Contributions |
|
Numéro
|
Titre
|
Source
|
AI/Question
|
Date
|
|
[ 599 ]
|
G.vdsl, G.ploam: Proposal for SNRM per latency path
|
Infineon
|
Q4/15
|
2007-05-25 |
|
[ 598 ]
|
G.hn: On the FEC structure in G.hn
|
Infineon
|
Q4/15
|
2007-05-25 |
|
[ 597 ]
|
Proposal for T-MPLS TCS (Traffic Conditioning and Shaping) in G.8110.1
|
Alcatel-Lucent
|
Q12/15
|
2007-05-25 |
|
[ 596 ]
|
Support of PDH over T-MPLS (PW adaptation)
|
Alcatel-Lucent
|
Q13/15, Q12/15, Q11/15, Q9/15
|
2007-05-25 |
|
[ 595 ]
|
IP/MPLS and T-MPLS Interoperability
|
Alcatel-Lucent
|
Q14/15, Q12/15
|
2007-05-25 |
|
[ 594 ]
|
Support of ATM over T-MPLS (PW adaptation)
|
Alcatel-Lucent
|
Q12/15, Q11/15, Q9/15
|
2007-05-25 |
|
[ 593 ]
|
Proposals for Current Draft of G.ufatn and Future Work
|
BT
|
Q12/15
|
2007-05-25 |
|
[ 592 ]
|
MCC and SCC Options for T-MPLS
|
Alcatel-Lucent
|
Q12/15, Q14/15
|
2007-05-25 |
|
[ 591 ]
|
Proposal how to eliminate the SCC/MCC PDU length limitation in G.8114
|
Alcatel-Lucent
|
Q12/15, Q14/15
|
2007-05-25 |
|
[ 590 ]
|
Proposal for an Amendment 1 to G.8112
|
Alcatel-Lucent
|
Q11/15
|
2007-05-25 |
|
[ 589 ]
|
Textual proposal for APS protocol description G.8132
|
Alcatel-Lucent
|
Q9/15
|
2007-05-25 |
|
[ 588 ]
|
G.VDSL2, G.ADSL: Spreading of uncorrectable errors by the Reed-Solomon Interleaver
|
Infineon
|
Q4/15
|
2007-05-25 |
|
[ 587 ]
|
G.VDSL2, G.ADSL: A proposal for a new data-continuous interleaver
|
Infineon
|
Q4/15
|
2007-05-25 |
|
[ 586 ]
|
(NRZ-)DQPSK as a suitable modulation format for 100+ Gb/s serial transport
|
Alcatel-Lucent Germany
|
Q6/15
|
2007-05-25 |
|
[ 585 ]
|
Comments on draft new Amendment 2 to G.7041
|
Alcatel-Lucent
|
Q14/15, Q11/15, Q9/15
|
2007-05-25 |
|
[ 584 ]
|
Inconsistencies in G.8021v2
|
ITEK
|
Q9/15
|
2007-05-25 |
|
[ 583 ]
|
Computing cost of managed FDB APS scheme in ERP
|
ETRI
|
Q9/15
|
2007-05-25 |
|
[ 582 ]
|
Synchronization inputs in G.paclock
|
Semtech
|
Q13/15
|
2007-05-25 |
|
[ 581 ]
|
Scope of G.paclock
|
Semtech
|
Q13/15
|
2007-05-25 |
|
[ 580 ]
|
Wording for "Scope" in G.paclock
|
Semtech
|
Q13/15
|
2007-05-25 |
|
[ 579 ]
|
Proposal to keep SSM transport based upon IEEE802.3ah as an option
|
Tellabs Oy
|
Q13/15
|
2007-05-25 |
|
[ 578 ]
|
Addition of "Through Clock" for Synchronous Ethernet
|
Tellabs Oy
|
Q13/15
|
2007-05-25 |
|
[ 577 ]
|
Two-Way Protocols Test Cases in Appendix VI/G.8261
|
IL-MOC
|
Q13/15
|
2007-05-27 |
|
[ 576 ]
|
A New Appendix for Background Traffic Models Generation Examples
|
IL-MOC
|
Q13/15
|
2007-05-27 |
|
[ 575 ]
|
Modification for Test Case 7 of G.8261
|
IL-MOC
|
Q13/15
|
2007-05-27 |
|
[ 574 ]
|
Information on alternative modulation formats for revision of sup.39
|
Alcatel-Lucent
|
Q6/15
|
2007-05-25 |
|
[ 573 ]
|
Proposal for 43Gb/s application at G.dapp2 considering PSBT (ODB) modulation format for 100GHz and for 50 GHz channel spacing.
