Contributions |
|
Numéro
|
Titre
|
Source
|
AI/Question
|
Date
|
|
[ 240 ]
|
Explanation of Time Selector Block in G.8273.2 Functional Model
|
China Mobile Communications Corporation
,
Huawei Technologies Co. Ltd.
|
Q13/15
|
2013-06-17 |
|
[ 239 ]
|
Network limit and HRM hops of G.8271.1
|
China Mobile Communications Corporation
,
Huawei Technologies Co. Ltd.
|
Q13/15
|
2013-06-17 |
|
[ 238 ]
|
HRM2 SyncE transients of G.8271.1
|
China Mobile Communications Corporation
,
Huawei Technologies Co. Ltd.
|
Q13/15
|
2013-06-17 |
|
[ 237 ]
|
Clock Classes for G.8275.1 and T-BC/T-TSC Models
|
Huawei Technologies Co. Ltd.
|
Q13/15
|
2013-06-17 |
|
[ 236 ]
|
Proposed text in G.MDSP
|
China Unicom
,
Huawei Technologies Co. Ltd.
|
Q9/15
|
2013-06-17 |
|
[ 235 ]
|
APS Behavior in 1-stage ODU SMP Proposal
|
Huawei Technologies Co. Ltd.
,
Infinera Corporation
|
Q9/15
|
2013-06-17 |
|
[ 234 ]
|
Discussion about Single Failure and its Potential Affect in ODU SMP
|
Huawei Technologies Co. Ltd.
,
Infinera Corporation
|
Q9/15
|
2013-06-17 |
|
[ 233 ]
|
Proposed description for the alternative OSNR measurement method in G.697
|
Huawei Technologies Co. Ltd.
|
Q6/15
|
2013-06-17 |
|
[ 232 ]
|
Proposal on adding bandwidth degradation message in Y.1731
|
Huawei Technologies Co. Ltd.
|
Q10/15
|
2013-06-17 |
|
[ 231 ]
|
Measurement results of spectral excursion for 100G applications in G.698.2
|
Huawei Technologies Co. Ltd.
|
Q6/15
|
2013-06-17 |
|
[ 230 ]
|
Consideration on the service protection of an MD-ROADM in G.672
|
Huawei Technologies Co. Ltd.
|
Q7/15
|
2013-06-17 |
|
[ 229 ]
|
Analysis of Supporting External Commands in ODU SMP
|
Huawei Technologies Co. Ltd.
|
Q9/15
|
2013-06-17 |
|
[ 228 ]
|
Extension of OTN hybrid equipment
|
China Mobile Communications Corporation
,
China Unicom
,
Huawei Technologies Co. Ltd.
|
Q11/15
|
2013-06-17 |
|
[ 227 ]
|
Enhancements of OTN hybrid equipment
|
China Mobile Communications Corporation
,
China Telecommunications Corporation
,
Huawei Technologies Co. Ltd.
|
Q11/15, Q10/15
|
2013-06-17 |
|
[ 226 ]
|
Multilayer protocol stack of OTN interface
|
China Mobile Communications Corporation
,
Huawei Technologies Co. Ltd.
|
Q11/15
|
2013-06-17 |
|
[ 225 ]
|
Comparison of OTU4Cn vs OTUCn
|
China Mobile Communications Corporation
,
Huawei Technologies Co. Ltd.
|
Q11/15
|
2013-06-17 |
|
[ 224 ]
|
Beyond 100G use case and design considerations
|
China Mobile Communications Corporation
,
Huawei Technologies Co. Ltd.
|
Q11/15
|
2013-06-17 |
|
[ 223 ]
|
Answers to B100G questions from Q11/15 rapporteur (TD22/GEN)
|
China Mobile Communications Corporation
,
Huawei Technologies Co. Ltd.
|
Q9/15, Q6/15, Q14/15, Q12/15, Q11/15
|
2013-06-17 |
|
[ 222 ]
|
Multi-carrier OCh signal and connection behaviour under optical layer faults
|
China Mobile Communications Corporation
,
Huawei Technologies Co. Ltd.
|
Q11/15
|
2013-06-17 |
|
[ 221 ]
|
Improving Power Saving Efficiency
|
China Telecommunications Corporation
,
Sigma Designs Israel S.D.I Ltd.
,
ZTE Corporation
|
Q18/15
|
2013-06-17 |
|
[ 220 ]
|
OTM-1 multi vendor IaDI management capability requirements
|
Huawei Technologies Co. Ltd.
|
Q11/15
|
2013-06-17 |
|
[ 219 ]
|
Proposal to add a description of a multi-carrier OCh for the transport of an OTUk
|
Huawei Technologies Co. Ltd.
|
Q14/15, Q11/15
|
2013-06-17 |
|
[ 218 ]
|
The APS command exercise is not optional
|
Huawei Technologies Co. Ltd.
|
Q3/15
|
2013-06-17 |
|
[ 217 ]
|
Use of BIP monitors behind a HD or SD FEC process
|
Huawei Technologies Co. Ltd.
