116 ]
|
Enhanced OTN Mapping
|
Cortina Systems, Ciena Corporation, Cisco Systems
|
Q11/15
|
2008-11-20 |
|
[ 115 ]
|
IPR: Potentially Essential Patents Notification for ITU-T G.hn
|
France Telecom
|
Q4/15
|
2008-11-20 |
|
[ 114 ]
|
Reconsideration of topology restrictions on G.8032v2
|
NEC Corporation and Fujitsu
|
Q9/15
|
2008-11-20 |
|
[ 113 ]
|
G.ploam: Improvement of xTU-R Inventory Information
|
Swisscom
|
Q4/15
|
2008-11-20 |
|
[ 112 ]
|
Structure for Evolution of G.709
|
United States
|
Q11/15
|
2008-11-20 |
|
[ 111 ]
|
Support for the consent of draft Recommendation G.hn
|
Norway
|
Q4/15
|
2008-11-20 |
|
[ 110 ]
|
Standardization of G.709 Bit Rate Compliant Transparent Transport of 10GBase-R Clients in G.7041 and G.709
|
AT&T, Lucent, Ciena, PMC-Sierra
|
Q11/15
|
2008-11-20 |
|
[ 109 ]
|
G.INP: Working text for PMS-TC ARQ for VDSL2
|
Broadcom, Ericsson, Pirelli Broadband Solutions, Thomson
|
Q4/15
|
2008-11-20 |
|
[ 108 ]
|
G.INP: Working text for PMS-TC ARQ for ADSL2
|
Broadcom, Ericsson, Pirelli Broadband Solutions, Thomson
|
Q4/15
|
2008-11-20 |
|
[ 107 ]
|
Proposals to extend G.709
|
Huawei Technologies Co., Ltd.
|
Q11/15
|
2008-11-20 |
|
[ 106 ]
|
G.INP: Comments on management of retransmission
|
Broadcom
|
Q4/15
|
2008-11-20 |
|
[ 105 ]
|
G.8021 Appendix II Correction
|
AT&T
|
Q9/15
|
2008-11-20 |
|
[ 104 ]
|
Proposal for a frequency only end-to-end 1588V2 telecom profile
|
Alcatel-Lucent
|
Q13/15
|
2008-11-20 |
|
[ 103 ]
|
Correction to OPUk-16v frame structure in G.709
|
Korea (Republic of)
|
Q11/15
|
2008-11-20 |
|
[ 102 ]
|
Comments on G.8032 Version 2 - Ethernet ring protection switching
|
Korea (Republic of)
|
Q9/15
|
2008-11-20 |
|
[ 101 ]
|
PEC Network Limits and packet based clock characteristics (G.8261 and G.8263)
|
Ericsson
|
Q13/15
|
2008-11-20 |
|
[ 100 ]
|
Proposals for G.pactiming-bis
|
Ericsson
|
Q13/15
|
2008-11-20 |
|
[ 99 ]
|
PNT-F and CES-IWF integrated in the end equipment
|
Ericsson
|
Q13/15
|
2008-11-20 |
|
[ 98 ]
|
Reference Points where network requirements apply; Frequency Synchronization case
|
Ericsson
|
Q13/15
|
2008-11-20 |
|
[ 97 ]
|
General aspects on the protocols for packet based methods in G.8264
|
Ericsson
|
Q13/15
|
2008-11-20 |
|
[ 96 ]
|
Details on the use of NTP for frequency distribution in G.8264
|
Ericsson
|
Q13/15
|
2008-11-20 |
|
[ 95 ]
|
OPUk GMP proposal
|
Huawei Technologies Co., Ltd.
|
Q11/15
|
2008-11-20 |
|
[ 94 ]
|
G.8032 Efficient Flushing Mechanism
|
Tejas Networks Ltd
|
Q9/15
|
2008-11-20 |
|
[ 93 ]
|
G.8032 Dual Node Interconnect
|
Tejas Networks Ltd
|
Q9/15
|
2008-11-20 |
|
[ 92 ]
|
Proposal to develop Use Cases for IEEE1588v2 (PTP) Frequency Distribution applications
|
LSI Corporation, Nokia Siemens Networks, Huawei Technologies
|
Q13/15
|
2008-11-19 |
|
[ 91 ]
|
G.vector: Quantification of normalized error samples
|
Broadcom
|
Q4/15
|
2008-11-19 |
|
[ 90 ]
|
G.vector: Further specification of the vectoring back-channel
|
Broadcom
|
Q4/15
|
2008-11-19 |
|
[ 89 ]
|
Proposal for the Revision of G.697
|
Italy
|
Q6/15
|
2008-11-19 |
Resultats:338 documents Résultats :
Précédent -
1 -
2 -
3 -
4 -
5 -
6 -
7
- Suivant
|
Téléchargement de multiples documents: Formats et langues à prendre en compte (si disponibles):