|
Alcatel-Lucent
|
Q6/15
|
2007-05-25 |
|
[ 572 ]
|
Proposal for revision of G.671 to extend the wavelength range of chromatic dispersion compensating components
|
Alcatel-Lucent
|
Q7/15
|
2007-05-25 |
|
[ 571 ]
|
G.paclock document structure
|
Zarlink
|
Q13/15
|
2007-05-25 |
|
[ 570 ]
|
G.paclock - editorial/clarifications
|
Zarlink
|
Q13/15
|
2007-05-25 |
|
[ 569 ]
|
G.paclock - Clause 5.7.4.1 - Phase discontinuity for EEC-Option 1
|
Zarlink
|
Q13/15
|
2007-05-25 |
|
[ 568 ]
|
G.paclock - Clause 5.7.3 - Phase response to input signal interruptions
|
Zarlink
|
Q13/15
|
2007-05-25 |
|
[ 567 ]
|
G.paclock - Figure 14
|
Zarlink
|
Q13/15
|
2007-05-25 |
|
[ 566 ]
|
Synchronous Ethernet - jitter requirements
|
Zarlink
|
Q13/15
|
2007-05-25 |
|
[ 565 ]
|
G.paclock - Clause 5.4.3 Jitter
|
Zarlink
|
Q13/15
|
2007-05-25 |
|
[ 564 ]
|
G.paclock - Clause 5.5.2 Jitter Tolerance
|
Zarlink
|
Q13/15
|
2007-05-25 |
|
[ 563 ]
|
Line timing in Synchronous Ethernet
|
Zarlink
|
Q13/15
|
2007-05-25 |
|
[ 562 ]
|
G.7713, SP34 - interlayer description
|
Nortel Networks (Canada)
|
Q14/15
|
2007-05-25 |
|
[ 561 ]
|
ASON Call Routing
|
Nortel Networks (Canada)
|
Q14/15, Q12/15
|
2007-05-25 |
|
[ 560 ]
|
Link Aggregation
|
Nortel Networks (Canada)
|
Q9/15
|
2007-05-25 |
|
[ 559 ]
|
RPR for G.8021
|
Nortel Networks (Canada)
|
Q9/15
|
2007-05-25 |
|
[ 558 ]
|
G.8261 Appendix IX Use Cases Transport Requirements
|
Nortel Networks (Canada)
|
Q13/15
|
2007-05-25 |
|
[ 557 ]
|
G.8261 Appendix IX clarifications
|
Nortel Networks (Canada)
|
Q13/15
|
2007-05-25 |
|
[ 556 ]
|
ERP Interactions with Layer 2 Network Control Protocols
|
Nortel Networks (Canada)
|
Q9/15
|
2007-05-25 |
|
[ 555 ]
|
Ethernet - Shared Protection Ring (E-SPRing)
|
Nortel Networks (Canada)
|
Q9/15
|
2007-05-25 |
|
[ 554 ]
|
E-SPRing Handling of Multiple Failures
|
Nortel Networks (Canada)
|
Q9/15
|
2007-05-25 |
|
[ 553 ]
|
E-SPRing Failure Propagation
|
Nortel Networks (Canada)
|
Q9/15
|
2007-05-25 |
|
[ 552 ]
|
Specification of point to multipoint in G.8121 amendment 1
|
Nortel Networks (Canada)
|
Q9/15
|
2007-05-25 |
|
[ 551 ]
|
Updates to G.8080 LRM and TAP components to support packet switching
|
Nortel Networks (Canada)
|
Q12/15
|
2007-05-25 |
|
[ 550 ]
|
Ethernet services
|
Nortel Networks (Canada)
|
Q9/15, Q11/15
|
2007-05-25 |
Resultats:332 documents Résultats :
-
1 -
2 -
3 -
4 -
5 -
6 -
7
- Suivant
|
Téléchargement de multiples documents: Formats et langues à prendre en compte (si disponibles):