|
Q11/15
|
2013-06-17 |
|
[ 216 ]
|
Block diagram example of n x OTU4 and OTUCn framer
|
Huawei Technologies Co. Ltd.
|
Q11/15
|
2013-06-17 |
|
[ 215 ]
|
Beyond 100G tributary slot structure considerations
|
Huawei Technologies Co. Ltd.
|
Q11/15
|
2013-06-17 |
|
[ 214 ]
|
Proposal to add HAO capable ODUflex to MPLS-TP adaptation function
|
Huawei Technologies Co. Ltd.
|
Q11/15, Q10/15
|
2013-06-17 |
|
[ 213 ]
|
Status update for ODU SMP
|
ZTE Corporation
|
Q9/15
|
2013-06-17 |
|
[ 212 ]
|
The Coordination and Transformation of Time and Frequency Information of G.8273.2 T-BC Network Element
|
China Unicom
|
Q13/15
|
2013-06-17 |
|
[ 211 ]
|
Relationship between networks PDV cumulative thresholds and 1pps performance in ITU-T Rec. G.8271.1
|
China Unicom
|
Q13/15
|
2013-06-17 |
|
[ 210 ]
|
Propose about messaging behaviour of boundary clock in Multicast/Unicast network
|
China Unicom
|
Q13/15
|
2013-06-17 |
|
[ 209 ]
|
Further clarification about application scenarios of new Metro DWDM
|
China Unicom
,
China Telecom
,
Ericsson
,
Fiberhome
,
Nokia Siemens Networks
|
Q6/15
|
2013-06-17 |
|
[ 208 ]
|
Consideration on optical layer protection
|
China Unicom
,
Fiberhome
,
Nokia Siemens Networks
|
Q9/15
|
2013-06-17 |
|
[ 207 ]
|
Proposal to add time related EVM parameters in G.698.2
|
China Unicom
,
Fiberhome
|
Q6/15
|
2013-06-17 |
|
[ 206 ]
|
Proposal for adding skew parameters for 100Gbit/s DP-QPSK modulation format in G.698.2
|
China Unicom
,
Calnex
|
Q6/15
|
2013-06-17 |
|
[ 205 ]
|
Architecture and APS communication for per-leaf protection in MECP
|
Korea (Rep. of)
|
Q9/15
|
2013-06-17 |
|
[ 204 ]
|
Proposal to modify clause 7.1.2 for an Amendment to G.8113.1
|
Korea (Rep. of)
|
Q10/15
|
2013-06-17 |
|
[ 203 ]
|
Proposal to start a new recommendation G.cwdm-msch (Multichannel CWDM applications with multi sub-channel optical interfaces)
|
Korea (Rep. of)
|
Q6/15
|
2013-06-17 |
|
[ 202 ]
|
MECP per-tree protection - root node initiated protection
|
Korea (Rep. of)
|
Q9/15
|
2013-06-17 |
|
[ 201 ]
|
Proposal for a study item of automatic discovery for multi-layer/multi-technology converged transport networks and SDN
|
Korea (Rep. of)
|
Q12/15
|
2013-06-17 |
|
[ 200 ]
|
Prysmian Group proposals for revision of Recommendation G.652
|
Prysmian SpA
|
Q5/15
|
2013-06-17 |
|
[ 199 ]
(Rev.1) |
G.fast: Initialization
|
Broadcom Corporation
,
Futurewei Technologies US R&D Center
|
Q4/15
|
2013-06-17 |
|
[ 198 ]
|
G.hs,G.fast::Additional carrier sets for G.fast
|
ZTE Corporation
|
Q4/15
|
2013-06-17 |
|
[ 197 ]
(Rev.1) |
G.fast: Fast OLR proposal.
|
Broadcom Corporation
|
Q4/15
|
2013-06-17 |
|
[ 196 ]
(Rev.1) |
G.fast:. Improved On Line Reconfiguration for precoder update
|
Broadcom Corporation
|
Q4/15
|
2013-06-17 |
|
[ 195 ]
(Rev.1) |
G.fast: RMC framing and impact on OLR.
|
Broadcom Corporation
|
Q4/15
|
2013-06-17 |
|
[ 194 ]
(Rev.1) |
G.vdsl: Low power mode.
|
Broadcom Corporation
|
Q4/15
|
2013-06-17 |
|
[ 193 ]
|
Working document towards a draft Supplement on Radio-over-Fiber (RoF) technologies and their applications
|
National Institute of Information and Communications Technology
|
Q2/15
|
2013-06-17 |
|
[ 192 ]
|
L.oxcon "outdoor optical cross connect cabinet
|
Ministry of Industry and Information Technology (MIIT)
|
Q16/15
|
2013-06-17 |
|
[ 191 ]
|
More information about "Field Mountable optical fibre Connector"
|
Ministry of Industry and Information Technology (MIIT)
|
Q7/15
|
2013-06-17 |
Resultats:440 documents Résultats :
Précédent -
1 -
2 -
3 -
4 -
5 -
6 -
7 -
8 -
9
- Suivant
|
Téléchargement de multiples documents: Formats et langues à prendre en compte (si disponibles):