Contributions |
|
Numéro
|
Titre
|
Source
|
AI/Question
|
Date
|
|
[ 2188 ]
|
100G interoperability measurements up to 1600 km as in input to G.698.2
|
Deutsche Telekom AG
|
Q6/15
|
2016-09-06 |
|
[ 2187 ]
|
G.8273.2: Limits to use when cascading Boundary Clocks
|
Calnex Solutions Limited
|
Q13/15
|
2016-09-06 |
|
[ 2186 ]
|
xPON Access HRMs and Performance for LTE and CA Applications
|
British Telecommunications Public Ltd. Co. (BT Plc)
|
Q2/15, Q13/15
|
2016-09-06 |
|
[ 2185 ]
|
GPON Time Error Transfer performance for a loaded Access System
|
British Telecommunications Public Ltd. Co. (BT Plc)
|
Q13/15
|
2016-09-06 |
|
[ 2184 ]
|
GPON Time Error increase when adding more ONUs
|
British Telecommunications Public Ltd. Co. (BT Plc)
|
Q13/15
|
2016-09-06 |
|
[ 2183 ]
|
G.9903 to consent
|
ERDF
|
Q15/15
|
2016-09-06 |
|
[ 2182 ]
|
VDSL: Long Reach VDSL2
|
British Telecommunications Public Ltd. Co. (BT Plc)
|
Q4/15
|
2016-09-06 |
|
[ 2181 ]
|
Practical Access Model of T-BC from Protocol View Update [G.8271, G.8273.2]
|
Microsemi Corporation
|
Q13/15
|
2016-09-06 |
|
[ 2180 ]
|
Practical Access Model of T-BC from Performance View Update [G.8271, G.8273.2]
|
Microsemi Corporation
|
Q13/15
|
2016-09-06 |
|
[ 2179 ]
|
Various correction to G.9903
|
ERDF
|
Q15/15
|
2016-09-06 |
|
[ 2178 ]
|
Generic Virtual PTP Port Updates [G.8275]
|
Microsemi Corporation
|
Q13/15
|
2016-09-06 |
|
[ 2177 ]
|
Cross-Profile Generic IWF Updates [G.8275]
|
Microsemi Corporation
|
Q13/15
|
2016-09-06 |
|
[ 2176 ]
|
Updates to Appendix III Monitoring Figures [G.8275.2]
|
Microsemi Corporation
|
Q13/15
|
2016-09-06 |
|
[ 2175 ]
|
Use of G.8275.2 with Full On-Path Networks [G.8275.2]
|
Microsemi Corporation
|
Q13/15
|
2016-09-06 |
|
[ 2174 ]
|
Various corrections to G.9901
|
ERDF
|
Q15/15
|
2016-09-06 |
|
[ 2173 ]
|
Copy G.8275.1 Appendix V to G.8275.2 [G.8275.2]
|
Microsemi Corporation
|
Q13/15
|
2016-09-06 |
|
[ 2172 ]
|
Various corrections for G.9901
Duplicate of C2174
|
ERDF
|
Q15/15
|
2016-09-06 |
|
[ 2171 ]
|
Monitoring PTP connections with alternateMasterFlag [G.8275.1]
|
Microsemi Corporation
|
Q13/15
|
2016-09-06 |
|
[ 2170 ]
|
G.fast: Mobile backhaul use cases
|
British Telecommunications Public Ltd. Co. (BT Plc)
|
Q4/15
|
2016-09-06 |
|
[ 2169 ]
|
Update to Appendix V tables for Synchronization Uncertain [G.8275.1]
|
Microsemi Corporation
|
Q13/15
|
2016-09-06 |
|
[ 2168 ]
|
G.8266: Noise Transfer
|
Calnex Solutions Limited
|
Q13/15
|
2016-09-06 |
|
[ 2167 ]
|
G.8262: Correction to Long-Term Phase Transient
|
Calnex Solutions Limited
|
Q13/15
|
2016-09-06 |
|
[ 2166 ]
(Rev.1) |
Typo fix seconds/bit [G.8271]
|
Microsemi Corporation
|
Q13/15
|
2016-09-06 |
|
[ 2165 ]
(Rev.1) |
ODU SMP Operations Considerations
|
Huawei Technologies Co., Ltd.
|
Q9/15, Q14/15
|
2016-09-06 |
|
[ 2164 ]
|
Considerations on 'Lockout of Protection (LoP)' for G.odusmp
|
China Unicom
,
Huawei Technologies Co., Ltd.
|
Q9/15
|
2016-09-06 |
|
[ 2163 ]
(Rev.1) |
G.8272.1 Holdover
|
ADVA Optical Networking
,
Microsemi Corp
|
Q13/15
|
2016-09-06 |
|
[ 2162 ]
|
G.fast: identifying and completing missing elements in the SRA procedure in G.9701 Corrigendum 3
|
Sckipio Technologies S.I. Ltd.
