Contributions |
|
Numéro
|
Titre
|
Source
|
AI/Question
|
Date
|
|
[ 1738 ]
(Rev.1) |
On-grid frequencies up & down proposal in Decision 2 of Decision Tree
|
Gemfire Europe Limited
,
Huawei Technologies Co. Ltd.
|
Q6/15
|
2011-11-22 |
|
[ 1737 ]
(Rev.1) |
Gigabit-capable Passive Optical Networks (G PON): Reach Extension; Contribution to Amendment 2: Raman amplified G-PON extender
|
British Telecommunications Public Ltd. Co. (BT Plc)
,
OFS Fitel, LLC
|
Q2/15
|
2011-11-21 |
|
[ 1736 ]
(Rev.1) |
USA on Continued Work to Progress a Solution on G.8113.1
|
United States
|
Q10/15
|
2011-11-21 |
|
[ 1735 ]
(Rev.1) |
Internet Engineering Steering Group (IESG) Liaison Statement: Email Correspondence Between IETF Chair and TSB Director
|
Internet Society
|
|
2011-11-21 |
|
[ 1734 ]
|
Status of Jitter/Wander Requirements and Performance for the Transport of SDI Video Clients over OTN
|
Huawei Technologies Co. Ltd.
|
Q13/15
|
2011-11-21 |
|
[ 1733 ]
|
Rise time requirements of RS422 1PPS_OUT signal
|
Huawei Technologies Co. Ltd.
|
Q13/15
|
2011-11-21 |
|
[ 1732 ]
(Rev.1) |
Policy principles for cooperative standards development
|
Internet Society
|
|
2011-11-21 |
|
[ 1731 ]
|
Jitter/Wander Testing Related to Transport of PTPv2 Messages over OTN
|
Huawei Technologies Co. Ltd.
|
|
2011-11-21 |
|
[ 1730 ]
|
Maximum FFO of the Output of a Second-Order PLL due to a Sinusoidal and Triangular Wave Input
|
France Télécom Orange
,
France Télécom Orange
,
Huawei Technologies Co. Ltd.
,
Iometrix, Inc.
|
Q13/15
|
2011-11-21 |
|
[ 1729 ]
|
Initial Simulation Results for Transport of Time over the HRM2b chain of Boundary Clocks
|
France Télécom Orange
,
France Télécom Orange
,
Huawei Technologies Co. Ltd.
,
Iometrix, Inc.
|
Q13/15
|
2011-11-21 |
|
[ 1728 ]
|
Detection and removal of Delay Jumps using FWPR and minMATIE
|
Huawei Technologies Co. Ltd.
|
Q13/15
|
2011-11-21 |
|
[ 1727 ]
|
ESCON, Infiniband, and DVB_ASI Jitter Accumulation over OTN Islands
|
Huawei Technologies Co. Ltd.
|
Q13/15, Q11/15
|
2011-11-21 |
|
[ 1726 ]
|
Criterion for Minimum Detectable Floor Delay Step using minMATIE
|
Huawei Technologies Co. Ltd.
|
Q13/15
|
2011-11-21 |
|
[ 1725 ]
|
Initial Simulation Results for Transport of Time over the HRM3 chain of Boundary Clocks, with SyncE Reference Chain Rearrangements
|
France Télécom Orange
,
France Télécom Orange
,
Huawei Technologies Co.
,
Iometrix, Inc.
|
Q13/15
|
2011-11-21 |
|
[ 1724 ]
(Rev.1) |
Comments on TD 527
|
Cisco Systems, Inc.