|
Q4/15
|
2016-09-06 |
|
[ 2161 ]
|
G.8271.2 Burst limit
|
Nokia Solutions and Networks GmbH & Co. KG
|
Q13/15
|
2016-09-06 |
|
[ 2160 ]
|
G.fast: Clarification on bitswap constraints
|
Broadcom Corporation
|
Q4/15
|
2016-09-06 |
|
[ 2159 ]
|
G.ploam: Corrigendum item to G.997.2
|
Broadcom Corporation
|
Q4/15
|
2016-09-06 |
|
[ 2158 ]
|
Document withdrawn
|
N/A
|
|
2016-09-06 |
|
[ 2157 ]
|
Upstream dual-rate coexistence PMD reference design examples for TWDM PON
|
FiberHome Technologies Group
|
Q2/15
|
2016-09-06 |
|
[ 2156 ]
+Corr.1 |
Proposal to modify procedural agreement between Q11 and Q6 regarding strong HD-FEC
|
Deutsche Telekom AG
,
Acacia
,
Alcatel-Lucent USA
,
China Unicom
,
Cisco
,
Comcast
,
Coriant
,
Fujitsu
,
Inphi
,
Juniper
,
LM Ericsson
,
NTT
,
Orange
,
Telecom Italia
,
Telefon AB
,
Telefonica
|
Q6/15, Q11/15
|
2016-09-06 |
|
[ 2155 ]
|
G.ploam: Working text to support Annex T of G.9701
|
ADTRAN
,
AT&T, Inc.
,
Sckipio Technologies S.I. Ltd.
|
Q4/15
|
2016-09-06 |
|
[ 2154 ]
|
G.fast: Working text for Annex T
|
ADTRAN
,
AT&T, Inc.
,
Sckipio Technologies S.I. Ltd.
|
Q4/15
|
2016-09-06 |
|
[ 2153 ]
|
G.fast: Update of working for Annex S (NT software upgrade)
|
ADTRAN
,
AT&T, Inc.
,
Sckipio Technologies S.I. Ltd.
|
Q4/15
|
2016-09-06 |
|
[ 2152 ]
|
G.fast: Update of coax cable configurations working text for Annex X
|
ADTRAN
,
AT&T, Inc.
,
Sckipio Technologies S.I. Ltd.
|
Q4/15
|
2016-09-06 |
|
[ 2151 ]
|
G.fast: Wideband transmit power for profile 212a
|
Intel Corporation
,
Sckipio Technologies S.I. Ltd.
|
Q4/15
|
2016-09-06 |
|
[ 2150 ]
(Rev.1) |
Prysmian Group view on consent of ITU-T Recs. G.652 and G.657
|
Prysmian SpA
|
Q5/15
|
2016-09-06 |
|
[ 2149 ]
|
Comment to the Link Design Analysis for cabled fibre optic attenuation
|
Prysmian SpA
|
Q5/15
|
2016-09-06 |
|
[ 2148 ]
(Rev.1-2) |
Staircase FEC as a candidate for Standard OTU4 MV IaDI Metro application
|
Deutsche Telekom AG
,
Acacia
,
China Unicom
,
Cisco
,
Comcast
,
Coriant
,
Fujitsu
,
Inphi
,
Juniper
,
LM Ericsson
,
NTT
,
Orange
,
Telecom Italia
,
Telefon AB
,
Telefonica
|
Q6/15, Q11/15
|
2016-09-06 |
|
[ 2147 ]
|
Comment about the length dependence of cut-off wavelength and impacts on system performance
|
Prysmian SpA
|
Q5/15
|
2016-09-06 |
|
[ 2146 ]
(Rev.1) |
G.fast: A framework for seamless reconfiguration
|
British Telecommunications Public Ltd. Co. (BT Plc)
,
Intel Corporation
|
Q4/15
|
2016-09-06 |
|
[ 2145 ]
|
G.fast: communicating DTA_enable and DTA_max_Mds from the FTU-O to the FTU-R for DTA operation
|
Sckipio Technologies S.I. Ltd.
|
Q4/15
|
2016-09-06 |
|
[ 2144 ]
|
Test of EVM scripts for draft revised G.698.2
|
Huawei Technologies Co., Ltd.
|
Q6/15
|
2016-09-06 |
|
[ 2143 ]
|
Considerations on optical transceiver module for G.metro
|
China Unicom
,
Huawei Technologies Co., Ltd.
|
Q6/15
|
2016-09-06 |
|
[ 2142 ]
|
Revision of the description of cross-polarization modulation
|
Huawei Technologies Co., Ltd.
,
Orange
|
Q7/15
|
2016-09-06 |
|
[ 2141 ]
|
Comments on Table 9-1/G.8021
|
NEC Corporation
,
Huawei Technologies Co., Ltd.
|
Q9/15, Q14/15, Q10/15
|
2016-09-06 |
|
[ 2140 ]
|
Comments to the latest draft of G.Sup-ELPDNI
|
Electronics and Telecommunications Research Institute (ETRI)
,
Huawei Technologies Co., Ltd.
|
Q9/15
|
2016-09-06 |
|
[ 2139 ]
|
Use of bridges and selectors in the latest draft of G.Sup-ELPDNI
|
Electronics and Telecommunications Research Institute (ETRI)
,
Huawei Technologies Co., Ltd.
|
Q9/15
|
2016-09-06 |
Resultats:2210 documents Résultats :
-
1 -
2 -
3 -
4 -
5 -
6 -
7 -
8 -
9 -
10 -
11 -
12 -
13 -
14 -
15 -
16 -
17 -
18 -
19 -
20 -
21 -
22 -
23 -
24 -
25 -
26 -
27 -
28 -
29 -
30 -
31 -
32 -
33 -
34 -
35 -
36 -
37 -
38 -
39 -
40 -
41 -
42 -
43 -
44 -
45
- Suivant
|
Téléchargement de multiples documents: Formats et langues à prendre en compte (si disponibles):