,
France Télécom Orange
,
Juniper Networks
,
Nokia Siemens Networks GmbH & Co. KG
|
QALL/15, Q10/15, Q1/15
|
2011-11-21 |
|
[ 1723 ]
(Rev.1) |
Request for evaluation of OTN support for CPRI
|
AT&T, Inc.
|
Q13/15
|
2011-11-21 |
|
[ 1722 ]
(Rev.1) |
G.798 PT Interworking Smart?
|
AT&T, Inc.
|
Q9/15
|
2011-11-21 |
|
[ 1721 ]
|
Request for clarification on the February closing Plenary of ITU-T SG 15
|
Germany
|
QALL/15
|
2011-11-21 |
|
[ 1720 ]
|
Germany's observations regarding IETF RFCs in the ITU-T
|
Germany
|
QALL/15
|
2011-11-21 |
|
[ 1719 ]
|
Maintaining the functional model of the OTN in G.872
|
Germany
|
Q12/15
|
2011-11-21 |
|
[ 1718 ]
(Rev.1) |
Comments on the draft text of revised L.64
|
Nippon Telegraph and Telephone Corporation (NTT)
|
Q17/15
|
2011-11-21 |
|
[ 1717 ]
(Rev.1) |
Progressing MPLS-TP OAM, Equipment, and Management Recommendations
|
Alcatel-Lucent USA Inc.
|
Q9/15, Q12/15, Q10/15
|
2011-11-21 |
|
[ 1716 ]
(Rev.1) |
SMP Protocol Functionality
|
Nokia Siemens Networks GmbH & Co. KG
|
Q9/15
|
2011-11-21 |
|
[ 1715 ]
(Rev.1) |
Proposed study plan of Question 17/15 for next study period
|
Nippon Telegraph and Telephone Corporation (NTT)
|
Q17/15
|
2011-11-21 |
|
[ 1714 ]
(Rev.1) |
Development of G.SMP
|
Nokia Siemens Networks GmbH & Co. KG
|
Q9/15
|
2011-11-21 |
|
[ 1713 ]
|
Withdrawn - Duplicate of C-1709
Withdrawn
|
Cisco Systems, Inc.
,
Juniper Networks
,
Verizon Communication Corporation
|
|
2011-11-21 |
|
[ 1712 ]
(Rev.1) |
G.8131 Single Document
|
Cisco Systems, Inc.
,
Ericsson, Inc.
,
Juniper Networks
,
Nokia Siemens Networks GmbH & Co. KG
,
Verizon Communication Corporation
|
Q9/15
|
2011-11-21 |
|
[ 1711 ]
(Rev.1) |
G.8113.2 comments
|
Cisco Systems, Inc.
,
Juniper Networks
,
Nokia Siemens Networks GmbH & Co. KG
,
Verizon Communication Corporation
|
QALL/15, Q10/15
|
2011-11-21 |
|
[ 1710 ]
(Rev.1) |
Proposed changes to G.8113.1
|
Cisco Systems, Inc.
,
Juniper Networks
,
Nokia Siemens Networks GmbH & Co. KG
,
Verizon Communication Corporation
|
Q10/15
|
2011-11-21 |
|
[ 1709 ]
(Rev.1) |
Updated text for G.8131/Y.1382
|
Cisco Systems, Inc.
,
Ericsson, Inc.
,
Juniper Networks
,
Nokia Siemens Networks GmbH & Co. KG
,
Verizon Communication Corporation
|
Q9/15
|
2011-11-21 |
|
[ 1708 ]
(Rev.1) |
Security with Timing as a Managed Service
|
SymmetriCom, Inc.
|
Q13/15
|
2011-11-21 |
|
[ 1707 ]
(Rev.1) |
Considerations on Packet Rate for the PEC-S-F
|
SymmetriCom, Inc.
|
Q13/15
|
2011-11-21 |
|
[ 1706 ]
(Rev.1) |
Lack of consensus on G.8113.1
|
Cisco Systems, Inc.
,
France Télécom Orange
,
Nokia Siemens Networks GmbH & Co. KG
,
Verizon Communication Corporation
|
QALL/15, Q10/15, Q1/15
|
2011-11-21 |
|
[ 1705 ]
|
Enhanced delay measurement for OTN
|
Korea (Rep. of)
|
Q11/15
|
2011-11-21 |
|
[ 1704 ]
|
Considerations for G.8031 corrigendum
|
Korea (Rep. of)
|
Q9/15
|
2011-11-21 |
|
[ 1703 ]
(Rev.1) |
PEC-S-F Output Timing Signals
|
SymmetriCom, Inc.
|
Q13/15
|
2011-11-21 |
|
[ 1702 ]
(Rev.1) |
Noise Tolerance for the Packet Slave Clock (PEC-S-F)
|
SymmetriCom, Inc.
|
Q13/15
|
2011-11-21 |
|
[ 1701 ]
|
Synchronization Requirement in OTN
|
China Mobile Communications Corporation
|
Q13/15, Q11/15
|
2011-11-21 |
|
[ 1700 ]
(Rev.1) |
Noise Generation for the Packet Slave Clock (PEC-S-F)
|
SymmetriCom, Inc.
|
Q13/15
|
2011-11-21 |
|
[ 1699 ]
|
The OAM structure and functions requirements for Packet-based synchronization network
|
China Mobile Communications Corporation
|
Q13/15
|
2011-11-21 |
|
[ 1698 ]
(Rev.1) |
Propose to consent G.8113.1 OAM for large scale application in China Mobile
|
China Mobile Communications Corporation
|
Q10/15
|
2011-11-21 |
|
[ 1697 ]
(Rev.1) |
G.vdsl: Proposed Event Types to Store in the Trace Buffer for Diagnosis of Retrains and Failed Inits
|
Adaptive Spectrum and Signal Alignment (ASSIA) Inc.
,
AT&T, Inc.
,
France Télécom Orange
,
Telecom Italia S.p.A.
|
Q4/15
|
2011-11-21 |
|
[ 1696 ]
(Rev.1) |
Testing of Packet Slave Clocks
|
SymmetriCom, Inc.
|
Q13/15
|
2011-11-21 |
|
[ 1695 ]
(Rev.1) |
Measuring PRTC Accuracy
|
SymmetriCom, Inc.
|
Q13/15
|
2011-11-21 |
|
[ 1694 ]
|
Withdrawn, duplicate of C-1843 - G.8113.1 MPLS-TP OAM and G.8131.1 APS interoperability test activities and results
Withdrawn
|
China
,
China Mobile Communications Corporation
|
Q9/15, Q14/15, Q12/15, Q10/15
|
2011-11-21 |
|
[ 1693 ]
(Rev.1) |
Cesium Clock Wander Contribution to Grandmaster Clock Characterization
|
SymmetriCom, Inc.
|
Q13/15
|
2011-11-21 |
|
[ 1692 ]
(Rev.1) |
Inconsistencies in G.829 following corrigendum 2007
|
Nokia Siemens Networks GmbH & Co. KG
|
Q9/15
|
2011-11-21 |
|
[ 1691 ]
(Rev.1-2) |
Testing Packet Slave Clocks using Flicker Noise
|
SymmetriCom, Inc.
|
Q13/15
|
2011-11-21 |
|
[ 1690 ]
(Rev.1) |
Proposal to study the convergence of PON and transport network in the next study period
|
ZTE Corporation
|
Q2/15, Q14/15, Q13/15, Q12/15, Q11/15, Q10/15, Q1/15
|
2011-11-21 |
|
[ 1689 ]
(Rev.1) |
Proposal to study the convergence of optical and packet in the next study period
|
ZTE Corporation
|
Q9/15, Q3/15, Q14/15, Q13/15, Q12/15, Q11/15, Q10/15
|
2011-11-21 |
Resultats:420 documents Résultats :
Précédent -
1 -
2 -
3 -
4 -
5 -
6 -
7 -
8 -
9
- Suivant
|
Téléchargement de multiples documents: Formats et langues à prendre en compte (si disponibles):